SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIOy RELATED TO LICENSEE RESPONSE TO GENERIC LETTER 83-28 ITEMS 3.2.1 AND 3.2.2 POST-MAINTENANCE TESTING (ALL OTHER SR COMPONENTS)

COMMONWEALTH EDISON COMPANY BRAIDWOOD NUCLEAR GENERATING STATION DOCKET N0'5. 50-456 AND 50-457 Introduction Subsequent to the Anticipa.ted Transient Without Scram (ATWS) events at the Salem Nuclear Power Plant, the Commission reviewed intermediate term actions to be taken by the licensees. The actions taken were developed on the basis of information contained in NUREG-1000 " Generic Implications of ATWS events at the Salem Nuclear Power Plant." On July 8,1983, Generic letter (GL) 83-28 was issued by NRR. The letter identified NRC positions developed from review of the Salem ATWS events. These positions are related to reactor trip system reliabi-lity and general management capability. The specific GL 83-28 items covered by this Safety Evaluation are Sections 3.2.1 and 3.2.2, " Post-maintenance Testing (All Other Safety-Related Components)."

By letters dated February 29, 1984, and April 21, 1986, Commonwealth Edison Company responded to specific items of GL 83-28. The licensee summarized the results of the requested review and concluded that this item has been appropriately addressed.

Items 3.2.1 3.2.2, " Post-maintenance Testing (All Other Safety-Related Components)"

The review criteria for these items require that the licensee submit a statement indicating that he has reviewed plant test and maintenance procedures and Technical Specifications to ensure that post-maintenance operability testing of all safety-related components is required. Also, a statement is required that contains a verification that vendor recommended test guidance be reviewed, evaluated and where appropriate, included in the test and maintenance procedures or the Technical Specifications. The staff has evaluated the licensee's February 29, 1984, and April 21, 1986, submittals for this item and has determined it to be adequate in content.

Conclusion The staff concludes that the programs outlined in the licensee's submittals adequately address the requirements of Generic Letter 83-28 for the areas specified in this Safety Evaluation.

Dated: May 30, 1986 m.

The following NRC personnel have contributed to this Safety Evaluation:

l T. E. Taylor fd 8607070057 86C625 l PDR ADOCK 05000456 ,

l A PDR 9

r Mr. Dennis L. Farrar Braidwood Station

(

Commonwealth Edison Company Units 1 and 2 cc:

Mr. William Kortier Ms. Lorraine Creek Atomic Power Distribution Route 1, Box 182 Westinghouse Electric Corporation Manteno, Illinois 60950 Post Office Box 355 Pittsburgh, Pennsylvania 15230 Douglass Cassel, Esq.

109 N. Dearborn Street Joseph Gallo Esq. Chicago, Illinois 60602 Isham, Lincoln & Beale 1150 Connecticut Ave., N. W. Elena 2. Kezelis, Esq.

Suite 1100 Isham, Lincoln & Beale Washington, D. C. 20036 ~

Three First National Plaza Suite 5200 C. Allen Bock, Esq. Chicago, Illinois 60602 Post Offices Box 342 .

Urbana, Illinois 61801 Mr. Charles D. Jones, Director Illinois Emergency Services Thomas J. Gordon, Esq. and Disaster Agency Waaler, Evans & Gordon 110 East Adams Street 2503 S. Neil Springfield, Illinois 62706 Champaign, Illinois 61820 George L. Edgar Ms. Bridget little Rorem -

Newman & Poltzinger, P.C.

Appleseed Coordinator 1615 L Street, N.W.

117 North Linden Street Washington, D.C. 20036 Essex Illinois 60935 Michael Miller, Esq.

Mr. Edward R. Crass Isham, Lincoln & Beale Nuclear Safeguards and One First National Plaza licensing Division 42nd Floor Sargent & Lundy Engineers Chicago, Illinois 60603 55 East Monroe Street Chicago, Illinois 60603

- U. S. Nuclear Regulatory Commission l Resident Inspectors Office '

RRfl, Box 79 Bracev111e, Illinois 60407 Regional Administrator, Region III U. S. Nuclear Regulatory Commission l 799 Roosevelt Road Glen Ellyn, Illinois 60137

~.

l l

Y e