_ _ _
[
'd UNITED STATES 3. ( '1)(s ',
es NUCLEAR REGULATORY COMMISSION
) i WASHINGTON. D. C. 20555
[
v DUQUESNE LIGHT COMPANY OHIO EDISON COMPANY PENNSYLVANIA POWER COMPANY DOCKET NO. 50-334 BEAVER VALLEY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.103 License No. DPR-66 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Duquesne Light Company, Ohio Edison Company, and Pennsylvania Power Company (the licensees) dated January 24, 1986 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical 1
Specifications as indicated in the attachment to this license
)
amendnent, and paragraph ?.C.(?) of Facility Operating License No. DPR-66 is hereby amended to read as follows:
8607030352 860624 DR ADOCK 05000334 PDR
-?-
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Anendment No.103, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This amendment is effective on issuance, to be implemented no later than 30 days after issuance.
FOR THE NUCLEAR REGULATORY COMMISSION hh klesterS.Rubenstein, Director
$65 PWR Project Directorate #2 Division of PWR Licensing-A
Attachment:
Changes to the Technical
~
Specifications Date of Issuance: June 24,1986 i
e e
S e
.l l
l ATTACHMENT TO LICENSE AMENDMENT
, AMENDMENT NO.
TO FACILITY OPERATING LICENSE NO. DPR-66 DOCKET NO. 50-334 i
I Revise Appendix A as follows:
Remove Pages Insert Pages 3/4 1-11 3/4 1-11 a
e l
t e
f G
0
l REACTIVITY CONTROL SYSTEMS CHARCING PUMP SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 One charging pump in the boron injection flow path required by Specification (3.1.2.1) or Low Head Safety Injection Pump (with an open reactor coolant system vent of greater than or equal to 3.14 square inches) shall be OPERABLE and capable of being powered from an OPERABLE emergency bus.
APPLICABILITY:
MODES 5 and 6 ACTION:
With none of the above pumps OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until one charging pump or Low Head Safety Injection pump is restored to OPERABLE status.
SURVEILLANCE REQUIREMENTS 4.1.2.3.1 The above required charging pump shall be demonstrated OPERABLE at least once per 31 days by:
a.
Starting (unless already operating) the pump from the control room, b.
Verifying, that on recirculation flow, the pump develops a discharge pressure of > 2402 psig, and c.
Verifying pump operation for at least 15 minutes.
4.1.2.3.2 All charging pumps, except the above required charging pump, shall be demonstrated inoperable at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control switches are placed in the PULL-TO-LOCK position and tagged.
4.1.2.3.3 When the Low Head Safety Injection pump is used in lieu of a charging pump, the Low Head Saf,ety Injection pump shall be demonstrated OPERABLE by:
a.
Verification of an operable"RWST pursuant to 4.1.2.7 b.
Verification of an operabic, Low Head Safety Injection Pump pursuant to 1
Specification 4.5.2.b.2, c.
Verification of power aQilable* to MOV-1SI-890C with the plug inserted in its control Circuit and an operable Low Head Safety Injection flow path from the RWST to the Reactor Coolant System once O
cer shift, and d.
Verificaticn that the vent is open at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.**
t Emergency backup power nied,not be available
- Except when the vent path is provided with a valve which is locked or provided with remote positen indication, or sealed, or otherwise secured in the open position, then verify these valves open at least once per 7 days.
i BEAVER VALLEY - UNIT 1 3/4 1-11 AMENDMENT NO. H,103
..-. -..