JUN 261986
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. D. Ward of
this office on June 10-13, 1986, of activities at Braidwood Station, Units 1
and 2, authorized by NRC Construction Pennits No. CPPR-132 and No. CPPR-133
and to the discussion of our findings with Mr. G. Groth and others of your
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Conunission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
'
CrigI.RI SIDE ' D 0 U' D T D
J. J. Harrison, Chief.
Engineering Branch
Enclosure:
Inspection Report
No.50-456/86030DRS);
No. 50-457/86023 DRS)
See Attached Distribution
8607020108 e60626
ADOCK 05000456
G
$rrison
I
w
w
RdIe
RIII
RIII
V
ard/lc
Danielson
Pelke
6/2y86
g
7
Q%6
+ 1 ew
i
.
%
Consonwealth Edison Company
2
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Superintendent
P. L. Barnes, Regulatory
Assurance Su
DCS/RSB (RIDS)pervisor
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
G. Derry, ELD
J. Stevens, NRR
The lionorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB