ML20206P135
| ML20206P135 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/28/1987 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 058-02141-EEVB, 58-2141-EEVB, NUDOCS 8704210105 | |
| Download: ML20206P135 (1) | |
Text
,}!)%
Arizona Nuclear Power Project 1997 Igg 37
!f h %
P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 058-02141-EEVB/JRB March 28, 1987
%IONI/ISE Mr. John B. Kartin Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596 Subject :
Certification of the Operability of All Required Systems for Initial Fuel Load Palo Verde Unit 3
Reference:
PVNGS Unit 3 Operating License - NPF-65
Dear Mr. Martin:
As required by Item 1.b of Attachment 1 to the Palo Verde Nuclear Generating Unit 3 Operating License, NPF-65 I am hereby certifying that Item 1.a of Attachment 1 to the License has been completed for the initial fuel load of Unit 3.
The operability of all systems required for the initial fuel load has been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifications.
This has been accomplished by the completion of the applicable surveillance tests or by preoperational testing which verifies meeting the requirements of the Technical Specifications which were performed within the required surveillance interval.
Very truly vnnr=
{
f
/
.\\ R OR E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/JRB/bsc cc:
Roy Zimmerman Art Gehr File:
87-056-026 8704210105 870328 PDR ADOCK 05000278 p
PDR l
$2=o /
i