ML20206P135

From kanterella
Jump to navigation Jump to search
Advises That Certification of Operability of All Required Sys for Initial Fuel Load Completed,Per Tech Spec Item 1.a of Attachment 1 to License NPF-65
ML20206P135
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/28/1987
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
058-02141-EEVB, 58-2141-EEVB, NUDOCS 8704210105
Download: ML20206P135 (1)


Text

,}!)%

Arizona Nuclear Power Project 1997 Igg 37

!f h %

P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 058-02141-EEVB/JRB March 28, 1987

%IONI/ISE Mr. John B. Kartin Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596 Subject :

Certification of the Operability of All Required Systems for Initial Fuel Load Palo Verde Unit 3

Reference:

PVNGS Unit 3 Operating License - NPF-65

Dear Mr. Martin:

As required by Item 1.b of Attachment 1 to the Palo Verde Nuclear Generating Unit 3 Operating License, NPF-65 I am hereby certifying that Item 1.a of Attachment 1 to the License has been completed for the initial fuel load of Unit 3.

The operability of all systems required for the initial fuel load has been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifications.

This has been accomplished by the completion of the applicable surveillance tests or by preoperational testing which verifies meeting the requirements of the Technical Specifications which were performed within the required surveillance interval.

Very truly vnnr=

{

f

/

.\\ R OR E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/JRB/bsc cc: