Forwards Insp Rept 50-423/86-21 on 860624-0811.No Violations Noted.Conservative Attitude of Key Mgt Personnel Noted in Fulfilling Intent of Safety & Tech Spec Requirements
ML20206N438
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/15/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20206N440 List:
References
NUDOCS 8608260254
Download: ML20206N438 (2)


See also: IR 05000423/1986021

Text

1

)

.

.

.-

AUG 151986

,

Docket / License: 50-423/NPF-49

Northeast Nuclear Energy Company

ATTN:

Mr. John F. Opeka

Senior Vice President-Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut

06101-0270

'

Gentlemen:

Subject:

Millstone 3 Routine Inspection 50-423/86-21 (6/24/86-8/11/86)

This transmits the report of the above subject inspection by Messrs. J. Shediosky

and F. Casella of this office.

The inspection findings have been discussed with

Mr. J. Crockett of your staff.

No violations were identified during this inspection.

No reply to this letter is

required.

Our inspectors noted a conservative attitude of key management personnel in ful-

filling the intent of safety and technical specification requirements.

This atti-

tude was repeatedly demonstrated during outage management and PORC meetings.

How-

ever, while the safety significance of the excessive Loop 2 Hot Leg RTO response

time was being deliberated on July 11, we believe that it would have been more

prudent to have tripped the 6 bistables associated with this instrument as soon

as the safety analyses were in question.

In this case, the bistables were tripped

after the day's deliberations were complete and the vendor recommendation was re-

ceived.

We noted the competent and timely response of operations personnel to the loss of

all fourth point feed heater drain pumps on July 21, preventing a total loss of

feedwater and a challenge to the reactor protective systems.

Good communications

and definite lines of authority were evident throughout this incident, which oc-

curred during a shift turnover.

Thank you for your cooperation.

Sincerely, original Signed Byg

N

Edward C. Wenzinger, Chief

Projects Branch No. 3

i

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report 50-423/86-21

8608260254 860815

PDR

ADOCK 05000423

G

PDR

1

x c/

o

\\

E

& ._

,

, . -

.

.

MG I 51986

'

Northeast Nuclear Energy Company

2

s

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

W.-J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

L. Prividy, RI, BV-2

T. Rebelowski, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

Robert J. Bores, DRSS