ML20206M884
| ML20206M884 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 08/20/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20206M890 | List: |
| References | |
| NUDOCS 8608260008 | |
| Download: ML20206M884 (2) | |
See also: IR 05000213/1986014
Text
l
'.
'.
AUG 2 01986
Docket No. 50-213
Connecticut Yankee Atomic Power Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection No. 50-213/86-14
This refers to an inspection conducted by Messrs. N. Dudley, S. Barber and D.
Silk of this office on June 16-17, 1986, of activities authorized by NRC
License No. DPR-61 and to the discussions of our findings held with Messrs. B.
Ruth, J. Deveau and H. Haynes of your staff at the conclusion of the inspec-
tion. Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Our review of your licensed operator training programs indicates that you are
still in a state of transition. Many draft procedures are being used and some
commitments made to the NRC in February 1985 regarding long term actions con-
cerning your requalification program still have not been implemented. Also in
our view, there are some communication problems between your site and corporate
training staffs that need your continued attention to assure that your ex-
pressed goals to achieve lasting improvements in the Haddem Neck training pro-
gram are fully realized.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Se cerely,
Original Signed By:
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure: NRC Region I Inspection Report No. 50-213/86-14
0FFICIAL RECORD COPY
IR HN 86-14 - 0001.0.0
860826000s 860820
,
ADOCK 05000213
l
G
Ij
3
m
.
Connecticut Yankee Atomic
2
Power Company
cc k unc1:
R. Graves, Plant Superintendent
,
D. O. Nordquist, Manager of Quality Assurance
'
R. T. Laudenat, Manager, Generation Facilities Licensing
E. J. Mroczka, Vice President, Nuclear Operations
Gerald Garfield, Esquire
J. Deveau, Assistant Training Supervisor
J. Ferguson, Unit Superintendent
.
'
,
B. Ruth, Training Supervisor
J. Black, Project Manager
J. Haynes, Manager, Operations Training
R. Test, Director, Nuclear Training
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
M. McBride, RI, Pilgrim
J. Shedlosky, SRI, Millstone 1&2
T. Rebelowski, SRI, Millstone 3
J. Akstulewicz, LPM, NRR
&
RI:DRP
RI:
P
R
P
RI:DRP
RJ
P
Dudley/emw
Ke4
r
Kister
McCabe
'
inger
nt&
C
8//J /86
8/Q/86
8// 3/86
8/6/86
8////86
0FFICIAL RECORD COPY
IR HN 86-14 - 0001.1.0
08/11/86