Forwards Insp Rept 50-213/86-14 on 860616-17.No Violations Noted.Communication Between Site & Corporate Training Staffs Need Continued Attention to Ensure That Improvements in Training Program Fully Realized
ML20206M884
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/20/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20206M890 List:
References
NUDOCS 8608260008
Download: ML20206M884 (2)


See also: IR 05000213/1986014

Text

l

'

.

'.

AUG 2 01986

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Inspection No. 50-213/86-14

This refers to an inspection conducted by Messrs. N. Dudley, S. Barber and D.

Silk of this office on June 16-17, 1986, of activities authorized by NRC

License No. DPR-61 and to the discussions of our findings held with Messrs. B.

Ruth, J. Deveau and H. Haynes of your staff at the conclusion of the inspec-

tion. Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

Our review of your licensed operator training programs indicates that you are

still in a state of transition. Many draft procedures are being used and some

commitments made to the NRC in February 1985 regarding long term actions con-

cerning your requalification program still have not been implemented. Also in

our view, there are some communication problems between your site and corporate

training staffs that need your continued attention to assure that your ex-

pressed goals to achieve lasting improvements in the Haddem Neck training pro-

gram are fully realized.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Se cerely,

Original Signed By:

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-213/86-14

0FFICIAL RECORD COPY IR HN 86-14 - 0001.0.0

860826000s 860820 ,

PDR ADOCK 05000213 l

G PDR Ij

m 3

.

Connecticut Yankee Atomic 2

Power Company

cc k unc1:

R. Graves, Plant Superintendent ,

D. O. Nordquist, Manager of Quality Assurance '

R. T. Laudenat, Manager, Generation Facilities Licensing

E. J. Mroczka, Vice President, Nuclear Operations

Gerald Garfield, Esquire

J. Deveau, Assistant Training Supervisor .

,

J. Ferguson, Unit Superintendent '

B. Ruth, Training Supervisor

J. Black, Project Manager

J. Haynes, Manager, Operations Training

R. Test, Director, Nuclear Training

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

M. McBride, RI, Pilgrim

J. Shedlosky, SRI, Millstone 1&2

T. Rebelowski, SRI, Millstone 3

J. Akstulewicz, LPM, NRR

&

RI:DRP RI: P R P RI:DRP RJ P

Kister inger

'

Dudley/emw Ke4 r McCabe

nt& C

8//J /86 8/Q/86 8// 3/86 8/6/86 8////86

0FFICIAL RECORD COPY IR HN 86-14 - 0001.1.0

08/11/86