ML20206M862

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/86-22 & 50-368/86-23 on 860701-31 & Notice of Violation
ML20206M862
Person / Time
Site: Arkansas Nuclear  
Issue date: 08/21/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Tison Campbell
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20206M866 List:
References
NUDOCS 8608260003
Download: ML20206M862 (2)


See also: IR 05000313/1986022

Text

p--

,

.

.,

,

'

'

' O

AUG t ; %

,

n Reply'Re'fer'To:

', ' Dockets: '50-313/86-22

-50-368/8o-23

Arkansas Power.& Light Company

ATTN:

T. Gene Campbell,

Vice President -

Nuclear Operations

P. O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. W. D. Johnson and

C. C. Harbuck of this office during the period July 1-31, 1986, of activities

authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,

Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine, and

other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included operational safety verification,

maintenance, surveillance, followup on previously identified items, Licensee

Event Report followup, and inservice hydrostatic test observation. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

inspectors.

The findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

. violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

l

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

l

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

0:t%' me ry

8608260003 860821

J. E. Gujado

l

PDR

ADOCK 05000313

-

o

pna

J. E. Gagliardo, Chief

Reactor Projects Branch

(see next page)#h

(O(

i

Enclosures:

//h

^

RP3

RPB

C:RPBA8

C:RPB

I

.RPB

CCHarbuchEMurphy ( f)' /LGl

DRHunt'

JEGagl a do

WDJohnson

f /2a/86 $/20/86

2/L'/

f /w/86

.

i

,

.

_

..

_

.

.--

g

w

.

's

s

A'rkansas Power & Light Company

-2-

~

Enclosures:

1.

Appendix A - Notice of Violation

2. . Appendix B - NRC Inspection Report

50-313/86-22

50-268/86-23-

cc w/ enclosures: J. M..Levine, Director

Site Nuclear Operations -

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB

'* Resident Inspector

R. D. Martin, RA

  • EP&RPB
  • Section Chief (RPB/B)
  • D. Weiss, LFMB (AR-2015)
  • RIV File

E. H. Johnson, DRS&P

  • MIS SYSTEM
  • RSTS Operator
  • w/766

,

h

's.

c'.

n

V

T

,.

-

6

  • ~'

-

+ . ,

,

P

~'

- .

l

.

,

,

!

i.

l'

'

.

i

f

p

l

i'

h_