r:

AUG 14 se6 NOTE T0: CRGR MEMBERS MONTHLY REPORT Enclosed is a copy of the sumary of CRGR activities for the period

. July 1 through July 31, 1986. The sumary will be included in the ED0's Weekly Report to the Comission for the week ending August 15, 1986.

/lS Jack Zerbe

Enclosure:

As stated Distribution:

JHSniezek JZerbe DEDROGR cf i,centir_ staff,D,,

ROGR e1J11 PDR'(NRG/CRGR)

{

/

/.:

)

8608210098 860914

'\\ '

PDR REVCP NRCCRGR PDR OFC :DEDROGR

ROGR

..__ :......... :__.. __. y _:.___..___..:______..____:____________:..._________: __________

NAME :BG iel

JZer 4

DATE 18/14/86

8// /86

I

~

DEPUTY EXECUTIVE DIRECTOR FOR REGIONAL OPERATIONS AND GENERIC REQUIREMENTS l

(DEDROGR)

Week Ending August 15, 1986 CRGR Attached is a summary of the CRGR activities for the period July 1 through July 31, 1986. Background material on topics reviewed by the Connittee and the minutes of CRGR meetings are sent to the Commission. Copies are provided to thu Public Document Room after the NRC has considered (in a public forum) or decided the matter addressed by the documents. Questions concerning this monthly report should be referred to Walt Schwink (492-8639).

4 4

Data: August 15, 1986 Page 1 cf 1

SUMMARY

OF CRGR ACTIVITIES f

~

(July 1 through July 31, 1986)

Meeting No.

Meeting Date (Announcement CRGR CRGR Recommendation Date)

Agenda Status to EDO EDO Action I

91 Review, Proposed Final Pending No CRGR recommendation necessary None required at this

//23/86 Revision of ECCS Rule at this time. Review of this time.

Contained in Appendix K and item will continue at a future Section 50.46 of 10 CFR 50 meeting.

-Sponsoring Office - RES

-Category 2 Item j

-Issue # 141 92 Review, Proposed IE Complete CRGR reconnended issuance of None Required. Bulletin

//11/86 Bulletin, Unreliable the Bulletin after modification issued after modification.

Behavior of Sta,.c "0" to reflect CRGR concerns.

Ring Differential Pressure Switches I

-Sponsoring Office - IE

-Category 1 Item j

-Issue #140 i

Th2 CRGR was notified on June 30, 1986, by IE, that IE Compliance Bulletin 86-01, Minimum Flow Logic Problems that Could Disable RHR Pumps was issued. This issuance was in accordance with Section III.C of the CRGR Charter, Revision 1.