ML20206L709
| ML20206L709 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 11/23/1988 |
| From: | Muller D Office of Nuclear Reactor Regulation |
| To: | Hall D ILLINOIS POWER CO. |
| References | |
| NUDOCS 8811300168 | |
| Download: ML20206L709 (6) | |
Text
,
/
~%,
UNITEE) STATES
[
NUCLEAR REGULATORY COMMISSION 5
WASHINGTON. D. C. 30646 k*...*
November 23, 1938 r
Docket No.: 50-461 l
Mr. D. P. Hall, Vice President Illinois Power Company Clinton Power Station P.O. Box 678 Clinton, Illinois 61727
Dear Mr. Hall:
The purpose of this letter is to inform you that a recent NRC inspection of records belonging to Planned Maintenance Systems, Incorporated (PMS) of Mount Vernon, Illinois, indicated that you may have purchased Class 1E components or services from PMS for your Clinton Power Station. The enclosure to this letter contains reference purchase order numbers and dates for suspected purchases by your facility from PMS.
As discussed in NRC Information Notice 88-19. "Questiorable certification of Class 1E Components," dated April 26, 1988, a 10 CFR Part 21 notification sub-mitted on April 1,1988 by Wolf Creek Nuclear Operating Cc"poration (WCf400) brought into question the validity of Certificates of Complunce issued by PMS for Class IE equipment. The PMS Certificate of Compliance, supplied with the order, certified that all of the procurement document requirements had bcen met and to deviations from the requirements had been identified.
However, a subse-quent WCN0C surveillance revealed that the records in PMS's possession did not support the statement on the PMS Certificate of Compliance that all the purchase order requirements had been met.
In response to this notification, the NRC staff inspected PMS. The fiRC inspectors found several additional instances where certifications issued by Pits con /ing safety-related electrical equipment, which they had supplied to licensees, were not adequately supported >y documentation in PMS's possession.
In addition, PMS could not provide the NRC inspectors with sufficient information to accurately identify the amount or type of Class 1E equipment they may have suoplied to nuclear facilities.
You should review your purchasing records for the period from January 1 1985, thedatePMSstartedbusiness,tothepresenttoidentifyprocurementsfromPMS.
If you determine that you have procured safety-related components from PMS, you should take appropria.e action to ensure that the identified corponents art in compliance wit 1 t1e applicable NRC requirements and industry standards.
/f
{$A*3Sf$$ $0$ht p
Mr. D.' P. Hall,
i If you have any questions concerning this matter, please contset me or the technical cc.. tact listed below.
Sincerely, k
--r-Danie' R. Muller Director Project Directorate !!! 2 Division of Reactor Projects - !!!,
j IV, V, and Special Projects I
Enclosure:
List of Materials Procured from PMS cc:
A. Davis, RI!
D. Muller, NRA i
J. Stevens, NRR l
I
{
Technical
Contact:
Jose h J. Petrosino, NRR (301 492-0979 J
Larry B. Parker, NRR i
(301) 492-3191 i
l 4
L r
1 L
I
[
L
[
1 r
l i
f 1
i ENCLOSURE List of Materials Procured from PMS s
I Site Shipped To:
Clinton Power St& tion 1.
Illinois Power Company I
Purchase Order No. X-36141 Dated June 16, 1926 For 5 each Switch Temperature Manual. Disc Type 2.
Illinois Power Company r
Purchase Order No. X-3563)
Dated June 13, 1986 For 5 each Switch Temperature. Auto Disc Type l
I i
i i
i 1,
i A
?
/O-V* '
November 23, 1988 1
Mr. D. P. Hall 2
i i
If you have any questions concerning this matter, please contact me or the technical contact l\\sted below.
Sincerely, migial tigr.:j t/
t:,nl R. IMitt Daniel R. Muller, Director Project Directorate III.2 Division of Reactor Projects. !!!,
!Y, V, and Special Projects i
Enclosure:
List of Materials Procured from PMS 1
cc:
A. Davis, RI!!
D. Huller, NRR l
J. Stevens, NRR i
Technical
Contact:
Joseph J. Petrosino, NRR l
(301) 492-0979 Larry B. Parker, NRR (301) 492 3191 Distribution:
VI5 R/T DRIS R/F JStevens BGrimes BBrach DMuller UPotapovs JPetrosino LParker Central Files
/
DocketFiles(99901101/8801)v Louther JRIDS Code IE:09 PD32 r/f DCrutchfield
- See previous concurrence LA:DRP/1,1) IV/V Llutherv 11/J N8 JFC
- VI5:DRI5:NRR
- VIB:DRI5:NRR :C:VIB:DRI5:NRR:D:DRI5;NRR
- DRP/III/IV/V :
P:NRR r
- DMCru field l(AME :'LBParker:inge
- UPotapovs
- EWBrach
- BKGrimes
- Dp)
......:................:..............:..............:..............:....f.........:...
DATE :10/18/88
- 10/19/88
- 10/19/88
- 10/20/88
- 11/F/88
/ /88 l
.+
t Mr. D. P. Hall 2-If you have any questions concerning this matter, pleace contact r,e or the technical contact listed below, i
Sincerely, 1
i
/
/
/
Enclosure:
List of Materials i
Procured from PMS l
7
/
cc:
A. Davis, Pl!!
i D. Muller, NRR i
J. Stevens.,NRR i
Technical
Contact:
Joseph J. Petrosino, NRR i
(301) 492 0979 l
Larry B. Parker, hRR (301) 492-3191 Distribution:
i VIB R/F
[
DRIS R/F
)
BGrimes BBrach UPotapevs l
1 JPetrosino LParker 4
I Central Files DocketFiles(93901101/8801) l RIDS Code IE:09 j
0Crutchfield l
RDudley I
d Qf ), )
i" ^
~
- YIB:DRI5:hRR :C: '
III/IV/V
- ADP:hRR
...... :....q p....... :. i.p : DR I'. h RR : D : DF 5.
OFC
- VIB:DRIS P
,.,e W W...........--.
MAME
- LBPa.
mgc
- UPot&povs WBrach
- rJ0.d'ay
- 0MCrutchfield DATE
- 10/19/88
- 10/l4/88 210/lel/88
- 10n.c/88
- fh/#/88
- 10/ /88
November 23, 1988 Mr. D. P. Hall 2
s If you ha"3 any questions concerning this matter, please contact me or the technical contact listed below.
Sincerely, Origini s!;rd 17 taniel R. I.W'.lc*
Daniel R. Muller, Director Project Directorate !!!.2 Division of Reactor Projects. !!!,
IV, Y, and Special Projects
Enclosure:
List of Materials Procured from PM3 cc:
A. Davis, RII i
D. Nuller, NRR t
J. Stevens, NRR l
l I
i i
Technical
Contact:
Joseph J. Petrosino, NRR (301)492-0979 l
Larry B. Parker, NRR (301) 492 3191 Dist.* ;bu tion:
VIB R/F L2!S R/F JStevens l
BGrimes BBrach DMu11e r UPotapovs JPetrosino LParker Central Files Docket Files (99901101/88 01)
LLuther F;lDS Code IE:09 PD32 r/f DCrutchfield i
- See previous concurrence LA:DRP/II. IV/V LLuther 1
11/J:L/
l
]FC
- VI5:DRI5:NRR
- VI5:DRI5:NRR :C:VIB:DRI5:NRR:D:DRI5:NRR
- DRP/III/IV/V :
P:NRR i
4AME **LBParker:mgc
- UPotapovs
- EWBrach
- BKGrimes
- D
- DMCru ield
......:................:..............:..............:..............:.yp)er
...f.........:...
JATE t10/18/B8
- 10/19/88
- 10/19/88
- 10/20/88
- 11 N/88
- / /88 I
_ _. _. - - -