ML20206L696

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/88-37 & 50-368/88-37 on 881017-1104.No Violations or Deviations Noted
ML20206L696
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/22/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20206L699 List:
References
NUDOCS 8811300159
Download: ML20206L696 (2)


See also: IR 05000313/1988037

Text

-g

-

. ;.,

._

~

.

..

h

_. , + , ..

p

,

..

,

NOV 2 21988

'

-

.

.

.

In Reply Refer To:

[

Dockets:

50-313/88-37

8

50-368/88-37

l

>

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

'

Vice President, Nuclear

Operations -

~

"

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. R. G. Taylor of this office

during the period October 17 through November 4,1980, of activities authorized

,

by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1

'

and 2, and to the discussion.of our findings with Mr. J. M. t.evine and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection involved your capability for self-

assessment and compliance with the respective operating license Technical

Specification reo,uirements as they pertain to functions of the Plant Safety

j.

Comnittee and the Safety Review Comittee.

!

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

i

,

'

observations by the NRC inspector.

The inspection findings are documented in

'

the er.-losed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

',

discuss them with you.

j

j

Sincerely,

i

I

,

Crictr2

'I D

I

"

l

L. L L.ba

A. J. Callan Director

Division of Reactor Projects

y

I

'

Enclosure:

I

Appendix - NRC inspection Report

50-313/88-37

['

i

'

50-368/88-37

p

JRI:M80PS

C:MAQPS *

-

Sia

D:DRk

f

j

aylor/cjg

IBarnes

q4Lilhdan

tdCallan

gf

l

.

// h t / 88

/ /88

y 1?/88

\\\\ /M88

y

j

'

.

pTdMIN#

.

,c

.

.

.

Arkansas Power & Light Companf

-2-

cc w/ enclosure:

,

Arkansas Nuclear One

ATTN:

J. M. Levine, Director

Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bce to DMB (IE01)

bec distrib by RIV:

,

  • RRI
  • R, D. Martin, RA

'

  • RPB-DRSS
  • Section Chief (ORP/A)

Lisa Shea, RM/ALF

  • RIV File
  • 0RP

'

  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/A
  • C. Harbuck, NRR Project Manager (MS:

13-0-18)

,

  • 0RS
  • R. Taylor
  • I. Barnes

'

  • w/766

i

!

.

1

L

>

!

,

i

<

t

I

f

-

-