ML20206L573
| ML20206L573 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 11/21/1988 |
| From: | Oconnor P Office of Nuclear Reactor Regulation |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| GL-83-28, NUDOCS 8811300063 | |
| Download: ML20206L573 (5) | |
Text
Novemt,or 21, 1988 e
O' Docket flo. 50-A98 Mr. George A. Trevors, Division l'anager - fluclear Support itebraska Public Power District Post Office Box 499 Colurbus, liebraska C8601
Dear Mr. Trevors:
SUCJECT:
PEQL'EST FOR ALDIT10h/L INFOR!tATION RELATED 10 GEtiERIC LETTER 83-28 ITEMS ?.1 AftD 2.F lhe staff is ccntinuing its review of your subinittels dated toverter 4,1983 and July 1,1905. To permit us to continue cur rcvi m on our current schedu'.e we require that the infornation requestoc' in the enclosure to be provided within 30 days of your receipt of this letter.
The reporting and/or recordkeeping requirecents in this letter affect fewer then 10 respondents; therefore, Ct'B clearance is not requircd under PL 96-511.
Sincerely,
/s/
Paul W. O'Connor, Project l'anager Project Directorate - IV Division of Reactor Projects - !!!,
IV, V and Special Projects Office of fiuclear Reactor Pegulation
Enclosure:
As stated Cc w/enclosuic:
See next page
. DISTRIBUTION
~
7,FC PDR Locol FOR PC4 Reading No'cETF L. Pubenstein J. Celvo P. f:o' nan P. O'Connor CGC-Pockville E. Jordan B. Grires ACES (10)
P04 Plant file PD4/
(
PO4/f t1 FC4/D 0 Flicons P0'Conr.or:sr JCelvo 11////fS 11/2//F8 11/tI/F8 8811300063 881121,m g' g FDR ADOCK 050002 o FDL p
November 21, 1983 0,.
b Docket No. 50-498 Nr. George A. Trevors, Division Panager - Nuclear Support Nebraska Public Power District Post Offit.e Box 499 Columbus, Nebraska 68601
Dear Mr. Trevors:
SUBJECT:
REQl'EST FOR ADDITIONAL INFORMATION RELATED TO GENERIC LETTER 83-28 ITEMS 2.1 AND 2.2 The staff is continuing its review of your submittels dated November 4,1983 and July 1, 1985. To permit us to continue our review on our current schedule we require that the information requested in the enclosure to be provided within 30 days of your receipt of this letter.
The reporting and/or recordkeepir.g requirements in this letter affect fewer than 10 resper. den's; therefore, CFB clearer.ce.is not requircd under PL 96-511.
Sincerely,
/s/
Paul W. O'Connor. Project Manager Project Directorate - IV Divisico of Reactor Projects - I!!,
IV, Y and Special Projects Office of tiuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION MWt'FTTi-KFC PDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. i:conan P. O'Connor OGC-Pockville E. Jordan B. Grimes ACRS(10)
PD4 Plant File PD4/
PD4/FM PD4/D Pl;oon P0'Connor:sv JCalvo 11/g/E8 11/2//68 11/1l/88 i
',' ! ( f **teh UNITED STATES va NUCLEAR REGULATORY COMMISSION
,, D WASHING TON, D. C. 20666
%g*....
Novemb~er 21, 1988 l
r Docket No. 50-498 Mr. Gecrge A. Trevors. Division Manager - Nuclear Supaort Nebraska Public Power District Post Office Box 499 Columbus, Nebraska 68601
Dear Mr. Trevors:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION RELATED 10 GENERIC LETTER 63-28 ITEMS 2.1 AND 2.?
The staff is cuntinuing its review of your submittels dtted Nover..ber 4,19P3 are July 1,1985.
To permit us to continue our review en our current schedule we require that the infore,ation requested in the enclosure to be provided within 30 days of your receipt of this letter.
The reportinC er.d/or recordkeeping requiretrents in this letter affect fewer than 10 respondents; therefore, OPE clearance is not required under PL 9E-511.
Sincerely, J0 fkYOW Paul k'. O'Connor, Proff.ct l'anager Project Directcrate - IV Divisien of Reactor Projects - !!!,
!Y, Y and Special Projects Office of Nuclear Reactor Regulation l
Er. closure:
As stated cc w/ enclosure:
See next page J
1
f s
e' iMr. George A. Trevors Nebraska Public Power District Cooper Nuclear Station a
CC:
i Mr. G. D. Watson, General Counsel Nebraska Public Power District P. O. Box 499 Columbus, Nebraska 68601 Cooper Nuclear Station ATTil: Mr. Guy R. Horn, Division i
Manager of Nuclear Operations P. O. Box 98 Brownville, Nebraska 68321 Dennis Grams, Direct;or Nebraska Departrcent of Environnental Control i
P. O. Box 98922 Lincoln, ?*braska 68509-8922 Mr. Larr, och16en, Chairman iterebe County Board of Core 11ssioners
?!coaha Ccunty Courthouse 1824 M Street Auburn,flebraska 68305 i
Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Eox 210 Brownville,i:ebraska 68321 Regional Ads:inistrator, Region IV U.S. lluclear Regulatcry Commission 611 Ryan Plazo Drive, Suite 1000 Arlington, Texas 76011 Mr. Harold Borchart, Director Division of Radiological Health Department of Health 301 Centennial Mall, South P. O. Box 95007 Lincoln, Nebraska 68500-5007 k
u Enclosure REQUESTFORADDITIONALINFORMATION i
GENERIC LETTER 83-28 COOPER NUCLEAR STATION t
DOCKET NO. 50-298 l
r 1.tes_ja],(IRT,]),mponentsEguipmentClassificationReactorTrp Part Systems ,Co i Your July 1,1985 response coafirmed that all RTS components are classified as l safety-related, however, you did not confirm that'these components are identified as safety-related on documents and in procedures used to control activities that control these documents. j f Please confirm that RTS corponents are identified as safety-related on documents and in procedures which control activities that may affect these corpor.ents. i Iter.7.1(Part2} Verify that you have a program that interfaces with General Electric and that you receive all technical bulletins and service information letters and that t 4 the interface includes provisicos that assure that you have received all such technical bulletins and notices that have been issued by General Electric. Item ?.0_ Qart,J),Eg,ujprent Classification For All Safety,-Re, late,d,Cprppnen,ts s lhe.?:h1 :.Lres.r!5 ? i I i Your Nover,ber 4,1983 response has not confirmed that all safety-related l corponents are identified as such on all plant documents, drawings and procedures. [ Therefore, please confirm the existence of a program which controls the designation i of components as safety-related on plant documents, drawings and procedures, i I Item ?.P.1.5,,Desjgn Verification & Procurement q The response has not confirmed that your procurement specifications specifically require the supplier to include verification of design capability and evidence i of testing that qualifies the corponents and parts for service under the f expected condition over the life of conponent or part. Therefore, state that l your procurement specifications meet the above staff position. a j 1 l i .-.}}