Text
..
OG ic e Ctc 9
JUN i ? ggg Docket Nos. 50-424, 50-425 License Nos. CPPR-108, CPPR-109 Georgia, Power Company ATTN: v'Nr. J. H. Miller, Jr.
President, Power Supply P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT:
CONFIRMATION OF MEETING ARRANGEMENTS - GEORGIA POWER COMPANY - V0GTLE This confirms the telephone conversation between Mr. R. E. Conway of Georgia Power Company and Mr. M. V. Sinkule of my staff on June 13, 1986, concerning an enforcement conference to be conducted at the NRC Region II Office in Atlanta on June 23,1986, at 10:00 a.m.
The NRC has requested this meeting to discuss possible enforcement concerning the accuracy of information provided in obtaining NRC acceptance of the elimination of intermediate pipe breaks and associated whip restraints.
Should you have any questions regarding these arrangements, we will be pleased to discuss them with you.
Sinceroly, original Signed by R.D. Walker J. Nelson Grace Regional Administrator
Enclosure:
Meeting Agenda fcw/ encl:
V. E. Conway, Senior Vice President &
Project Director D. O. Foster, Vice President, Project
' Support
/P. D. Rice, Vice President, Project
/. Engineering
. H. Pinson, Vice President, Project Construction J. T. Beckham, Vice President &
General Manager - Operations (cc w/ encl cont'd - see page 2) 860630030o 860617 PDR ADOCK 05000424 9
PDR g- @g A
i
.lWN i 7 1986 Georgia Power Company 2
/(cc cont'd)
V R. A. Thomas, Vice President, Licensing
. S. Read, General Manager, Quality Assurance C. W. Hayer, Vogtle Quality Assurance Manager
/W.C.Ramsey, Manager-j Readiness Review G. B. Bockhold, General Manager, Nuclear Operations ML.Gucwa, Manager,NuclearSafety and Licensing
. H. Googe, Project Construction Manager E. D. Groover, Quality Assurance Site Manager -
Construction J. A. Bailey, Project Licensing
/. Manager G
F. Trowbridge, Esq., Shaw, Pittman, Potts and Trowbridge
/B.W. Churchill,Esq.,Shaw,
/E. L. Blake, Jr., Esq., Shaw, Pittman, Potts and Trowbridge j Pittman, Potts and Trowbridge VJ. E. Joiner, Troutman, Sanders, vd.LockermanandAshmore G. Ledbetter, Comissioner, Department of Human Resources C. H. Badger, Office of Planning
/ and Budget V D. Kirkland, III, Counsel, 4
Office of the Consumer's Utility
/ Council VD. C. Teper, Georgians Against
/.NuclearEnergy M
B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board
/ Panel VDr. O. H. Paris, Administrative Judge Atomic Safety and Licensing Board
'/. Panel G
A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel
. P. Garde, Citizens Clinic, Director t
Government Accountability Project (bcc w/ encl - see page 3)
)
JUN 171986
[
Georgia Power Company 3
jbccw/ encl:
jE. Reis, ELD
/. M. Hill, IE
. Miller, NRR
. Brach, ED0
. Sinkule, RII E. Christnot, RII NRC Resident Inspector Document Control Desk State of Georgia 1
1 i
i l
i j
I J
4
,l i
i l
RII RII u@
RII}
RIdI RI c
EChristnot:jw MSinkule VLBrownlee LReyes R
ker 6/l$/86 6/g/86 6/p/86 h/gh/86
'6//6/86 1
m..
~
i ENCLOSURE i
MEETING AGENDA June 23, 1986 I. Introductory Remarks J. N. Grace II. NRC Enforcement Concerns A. F. Gibson.
III. Discussion of Enforcement Issue All Failure to provide accurate information in obtaining NRC acceptance of pipe whip restraint removal.
IV. Closing Remarks J. N. Grace a
't l
t I
4 I
a l
i 4
l
}
i l
(
l 5
t l
-