ML20206L471

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/88-34 on 881016-21.No Violations or Deviations Noted
ML20206L471
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/23/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20206L476 List:
References
NUDOCS 8811290579
Download: ML20206L471 (2)


See also: IR 05000285/1988034

Text

. ,

.

'/

y

, .-

,

NOV 2 31988

. In Reply Refer To:

Decket:

50-285/88-34

Omaha Public Power District

ATTN:

Kenneth J. Morris, Division Manager

',

Nuclear Operations

.

1623 Harney Street

Omaha, Neoraska 68102

r

Gentlemen:

!

This refers to the inspection conducted by Messrs. H. O. Chaney and

- ,

'

L. T. Ricketson of this office during the period October 16-21, 1988, of

. e

activities authorized by NRC Operating License DPR-40 for the Fort Calhoun

Station, and to the discussion of our find'.ngs with you and other members of

your staff at the conclusion of the inspection.

L

Areas examined during the inspection included the radiation protection program

activities associated with your 1988 refueling outage. Two allegations

concerning the conduct of your. radiation protection program were clso reviewed.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

l

observations by-the NRC inspectors.

The inspection findings are documented in

i

the enclosed inspection report.

Within t'he scope of the inspection, no violations or deviations were

'<

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 3 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

j

i

Sincerely,

4

Original Signni ny

I.. /. CA.in

L. J. Callan, Director

4

,

l

Division of Reactor Projects

l

Enclosure:

i

Appendix - NRC Inspection Report

!

i

50-285/88-34

7

fRPS:RPBl

C:FRPS:RPdC:RPB h:RPS/BQ

D*.DRP 0hhl

Y

F

C

ECAC

RIV:FRPS:PB

r, born LJCalp/88

HDChaney/tw t,TP.icketson SEBaer

3Murray TFWesterman C

n

}{/g/88

p/jt[/88

lig/88

/i //[86 e/jf/88

ll/g)/88

O/t/

4

.

Tcou

- -

. - -- . - -

- . _-

.

,

.

.

.

"Omaha Public Power District

-2-

cc w/ enclosure:

Fort Calhoun Station

ATTN:

W. G. Gates, Manager

P.O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Eso.

LeBoeuf, Lt3b, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D. C.

20036

Nebraska Radiation Conten1 Program Director

bcc to DMB (IE06)

bec distrib, by RIV:

  • R.D. Martin, RA
  • RPB-DRSS
  • Section Chief (DRP/B)
  • MIS System
  • RIV File
  • DRP
  • RSTS Operator
  • Project Engineer, DRP/B

Lisa 3het, RM/ALF

  • P. Milano, NRR Project Manager (13-D-18)
  • DRS
  • RRI
  • BMurray
  • RBaer
  • RBangart
  • RHall
  • DChaney
  • LRicketson
  • w/766