ML20206L441
| ML20206L441 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/17/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20206L447 | List: |
| References | |
| NUDOCS 8606300268 | |
| Download: ML20206L441 (3) | |
See also: IR 05000424/1986043
Text
(thw
s
.
-
.<
,
JUN 171986
Georgia / Power Company
ATTN: vHr. J. H. Miller, Jr.
President, Power Supply
P. O. Box 4545
Atlanta, GA 30302
.
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NO. 50-424/86-43
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. T. Burnett on May 13-15, 1986. The inspection included a review of activities
authorized for your Vogtle 1 facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ encl:
R. E. Conway, Senior Vice President &
i
/D
Project Director
. O. Foster, Vice President, Project
-/ Support
IV P. D. Rice, Vice President, Project
1
Engineering
R. H. Pinson, Vice President, Project
Construction
j
(cc w/ encl cont'd - see page 2).
e606300268 860617
ADOCK 0500
4
o
<
ZE of
,3 s
i
's
JUN 171986
-
,
.
Georgia Power Company
2
fccw/enclcont'd)
VJ. T. Beckham, Vice President &
/ General Marager - Operations
V
A. Thomas, Vice President,
Licensing
D. S. Read, General Manager,
j Quality Assurance
V C. W. Hayes, Vogtle Quality
/.AssuranceManager
W
C. Ramsey, Manager -
) Readiness Review
/G. B. Bockhold, General Manager,
/ Nuclear Operations
/L.Gucwa, Manager,NuclearSafety
/M
and Licensing
. H. Googe, Project
j
/ Construction Manager
/ E. D. Groover, Quality
Assurance Site Manager -
2
/J
Construction
. A. Bailey, Project Licensing
Manager
/G. F. Trowbridge, Esq. , Shaw,
/Pittman,PottsandTrowbridge
v . W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
~
. L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
'
J. E. Joiner, Troutman, Sanders,
/ Lockerman and Ashmore
V J. G. Ledbetter, Commissioner,
/ Department of Human Resources
V C. H. Badger, Office of Planning
/ and Budget
V D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. C. Teper, Georgians Against
j Nuclear Energy
V M. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
/r
Panel
D . O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
/ Panel
V G. A. Linenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
/
Panel
B. P. Garde, Citizens Clinic, Director
Government Accountability Project
bcc w/ encl: (See page 3)
>
n
,
- - -
r
JUN 171986
>
,
Georgia Power Company
3
cc w/ encl:
E. Reis, ELD
W. M. Hill, IE
. Miller, tiRR
. Brach, EDO
M. Sinkule, RII
-
. Christnot, RII
.NJC Resident Inspector
si)ocument Control Desk
t/ State of Georgia
,
RII
RI
RII
PBurne:t:hlm
FJape ,
erdt
6/(j/86
6/(L}66
6/,p/86