Forwards Safety Insp Rept 50-346/88-26 on 880816-0930.No Violations Noted.Litle Progress in Implementing Requalification Training Program for Simulator Scenario Development & Exercise Evaluation Noted
ML20206K340
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/23/1988
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20206K344 List:
References
NUDOCS 8811290373
Download: ML20206K340 (2)


See also: IR 05000346/1988026

Text

$ t,0

-

.

,

.

.

c

NOV 2 31988

..

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Donald Shelton

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. P. M. Byron,

D. C. Kosloff, T. D. Reidinger, D. L. Shepard, T. E. Vandel and L. N. Valenti,

of this office on August 16 through September 30, 1988, of activities at

Davis-Besse Nuclear Power Station, authorized by Facility Operating License

No. NPF-3, and to the discussion of our findings with Mr. L. Storz at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

During the inspection, two operator license examiners conducted a two phase

inspection of the operator annual operating examination.

The primary

objective of the inspection was to ensure that the Davis-Besse operators were

capable of effectively using the station's abnormal operating procedures.

Observations by the examiners indicated that the operators were able to use

the procedures to bring the facility to a stable, safe condition.

The second

part of the inspection cortpared the content and administration of the

examination against the new NRC requalification guidelines.

The results of

this effort appear to indicate that you have made very little progress in

implementing the requalification training program for simulator scenario

development and exercise evaluation.

Because we view this apparent lack of

progress with some concern, we request that you respond to this weakness

within 30 days of the date of this letter informing us of your proposed

plans and schedule for implementing the new requalification program guidance.

GW

,

\\ \\

s811290373 831123

ppR

ADOCK 05000346

FDL

O

.

.

.

.

.

.

Toledo Edison Company

2 NOV 2 31998

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

CBIGI2iAI, CIGNED SY E. G. GRICCGN

Edward G. Greenman, Director

DivisionofReactorProjects

Enclosure:

Inspection Report

No. 50-346/88026(DRP)

cc w/ enclosure:

L. Storz, Plant Manager

DCD/DCB (RIOS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

James W. Harris, State of Ohio

Robert M. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Commission

II

III

RII

RI{

RIII

RI

'

WM:

-(h/(*-

Gr% 3)

F

i

De

v tte/ jaw

h1

t

R

urd1ck

eennran

ll IT}l)

dinger /g 7 p

tb ,f$

lillk

h