Forwards SER Re Util 831108,840316 & 860110 Responses to Generic Ltr 83-28,Item 1.2, Post-Trip Review - Data & Info Capability. Responses Acceptable
ML20206H955
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/24/1986
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20206H958 List:
References
GL-83-28, NUDOCS 8606260370
Download: ML20206H955 (3)


Text

'

June 24,1986 Docket No.: 50-245 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECl: GENERIC LElikk 63-26 AT'J'; ITEM 1,2, POST TRIP REVIEW -

DATA AND INFORMATION CAPABILITY Re: Millstone Nuclear Power Station, Unit No. 1 By letters dated November 8, 1983, March 16, 1984, and January 10, 1986, Northeast Utilities responded to Generic Letter 83-28 with regard to the actions required based on the generic implications of the Salem ATWS events.

Our draft technical evaluation report, based on the information provided in your first two letters, was issued on November 6,1985. Your January 1986 letter provided additional information responsive to the open items in our November 6,1985 letter and the telephone conversation on December 16, 1985 between Northeast Nuclear Energy Company and Nuclear Regulatory Commission representatives. Based on the information you have provided in these three submittals, we have concluded that the post-trip review data and information capabilities for Millstone Nuclear Power Station, Unit 1, are acceptable.

This issue is, therefore, resolved for Millstone Unit 1. A copy of our safety evaluation is enclosed.

Sincerely, Original signed by: C. I. Grimes Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B

Enclosure:

DISTRIBUTION As Stated L IDocket File; EJordan NRC PDR MBoyle cc: See Next Page Local PDR OELD CGrimes ISAP Reading BGrimes JJKramer Nk r mes #adow P

kDock 0500 2 FMiraglia JShea PDR NSIC PAnderson ISAP:DPL-B g IS '

ISAP:DPL-B .

JShea:lt PA n CGrimes l 06g86 06/h5/86 06$/86 t

T g

pmo

%, UNITED STATES )

y p, NUCLEAR REGULATORY COMMISSION  ;

E j WASHINGTON, D. C. 20555  ;

% ,,,,, ! June 24,1986 Docket No.: 50-245 ,

l Mr. John F. Opeka, Senior Vice Preride.nt Nuclear Engineering and Operations ,

Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

GENERIC LETTER 83-28 ATWS ITEM 1.2, POST TRIP REVIEW -

DATA AND INFORMATION CAPABILITY Re: Millstone Nuclear Power Station, Unit No. I By letters dated November 8, 1983, March 16, 1984, and January' 10, 1986, Northeast Utilities responded to Generic Letter 83-28 with regard to the actions required based on the generic implications of the Salem ATWS events.

Our draft technical evaluation report, based on the information provided in your first two letters, was issued on November 6, 1985. Your January 1986 letter provided additional information responsive to the open items in our November 6,1985 letter and the telephone conversation on December 16, 1985 between Northeast Nuclear Energy Company and Nuclear Regulatory Commission representatives . Based on the information you have provided in these three submittals, we have concluded that the post-trip review data and information capabilities for Millstone Nuclear Power Station, Unit 1, are acceptable.

This issue is, therefore, resolved for Millstone Unit 1. A copy of our safety evaluation is enclosed.

t.

Sincerely, b.$-

Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - 8

Enclosure:

As Stated cc: See Next Page i

Mr. John F. Opeka Millstone Nuclear Power Station Northeast Nuclear Energy Company . Unit No. I cc:

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry % l'oward Radiation Control Unit Counselors at Law Department of Environmental City Place . Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Edward J. Mroczka Vice President, Nuclear Operations Richard M. Kacich, Supervisor Northeast Utilities Service Company Operating Nuclear Plant Licensing Post Office Box 270 Northeast Utilities Service Company Hartford, Connecticut 06141-0270 Post Office Box 270 Hartford, Connecticut 06141-0270 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

- Northeast Nuclear Energy Company ATTN: ' Superintendent Millstone Nuclear Power Station P. O. Box 128 Waterford, Connecticut 06385 Resident Inspector c/o U.S. NRC Millstone Nuclear Power Station P. O. Box 811 Niantic, Connecticut 06357 First Selectman of the Town ,

of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385