Forwards Safety Evaluation Accepting Util Relief Requests 5003 & 5004.Util Should Certify Compliance W/Commitments When Replacements Completed
ML20206H900
Person / Time
Site: Clinton 
Issue date: 11/21/1988
From: Stevens J
Office of Nuclear Reactor Regulation
To: Holtzscher D
ILLINOIS POWER CO.
Shared Package
ML20206H903 List:
References
NUDOCS 8811230430
Download: ML20206H900 (4)


Text

__

November 21, 1988 Docket No.:

50-461 DISTRIBUTIO[N Docket file JStevens NRC & Local PDRs OGC Mr. Dale L. Holtzscher PDIII-2 r/f Edordan Acting Manager - Licensing and Safety DMuller BGrimes Clinton Power Station MVirgilio ACRS(10)

Post Office Box 678 LLuther PD32 p/f Mail Code V920 Clinton. Illinois 61727

Dear Mr. Holtzscher:

SUBJECT:

INSERVICE INSPECTION RELIEF REQUESTS FOR THE CLINTON POWER STATION The staff has reviewed Inservice Inspection Relief Request Numbers 5003 and 5004 for the Clinton Power Station per Illinois Power Company's (IP's) letters dated March 30, 1988 and August 3, 1988. The enclosed safety evaluation concludes that IP's comitments provide a sufficient basis for justifying the relief requests for replacement parts without ASME certification. Hence these l

t relief requests are acceptable. However. IP should certify compliance with their coritments when replacements are completed.

For further information or clarification, please contact me at (301) 492-1397.

f5 1

Janice A. Stevens, Project Manager i

Project Directorate III-2 Division of Reactor Projects - III, IV, V, and Special Projects s

Enclosure:

I i

As stated t

cc: See next page l

S. Hou i

PD111-2:PM PDIII-2:L.

P MD l

JStevens:dmj LLutherv,

D er 11/ / 7 /88 11/n /8 Ilp;/88 p/

l SS11230430 681121 PDR ADOCK 03000461 ii Q

PDC

{

November 21, 1988

'(

Doi:ket N'o.: 50-461 DISTRIBtlTION i

Docket file JStevens NRC & Local PDRs OGC Mr. Dale L. Holtzscher PDIII-2 r/f EJordan Acting Manager - Licensing and Safety 0 Muller BGrimes Clinton Power Station MVirgilio ACRS(10)

Post Office Box 678 LLuther PD32 p/f Mail Cooe V920 Clinton, Illinois 61727 Mar Mr. Holtzscher:

SUBJECT:

INSERVICE INSPECTION RELIEF REQUESTS FOR THE CLINTON POWER STATION The staff has noviewed Inservice Inspection Relief Request Numbers 5003 and 5004 for the Clinton Power Station per Illinois Power Company's (IP's) letters dated March 30, 1988 and August 3, 1988. The enclosed safety evaluation concludes that IP's comitments provide a sufficient basis for justifying the relief requests for replacement parts without ASME certification. Hence these relief requests are acceptable. However, IP should certify compliance with their comitments when replacements are completed.

For further information or clarification, please contact re at (301) 492-1397.

Janice A. Stevens, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V, and Special Projects

Enclosure:

i As stated cc: See next page S. Hou I

i l

PDI!!4:PM PDI!!-2:

PD MD JStevens:dmj LLuthe

'er 11/ /7 /88 11/n /8 11p;/88 i

l t

pa ase uq'o UNITED STATES

^g NUCLEAR REGULATORY COMMISSION o

W ASHINOTON, D, C,20665 e

  • ....,/
  • g November 21, 1988 Docket No.: 50-461 Mr. Dale L. Holtzscher Acting Manager - Licensing and Safety Clinton Power Station Post Office Box 678 Mail Code V920 Clinton, Illinois 61727

Dear Mr. Holtzscher:

SUBJECT:

INSERVICE INSPECTION RELIEr REQUESTS FOR THE CLINTON POWER STATION The staff has reviewed Inservice Inspection Relief Request Numbers 5003 and 5004 for the Clinton Power Station per Illinois Power Company's (IP's) letters dated March 30, 1988 and August 3,1988.

The enclosed safety evaluation concludes that IP's commitments pro'ide a sufficient basis for justifying the relief requests for replacement parts without ASME certification. Hence these relief requests are acceptable. However, IP should certify compliance with their comitments when replacements are completed.

For further infomation or clarification, please contact me at (301) 492-1397.

O. %

Janice A. Stevens, Project Manager l

Project Directorate III-2 Divistun of Reactor Projects - III, l

!Y, V, and Special Projects Enclosuri:

As stated cc: See next page S. Hou I

l l

l L

l Mr. Dale L. Holtzscher Clinton Power Station Illinois Power Company Unit I cc:

Mr. L. Larson Mr. D. P. Hall Project Manager Vice President General Electric Company Clinton Power Station 175 Curtner Avenue, N/C 395 P. O. Box 678 San Jose, California 95125 Clinton, Illinois, 61727 Regional Administrator, Region III Mr. R. D. Freeman 799 Roosevelt Road, Bldg. f4 Manager-Nuclear Station Engineering Dept.

Glen Ellyn, Illinois 60137 Clinton Power Station P. O. Box 678 Chairman of Dewitt County Clinton, Illinois 61727 c/o County Clerk's Office DeWitt County Courthouse Sheldon Zabel, Esquire Clinton, Illinois 61727 Schiff Hardin & Waite 7200 Sears Tower Illinois Department 233 Wacker Drive

'of Nuclear Safety Chicago, Illinois 60606 Division of Engineering 1035 Outer Park Drive, 5th Floor Resident Inspector Springfield Illinois 62704 U. S. Nuclear Regulatory Commission RR 3. Box 229 A Mr. Donald Schopfer Clinton, Illinois 61727 Project Manager Sargent & Lunay Engineers 55 East Monroe Street Chicago, Illinois 60603 L

i j

r i

1

__ -.__ __-