.!pHog,$
NUCLEAR REGULATORY COMMis$lON 3~(
a UNITE 3 STATES
- f RECtON lli p (g ((( L' 5
799 AooSEVELT ROAD
(
4 oLEN ELLYN, ILt,tNOIS 60137
' ' ',, /
H ld l {
k.
u UN }
November 16, 1983
,,eg,,,,g jJ, e d
ewi
'*)
I,n, w /.,
o itEMORANDUM FOR:
A. B. Davis, Deputy Regional Adainistrator 1
/
THRU C. E. Norelius, Director, Division of Projecth And Resident Programs FROM:
W. D. Shafer, Chief, Projects Branch 2 SUBJECT TECo REGULATORY IMPROVEMENT PROGRAM Your memorandum dated November 7, 1983, identifie.: several notes and action items discussed during our November 4, 1983, meeting with the Toledo Edison Company Management. The following is the status of those items:
1.
Our first meeting with TEco on the draft Regulatory Improvement Program is tentatively scheduled for the week of December 11, 1983.
2.
The higher level management meeting is still tentatively set for mid-January 1984.
3.
No action.
4.
We have draf ted our comments on Coronissioner Gilinsky's concerns and they are being typed.
I further understand that we will not fax them to NRR.
Instead we will send NRR a draft copy of the inspection report that describes the meeting (copy attached).
5.
No action.
6.
It is very difficult to identity the amount of time a Vice President and Plant stanager should spend in direct support of facility operations.
The consensus from my staff indicates that for a plant vith no major problems the Plant Manager normally spends about 10% of his time directly supporting the operation of the facility (i.e. plant tours, control room visits, etc.).
About 50 to 70% of the time is spent on administrative work such as meetings, corporate communications, budget, etc.
We all agree that when a plant has major problems the Plant Manager must increase his attention in the area of direct support.
We have no recommendation regarding the amount of time a Vice President should directly support the operation of a facility. However, we also feel that a Vice President's attention would increase as the problems increase.
KOESTER08 S16 PDR s
g A. B. Davis 2
November 16, 1983 7.
The new rule regarding SR0s in the control room is being handled by NRR.
The Monticello fact ity as well as Davis-Besse has proposed extending the boundary of the control room to include the Shift Engineer's office.
We are developing a memorandtun to NRR vhich identifies our position that the licensee's propossi does not meet the intent of the new rule.
Should you have any questions regarding this action I will be happy to meet with you.
"Original signed, lay V. D, Shafor
W. D. Shafer, Chief
- Projects Branch 2
Attachment:
As Stated cc w/ attach:
C. E. Norelius I. N. Jackiv W. G. Rogers Rt G A 'J/,7j HI11
.s b
c is
O Comments on Commissioner G.linsky's Concerns:
Concern:
Manager of Operationn unclear about emergency procedures.
Response
All Emergency and Abnormal Procedures have a note after immediate operation actions are completed to refer to the emergency plan to determine if a parameter han been execeded placing the licennee in the cmcrgency plan.
What constitutes entrance into an act, ion, level of the emergency plan in based on exceeding defined levels such as >100,000 cpm or >40 psi, etc.
The Manat"r of Operations was a qualified SRO and has been trained on the emergency / abnormal procedures and the emergency plan.
Concern:
Fire Procection, failure to comply.
Response
The 1)ivision of Engineering /NRR inspection team made this discovery.
The inspection report la in preparation along with any escalated enforcement.
Concern:
SR0s not la control room,
Response
The licensee has Just completed establishing six complete shif ts.
Esth shift haN a Shi f t SuperVisnr and an AssistanL Shif t Super-visor who have SHO licensen.
The licennee in not required to have the second SRO in the control room until I-1-84.
I J
Concern:
75,000 to 100,000 drawing out of date.
Hesponse:
This is the total number of drawings as.ociated with Davis-Besse. The licensee has all critical drawings up to date with Drawing Change Notices attached as a result of NRC initiative. The licensec is continuing to eliminate the programmatic deficiencies that allowed some of the drawings to get out of dara.
. Concern:
A W pumps have no diverse power supplien and there are only two pumps.
A
Response
Each AW pump is 100% capacity.
Both are steam supplied from different main steam lines, each getting steam from different steam generators. Each pump has the capability of receiving steam from the other steam line a'no.
The AW pump #1 has the capability of supplying AW to the #1 steam generator in the r
advent of loss of all AC power.
Concern:
Auxiliary shutdown panel han marginal instruments.
Rempanse:
Code of Federal Regulations allows instrumentation and control 1
of c.L-St ial equipment outside the control room from other i
than one area In in.: facility.
[
s b
I l
2 i
- "W
" *VATmLTUL%%'?.'.v*
~
Concerns.
Throwover switches all over the plant.
Response
Yes, most facilities are designed this way.
[
Concern:
No functional SPNS.
4
Response
This is true, only portions of SPNS work and the rest is P
under development.
The licensee in not required to have this functional at this time.
Concern:
No functional TSC.
t i
_ Response:
This iN inCotreet. The TSC is functional. The space allocation is adequate. The telephones work.
The drawings i
are controlled.
Personnet sanigned to the center are i
l.
knowledgeable of its location and their responsibilities.
t The TSC h6s properly functioned in three annual exercises i
with the last having NRC participation from Region III and Washington, i
i i
Concernt Evacuation Cuidelinen subjective.
i
Response
The licensen han definud parameters which II exceeded con-stitute evacuation. Ilowever, the licensee does take into 3
account such things as road canditions, time of day and whether the accident conditions is deteriorating or stablir.ing in their evacuation matrix.
i e
3
l Concern:
On Rx trip, uncicar who is in charge.
Response
The Station Superintendent is always in charge. However, the day-to-day lead on identifying and correcting problems does change once the plant is stabilized.
If plant is to so,.
to cold shutdown, the Assistant Superintendent for plant outages taked the lead.
If the plant is to return to power operations the lead remains with the Assistant Superintendent l
for Operations.
Concern:
Plant Manager remote.
t f
r Hemponse:
The Plant Manager's office is outside the protected area.
lloweve r, the Plant Manager tours the control room every 4-raorning that he is at the facility.
Finally, the licensee is preparing to perform a full diagnostic of all directors (including Plant Manager) workloads.
Concern:
Poor LER followup.
Response
The licenner in preparing an evaluation of overall corrective actions. This item was suggested to be part of the Regulatory improvement Program.
I l
I am
==
s n,,-,--.. - -,
Concern:
Fire watch did not know where phone was.
t'sponse:
The fire watch was retrained.
On tour with Deputy Regional Administrator fire watch knew job duties.
4 4
h
.O
~
... -,, _. ~ _ - _ _ _ _,
W
/ /
2. ' i. / 6 3
,p DAVIS-BESSE 1
l Hanager of Operatlons : unclear.a. bout e i
proceduros 2
Multiple head vent exemptionsi il' per hour cooldown rate).
3 Fire protection fnilure to' comply j
4 --
SRO's not in controleroom i~
N-
~
75,000 to 100,00O drawings not current)'.
~
[Only2;bothsteamAFW pumps'not diverse motiva power) -
(,
/
Alternate shutdown panal had.narginal instruments.
7 No make-up capacity for HCS', no: atmospheric valve control for steam generators -
f'".lt a hv g-'
Throw over switches all over: plant 4 IP '
a 9 --
No f unctional CPDS A0
-k 1
No fpnctional Tech Support.Centar.
Il [-
Evacuation guidelinac subjd:ctive (7)
- L=--
On reactor trip, unclear who is in chargo -- control may change hands
/3 J!
Plant manager remote?
i
/V F
Poor follow-up on identifying caucer, and corrective action for LER's
/f ' Fire watch did not know where phon ~e was.
l 1
1 1
~
- >g' o
_ j.,,,
i 1
g a
l I
'3 3
1 L