ML20206H369

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/87-09 & 50-368/87-09 on 870309- 13.No Violations Noted
ML20206H369
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/13/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20206H370 List:
References
NUDOCS 8704150337
Download: ML20206H369 (2)


See also: IR 05000313/1987009

Text

F

o

.

In Reply Refer To:

AFR l 3127

Dockets:

50-313/87-09

50-368/87-09

Arkansas Power & Light Company

ATTN:

Mr. Gene Campbell

Vice President, Nuclear

Operations

P. O. Box 551

Little Rock, Arkansas

72203

Gentlemen:

This refers to the inspection conducted by D. E. Norman of this office during

i

the period March 9-13, 1987, of activities authorized by NRC Operating

I

Licenses OPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the

discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included your IEB 85-03 program

implementation and followup on open items from NRC Inspection

Report 50-313/86-32; 50-368/86-32. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspector.

The

inspection findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed l>y

J. E. GAGLIARDO

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-313/87-09

50-368/87-09

cc w/ enclosure: (see next page)

i

IV:RSB/ES

ES M

C:

C:RSBMJ

C:RPB /

ENorman:dp

REIrel nd

DRHunter

TFWestermhn JEGagliardo

i

1///87

Il /1/87

& P /87

4 /lo/87

c. / t al,81

0/

8704150337 870413

PDR

ADOCK 05000313

G

PDR

l $

-

(~

. - .

..

.

Arkansas Power & Light Company

-2-

J. M. Levine, Director

Site Nuclear Operations

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas

72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB
  • RRI

R. D. Martin, RA

i

  • R&SPB
  • Section Chief (RPB/B)
  • D. Weiss, RM/ALF
  • RIV

DRSP

  • RSB
  • MIS System
  • RSTS Operator
  • Project Inspector
  • R. Hall

D. Norman

Section Chief (RSB/ES)

  • w/766

l

l

.

-

-