T AVERA6E DAILY UNIT POWER LEVEL i
t DOCKET NO.59-423 UNIT l 3
DATE 84-07-1987 COMPLETED BY A. L. ELMS (203) 444 5388 MONTH MARCH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 0 1
1.138 16 0
m 2
1.092 17 0
3 541 18 8
4 998 19 8
5 1.134 28 8
6 1.133 21 O
7 824 22 0
0 117 23 8
9 778 24 5
19 946 25 0
11 1.119 26 8
12 1.128 27 8
13 1.869 28 8
14 9
29 8
15 8
30 0
16 0
31 8
8704150281 B70331 PDR ADOCK 05000423 R
PDR d
k
\\
m
s-i e
seeeeH MC OPERATINB STATUS REPORT CONPLETED BY REETOR DOIEUING HHHe
- 1. 90CKET.... 50-423 OPERATI M ITATUS
- 2. - REPORTIM PERIOD...MRCH 1987 OUTAGE + Olt.l K HOMS... 452.8 + 291.2 = _744
- 3. UTILITY C0NTET................. A. L. ELM 203-444-5308 steesseeseee 4.!L1CHEE9 THDML P0NER......................................... 3411 ell!LL8TONEe
- 5. NANEPLATE RATIM (IROSI ME)................................... 1,253 M e Ull!T 3 e
1 i
- 4. ESIIN ELECTRICAL RATINI (ET 11E).............................. I 153. 61 useuseweee
- 7. MIlliUM BUSIABLE CAPACITY (IROSI MNEl........................
1197 O.. MIlllull DEP9HILE CAPEITY (ET MNE1.......................... 1141.93
/
4
- 9. IF CHMIES OCCUR ABOVE I!NCE LAST REPORT, EASONS ARE...........
N/A
(
- 18. PONE LEEL TO IAllCH RESTRICTED, IF ANY (ET IIIEl...............N/A l
- 11. REASON FOR ESTRICTION, IF Ally....ll/A i/'
ilOllTH YEARTODATE CulRILATIE TO DATE suu
=====..
==
Ji
- 12. HOURS 111 REPORT!Il0 PER100 744.8 2168.8 8232.0
- 13. NUMBER OF HOUR 8 THE REACTOR NAS CRITICAL 298.1 1690.3 7103.1
- 14. REACTOR RES BVE SMTDO M HOURS O.I I.5 83.2
- 15. HOURS SEllERATOR ONLIE 291.2 1669.4
~7825.3
- 16. Ullli RE8ERVE SHUTD0 Nil HOURS I.I 8.5 II
- 17. BROSS THERMAL EER8Y KERATED (MH1 988362.5 5535234.2 23275150.4
- 18. BROSS ELECTRICAL EER6Y RERATED (MH) 383818.5 1915639.5 9048724.0
- 19. IIET ELECTRICAL EER6Y SOERATED (MHI 284355.1 1829524.0 7691286.7
- 29. Ullli NRVICE FETOR 39.1 77.3 85.3
- 21. UlliT AVAILAIILITY FETOR 39.1 77.3 15.3
- 22. Ull!T CAPKITY FETOR (USIM MDC IIET) 33.5 74.2 11.5
- 23. UNIT CAPACITY F ETOR (USIM DER ET) 33.1 73.4 11.0
- 24. Ullii FORCED DUTAGE RATE 4.6 3.8 9.9 i
- 25. Ullif FORCEO QUTAGE HOURS 13.9 51.7 767.I SHUT 80MB SCHEDULD OVER llEIT 811 Il0llTHS (TYPE,- DATE, Allo DURATION OF EEH)..............
N/A IF CURRDTLY SHUTIM, ESTIMTED STARTUP DATE...... APRIL 71987
,z
A T
UNIT SHUTDOWNS AND POWER REDUCTIONS 4,
DOCKET.NO. 50-423 s'
UNIT Millstone Unit No. 3 DATE April 7, 1987 COMPLETED BY A. Elms REPOR[ MONTH March 1987 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type (1)
(Hours)
Reason (2)
Down Reactor (3)
Report #
Code Code Prevent Recurrence 87-03 3/2/87 F
9 A
9 N/A SJ SEAL Downpower due to Motor Driven Feed pump seal failure.,
Replaced seal.
^~
B7-04 3/7/87 F
20.8 A
3 87-008-00 SJ ISV Feedwater Isolation Valve shut causing low-low D S/G level.
,+
Faulty solenoid on valve fixed.
87-05 3/14/87 s
432 B
2 N/A N/A N/A Manual reactor scram for testing.
Shut-down for surveillance requirements.
1 2
3 4
-F:
Forced
-Reason:
-Method:
Exhibit G - Instructions
.S:
Scheduled A - Equipment Failure (Explain) 1 - Manual for-Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for 3 -_ Automatic Scram Licensed Event Report C - Refueling 4 - Continued from (LER) File (NUREG-0161)
D _ Regulatory Restriction E - Operator Training & License previous month' Examination 5 - Power Reduction 5 F - Administrative
_(Duration = 0)
Exhibit 1 - Same Source 13 0perational Error (Explain) 9 - Other (Explain)
H - Other (Explain) i.
O General Offices
- Selden Street, Berlin, Connecticut HARTFORD. CONNECTICUT 06141-0270 k
L lJ
[ [, C',3 N, ~w *"
(203) 665-5000 April 9 1987 MP-10254 Re:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, G. C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 87-04 covering operations for the month of March is hereby forwarded.
Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY For: Stephen E. Scace Station Superintendent Millstone Nuclear Power Station By:
John P. Stetz Millstone Unit 1 Superintendent Millstone Nuclear Power Station SES/AE:jlm Attachment cc:
Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D.C. (10)
Director, Office of Resource Management T. Shedlosky, Sr. Resident Ir;pector M
fdi