[_,
May 3,1999 s
MEETING NOTICE 3
Organization:
BNFL Fuel Solutions Corporation (BFS) and Westinghouse Electric Company Date and Time:
' May 18,1999 9:00 am - 4:00 pm Location:
U.S. Nuclear Regulatory Commission (NRC)
One White Flint North Building, Rocm 10-B-4 11555 Rockville Pike Rockville, Maryland 20852
Purpose:
To discuss the BFS's recent acquisition of Westinghouse Electric Corporation and technicalissues related to the Wesfiex Spent Fuel Management System and the TranStor Shipping Cask. The tentative meeting agenda is attached.
Participants:
NELQ BFS/Westinahouse E. William Brach A.lan Redley Susan Shankman Mike Lalor Wayne Hodges Wayne Massie Ross Chappell Kay Moeckel Eric Leeds Bob Quinn Earl Easton Bob Lehnert Tim Kobetz Steve Sisley, et al.
Marissa Bailey, et al.
NOTE: Meetings between the NRC staff and potentiallicensees are open for interested members of the public to attend as observers pursuant to the "Open Meeting Statement of NRC Staff Policy," 59 Federal Reaister 48340, 09/20/94.
Portions of this meeting may be closed to members of the public due to the senaitive nature of information to be discussed pursuant to 10 CFR 2.790.
Contact:
Marissa Bailey (301) 415-8531 Timothy Kobetz (301) 415-8535 Attendance at this meeting by other than those listed above should be made known (by May 17, l
1999) via phone to the above contacts.
Docket Nos.: 72-1026,71-9268
$h$
p cc: Pad..icipants (fax copy)
!00h!;7
<0 Distribution: (w/ attachment)
Dockets NRc File Center PuBLIC NMSs R/F SFPo R/F PMNS (e mail)
EWBrach WHodges sshankman LKokalko EEaston ELeeds PEng Sgr, OPA NJensen, OGC CLyon. NRR PHarris. NRR RSchaaf, NRR SFLS/SFTR staff (e-mail) oFC' sFPO M E
SFPo E
sFP E3 SFPO E
JAME MBailey TKo Vrh RChe DATE 05/ O 199 05/3 /99 05/ 3 /99 05/ 3 /99 c= COVER E = COVER & ENCLOSURE N = No COPY OFFICIAL RECORD COPY G:\\WEsFLEX\\MFF71***m8""G.NoT 9905100053 990503 PDR ADOCK071g268
4
- E Spent Fuel Project Office Meeting with BNFL Fuel Solutions and Westinghouse Electric Company May 18,1999, 9
- 00 am - 4:00 pm TENTATIVE AGENDA Organization of BNFL Fuel Solutions and Westinghouse Electric Corporation Wesfiex Spent Fuel Management System e
Overview of Wesfiex System Design and Operation o
i Overview of Response to RAl-1 on Major issues o
Storage Cask Tipover Credibility Evaluation Storage and Transfer Cask Drop Loads Evaluation Canister Internal Convection h
High Burnup Fuel (All or Part May Be Proprietary) o Amendment to W74 Canister Effect of Storage RAls on Transportation Application o
o Results of Staffs Acceptance Review of Response to RAl-1 j
TranStor Shipping Cask o
Results of 30-Foot Drop Tests-Differences Between the Trojan Site-Specific TranStor Storage Cask Design and o
the General License TranStor Storage Cask Design That May Require an Amendment for Trojan to Use the TranStor Shipping Cask Detail Required to Be included in the TranStor Shipping Cask SAR Drawings o-
. Items identified by Staff During its Acceptance Review of RAl-2 for the TranStor o
Shipping Cask
'