ML20206G291

From kanterella
Jump to navigation Jump to search
Advises That Full Compliance W/Corrective Actions Re Violations Noted in Insp Repts 50-413/88-22 & 50-414/88-22 Delayed.Interpretation to Tech Spec 6.2.2.f & Station Directives Will Be Achieved Prior to 890315
ML20206G291
Person / Time
Site: Catawba  
Issue date: 11/15/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8811220216
Download: ML20206G291 (1)


Text

, _ _ _ _. _ _ _ _ _ _ _ _

ll l

Duke 1%wr Company Hu8 Tew PO Bot 33198

>kehenJat Chartone, N C 28242 Nacirar heJacnon G01.Ui3till DUKEPOWER Novestber 15, 1988 U. S. Nuclear Regulatory Cbmissico Washington, D. C.

20555 Attention: Doctanent Control Desk

Subject:

Catawba tbclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 NRC Inspection Report tbs. 50-413, -414/88-22 Revised Nplay to a tbtice of Violation Gentimen My Septaber 30, 1988 subnittal to the 100 Docunent Control Desk which transmitted Duke Power cbepany's ksponse to Violation No. 50-413,

~414/08-22-01 indicated that an existing Catawba interpretatico to Technical Specification 6.2.2.f and the Station Directives would be revised before Novestber 15, 1988. We purpose of these corrective acticns is to better define the method and intent of controlling cr.ertire as described in the Technical Specifications. Please be advised that full ccmpliance with the correctim acticns will new be achieved prior to March 15, 1989. Wis delay is the result of Duka Power's efforts to also implement similar measures at h tbclear Station and at Ooonee Nuclear Station. Inpimentation of tle corrective acticns at Catawba will prevent any furtler violaticns.

Wry truly lurs, g

11. B. Tucker JGr/1/VIO88-22 xc: Mr. M. L. Ernest k:tirxJ Regicnal Mministrator, Region II U. S. Nuclear kgulatory Qr1 mission 101 Marietta St., IM, Suite 2900 8811220216 881115 PDR ADoCK 05000413 0

FDc 0

.