ML20206F568

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/86-08 on 860407-10 & Notice of Violation
ML20206F568
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/13/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20206F573 List:
References
NUDOCS 8606240523
Download: ML20206F568 (2)


See also: IR 05000285/1986008

Text

I ,.

JUN I 31986

In Reply Refer To:

Docket: 50-285/86-08

Omaha Public Power District

ATTN: R. L. Andrews, Division Manager-

Nuclear Production

lf23 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Baer of this of fice during

the period April 7-10, 1986, of activities authorized by NRC Operating

License DPR-40 for Fort Calhoun Station, and to the discussion of our findings

with Mr. W. G. Gates, and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included selected segments of the

radiation protection program. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspector. These findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirenents. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

"Disnal Signed by;"

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures: (see next page) g

RIV:FRPS C:FRPS D:d Sf5 C:RPS/ C:RPB

REBaer/cg BMurray RL4a gart DRHunte JEGagli o

(Af/86 /86 ((3 db/86 b/g(/86 4 ////

86o624o523 06o613 &

lDR Acack osoooses $0 ,

"""

h I I

.

-

,

Omaha Public Power District -2-

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-285/86-08

cc w/ enclosures:

W. G. Gates, Manager

Fort Calhoun Station

P. O. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, DC 20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE06)

bec distrib. by RIV:

  • RPB * Resident Inspector R. D. Martin, RA
  • R&SPB *Section Chief (RPB/B) * MIS System
  • RIV File DRSP *RSTS Operator
  • RSB *R. E. Baer *B. Murray

R. L. Bangart

  • w/766

i