Text
.
,t,,.o
~
]
'0PERATING DATA REPORT
,f
(* Revised Data)
DOCKET N0. 50-336 DATE. 4/8/87 COMPLETED BY
- u. neron-TELEPHONE (203) 447-1791 Ext. 4431 E
OPERATING STATUS 1.
Unit Name: Millstone Unit 2 Notes':
Items 21 and 22 are
' 2.
Reporting Period:
February 1987.
weighted averages.
Unit.
3.
Licensed Thermal, Power.(MWt):
2700 operated at 2560 MW 4.
Nameplate Rating (Gross MWe):
!RT9 Thermal prior to its
. 5.
Design Electrical Rating (Net MWeTi 870
-uprating to the current-6.
Maximum Dependable Capacity (Gross MWe):
888.75 2700 MW Thermal power
.7.
Maximum Dependable' Capacity (Net MWe):
857.25 _
level.
~ 8.-
.If Changes Occur in Capacity. Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 672 1416 97992 12.
Number Of Hours Reactor Was Critical 305.1 988.7 70127 13.
Reactor Reserve Shutdown Hours 0
0 2205.5
- 14. ' Hours Generator.On-Line 288.4 960 66032.9
= 15.
Unit Reserve Shutdown Hours-0 0
468.2 16.
Gross Thermal Energy Generated (MWH).
249800 835800 54553279 757661 2530521 167278407 17; Gross Elec. Energy Generated (MWH).
- 18. Net Electrical Energy Generated (MWH) 237455" 801471" 52285478" 19.
Unit Service Factor 42.9-67.8 67.4
- 20. _ Unit. Availability Factor 42.9 67.8 67.9
- 21. ~ Unit Capacity Factor (Using MDC Net) 41.2 66.0 63.0
- 22.
Unit Capacity Factor (Using DER Net) 40.6 65.1 62.0
- 23.
Unit Forced Outage Rate 57.1 32.2 16.4 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COPMERCIAL OPERATION N/A N/A 8704140286 870408 DR ADOCK 05000336 PDR