ML20206F537

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Mar 1987 & Revised Monthly Operating Rept for Feb 1987
ML20206F537
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/08/1987
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206F539 List:
References
MP-10249, NUDOCS 8704140283
Download: ML20206F537 (1)


Text

9

-a N tlTILITIES cone,.i Omc... s ioen stro t. Boriin. Conn.ciicui l

[a bs$

sn cwam P.O. BOX 270

= = aanamaac

  • a*

HARTFORD. CONNECTICUT 06141-0270 J CJT.";'ll,L7%~

(2m) 665-50@

L L

April 8, 1987 MP-10249 Re:

10CFR50.71(a)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 Monthly Operating Report 87-03 in accordance with Appendix A Technical Specifications, Section 6.9.1.3.

Also attached is a revision for the February 1987 Operating Data Report.

One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

/

at Stephen E. Scace Station Superintendent Millstone Nuclear Power Station SES/GN:mw cc:

Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. (10) l Director, Office of Resource Management l

T. Rebelowski, Resident Inspector l

8704140283 870408 l

PDR ADOCK 05000336 1

R PDR

jrp, l

!