Forwards Insp Rept 50-333/87-05 on 870131-0313.No Violations Noted.Concerns Raised Over Recent Test Results in Which Safety Relief Valve Failed to Lift within Required Tolerance.Corrective Actions in LER Will Be Reviewed
ML20206F459
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/08/1987
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Radford Converse
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20206F463 List:
References
NUDOCS 8704140259
Download: ML20206F459 (2)


See also: IR 05000333/1987005

Text

r- 3

.,_ >

08 APR 1987

Docket No. 50-333

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. Radford J. Converse

Resident Manager

P.O. Box 41

Lycoming, New York 13093

Subject: Inspection 50-333/87-05

This refers to the routine inspection conducted by Mr. A. Luptak of this office

on January 31, 1987 to March 13, 1987, at the J.A. FitzPatrick Nuclear Power

Plant, Scriba, New York. Mr. Luptak discussed the inspection findings with you

and other members of your staff at the conclusion of the inspection.

Within the scope of this inspection, no violations were identified. However,

concerns were raised over recent test results in which a Safety Relief Valve

failed to lift within the required tolerance. The operation of this valve was

questioned when it apparently failed to open during an event in July 1985. We

will review your analysis and corrective actions upon submittal of the supple-

mental Licensee Event Report.

This letter requires no reply. We appreciate your cooperation.

Sincerely,

318med Bys

'

Robert M. Gallo, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-333/87-05

_

8704140259 870408

PDR ADOCK 05000333

G PDR

OFFICIAL RECORD COPY IR FITZ 87-05 - 0001.0.0

04/02/87

bO l' \

,

.

Power Authority of the 2

State of New York 08 APR 1987

cc w/ enc 1:

L.W. Sinclair, President and Chief Operatir- Officer

J.P. Bayne, First Executive Vice President - Chief Operations Officer

A. Klausmann, Vice President-Quality Assurance and Reliability

R.L. Patch, Quality Assurance Superintendent

G.H. Wilverding, Chairman, Safety Review Committee

Gerald C. Goldstein, Assistant General Counsel

R. Summers, Project Engineer, DRP 2B, NRC

NRC Licensing Project Manager

Department of Public Service, State of New York

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

Section Chief, DRP

TI Coordinator, DRP

N . MaAMY fagfo)

3. DvU /%f& 3.c)

R.  :

M ybr/rhl n ille 3 allo

4/ V/87 4/1487 4/0/87

0FFICIAL RECORD COPY IR FITZ 87-05 - 0002.0.0

04/02/87