Forwards Insp Rept 50-346/86-10 on 860224-28.Numerous Unresolved Items Identified Re Equipment Qualification Program for Electric Equipment
ML20206E896
Person / Time
Site: Davis Besse 
Issue date: 06/13/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Williams J
TOLEDO EDISON CO.
Shared Package
ML20206E901 List:
References
NUDOCS 8606240034
Download: ML20206E896 (3)


See also: IR 05000346/1986010

Text

r

'

.

%

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

o

WASHINGTON, D. C. 20555

g

p

%,

/

+.***

June 13, 1986

Docket No. 50-346/86-010

Toledo Edison Company

ATTN: Mr. Joe Williams, Jr.

Senior Vice President-Nuclear

Edison Plaza

300 Madison Avenue

Toledo, Ohio 43652

Gentlemen:

'

SUBJECT:

INSPECTION N0. 50-346/86-010

Enclosed is the report of the team inspection conducted by Mr. R. C. Wilson

and other NRC representatives on February 24 to 28,1986, at the Davis-Besse

Nuclear Power Station, Unit No.1 of activities authorized by NRC License No.

NPF-3. The inspection could not be completed at that time because of the

ongoing revisions to your equipment qualification (EQ) program and several

unresolved qualification issues.

The team's interim findings were discussed

with you and members of your staff in a February 28 status meeting. The inspec-

tion reviewed your implementation of a program as required by 10 CFR 50.49 for

establishing and maintaining the qualification of electric equipment within the

scope of 10 CFR 50.49. Within these areas, the inspection consisted of examin-

ations of selected procedures and records, interviews with personnel, and obser-

vations by the inspectors.

The inspection determined that during the present plant outage you are

performing an extensive reworking of your EQ program. We identified numerous

concerns that are considered to be unresolved items. These concerns will be

reexamined in a continuation of this inspection that is tentatively scheduled

for the week of August 4, 1986.

The plant phy::51 inspection identified several significant concerns

involving the status, condition, and maintenance of equipment requiring

qualification; your attention is directed to the listing of these findings in

section 4.E of the inspection report.

Conversely, although most of the

qualification documentation packages were incomplete, they were well organized

and appeared to reflect acceptably high standards of preparation.

Your corrective actions regarding the identified concerns and the completion

of your other planned efforts should not be delayed pending continuation of

this inspection or other further NRC action.

8606240034 e60613

PDR

ADOCK 05000346

G

PDR

'

.

.

S.

Toledo Edison Company

-2-

June 13, 1986

We are available to discuss any questions you have concerning this inspection.

Sincerely,

)

'

.

ns. Gary G. Zech, Chi

Vendor Program Branch

Division of Quality Assurance, Vendor

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure:

Inspection Report No. 50-346/86-010

..

.

Toledo Edison Company

-3-

June 13, 1986

DISTRIBUTION:

DCS

e

PDR

VPB Reading

DQAVT Reading

JTaylor

RVollmer

BGrimes

PMiller

UPctapovs

AJohnson

GHubbard

~

SAlexander

RWilson

ADeagazio,DL/NKR

MYost, Idaho National Engineering Laboratory

DJackson, Idaho National Engineering Laboratory

MJacobus, Sandia National Laboratories

JChavez, Sandia National Laboratories

AGautam, RIII

RSmeenge, RIII

RWestberg, RIII

JMuffett, RIII

/

VPB:0QAVT

SC/VPB:DQAVT

RIII

VfB:00AVT

0D:0

T D:

RWilson:ea*

UPotapovs*

JMuffett

WeGGZech

HM

er

B

mes

6/5/86

6/5/86

6/

/86

6/12./86

6

/86 6 [2/ 86