r
'
.
%
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
WASHINGTON, D. C. 20555
g
p
%,
/
+.***
June 13, 1986
Docket No. 50-346/86-010
Toledo Edison Company
ATTN: Mr. Joe Williams, Jr.
Senior Vice President-Nuclear
Edison Plaza
300 Madison Avenue
Toledo, Ohio 43652
Gentlemen:
'
SUBJECT:
INSPECTION N0. 50-346/86-010
Enclosed is the report of the team inspection conducted by Mr. R. C. Wilson
and other NRC representatives on February 24 to 28,1986, at the Davis-Besse
Nuclear Power Station, Unit No.1 of activities authorized by NRC License No.
NPF-3. The inspection could not be completed at that time because of the
ongoing revisions to your equipment qualification (EQ) program and several
unresolved qualification issues.
The team's interim findings were discussed
with you and members of your staff in a February 28 status meeting. The inspec-
tion reviewed your implementation of a program as required by 10 CFR 50.49 for
establishing and maintaining the qualification of electric equipment within the
scope of 10 CFR 50.49. Within these areas, the inspection consisted of examin-
ations of selected procedures and records, interviews with personnel, and obser-
vations by the inspectors.
The inspection determined that during the present plant outage you are
performing an extensive reworking of your EQ program. We identified numerous
concerns that are considered to be unresolved items. These concerns will be
reexamined in a continuation of this inspection that is tentatively scheduled
for the week of August 4, 1986.
The plant phy::51 inspection identified several significant concerns
involving the status, condition, and maintenance of equipment requiring
qualification; your attention is directed to the listing of these findings in
section 4.E of the inspection report.
Conversely, although most of the
qualification documentation packages were incomplete, they were well organized
and appeared to reflect acceptably high standards of preparation.
Your corrective actions regarding the identified concerns and the completion
of your other planned efforts should not be delayed pending continuation of
this inspection or other further NRC action.
8606240034 e60613
ADOCK 05000346
G
'
.
.
S.
Toledo Edison Company
-2-
June 13, 1986
We are available to discuss any questions you have concerning this inspection.
Sincerely,
)
'
.
ns. Gary G. Zech, Chi
Vendor Program Branch
Division of Quality Assurance, Vendor
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosure:
Inspection Report No. 50-346/86-010
..
.
Toledo Edison Company
-3-
June 13, 1986
DISTRIBUTION:
e
VPB Reading
DQAVT Reading
JTaylor
RVollmer
BGrimes
PMiller
UPctapovs
AJohnson
GHubbard
~
SAlexander
RWilson
ADeagazio,DL/NKR
MYost, Idaho National Engineering Laboratory
DJackson, Idaho National Engineering Laboratory
MJacobus, Sandia National Laboratories
JChavez, Sandia National Laboratories
AGautam, RIII
RSmeenge, RIII
RWestberg, RIII
JMuffett, RIII
/
VPB:0QAVT
SC/VPB:DQAVT
RIII
VfB:00AVT
0D:0
T D:
RWilson:ea*
UPotapovs*
JMuffett
WeGGZech
HM
er
B
mes
6/5/86
6/5/86
6/
/86
6/12./86
6
/86 6 [2/ 86