ML20206E764

From kanterella
Jump to navigation Jump to search
Advises That Permission to Restart Reactor Will Be Granted on or Soon After 881116,per 881025 Request
ML20206E764
Person / Time
Site: U.S. Geological Survey
Issue date: 11/10/1988
From: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millard H
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
Shared Package
ML20206E768 List:
References
NUDOCS 8811180188
Download: ML20206E764 (1)


Text

.

r NOV I O 1988 In Reply Refer To:

Occket:

50-274 U.S. Department of Interior Geological Survey ATTN:

Dr. Hugh T. Millard, Jr.

Reactor Administrator P.O. Box 25046 - Mail Stop 424 Denver Federal Center Denver, Colorado 80225 Gentlemen:

This refers to your October 25, 1988, letter requesting permission to restart the geological survey TRIGA reactor. As you know, we plan to be at your facility on November 10, 1988, to review your pre-startup program following the replacement of the reactor vessel liner. Based on our inspection findings, a decision will be made concerning restart of the reactor.

If no significant problems are identified, we anticipate that permission to operate the reactor could be granted on or soon after November 16, 1988.

If you have any questions, please contact us.

Sincerely, Original eigned byr, Robert D. Martin Robert D. Martin Regional Administrator bec to CMB (IE01) bec:

R. Martin D. Chaney C:RP38-DRSS A. Adt.ms, NRR Project Manager DRP Lisa Shea, RM/ALF RIV File MIS Coordinator RSTS Operator DRS

.t. L. Bangart, DRSS C:FRPS R. Hall-ORSS RPB-DRSS RIV:FRPS:

FRPS: RP C.RPB

?/

RA DChaney/ sir RBaer BMurras t

& Srt RMartin

/Q/88 If/p/88 (l

/(t /88 ll47/88

$/l0/88

/

8011100183 881110 F'Det ADOCK 05000274 P

PDC

.-