Monthly Operating Repts for North Anna Power Station Units 1 & 2 for Oct 1988
ML20206E253
Person / Time
Site: North Anna  
Issue date: 10/31/1988
From: Cartwright W, Garner B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8811180020
Download: ML20206E253 (13)


Text

,

+ * -

_VIRCIN,1A POWER COMPANY NORTH 4)Ot\\ POWER STATION MONTHLY OPERATINC REPORT imHTW OCTOBER YEAR 1988 APPROVED:

'STNfl6N MANAGER 8811180020 881031 POR ADOCK 05000338 552Y R

PNU

s OPERATING DATA REPORT DOCKET NO.

50-338

~~

DATE 1l-01-88 COMPLETED BY Brenda Carner TELEPHONE ~TTd3) 894-5151 X2527 OPERATING STATUS 1.

Unit Name:

North Anna 1 2.

Reporting Period October 1988 3.

Licensed Thermal Power (MWt):

2893 6.

Nameplate Rating (Cross MWe):

947 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross MWe):

963

?.

Maximum Dependable Capacity (Net MWe):

915 8.

If Changes occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Civo Reasons:

N/A 9.

Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 745 7,320 90.828 12.

Number of Hours Reactor Was Critical 745 6,555.5 64,755.4 13.

Reactor Reserve Shutdown Hours 0

182.6 6,457.1 14.

Hours Generator On-Line 745 6,298.3 62,050.6 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Cross Thernal Energy Generated (MVH) 2.114.218 17,861,745 164,034,400 17.

Cross Electrical Energy Generated (MWH) 698,840 5,901,648 53,805,540 j

18 Net Electrical Energy Generated (KL'H) 662,580 5.597,079 50.891,673 l

19.

Unit Service Factor 100 85.7 68.3 20.

Unit Availability Factor 100 85.7 68.3 l

21.

Unit Capacity Factor (Using MDC Net) 97.2 83.6 62.9' l

22.

Unit Capacity Taetor (Using DER Net) 98.1 83.9 61.8 23.

Unit Forced Outage Rate 0

5.9 14.9 26.

Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):

l l

NA 25.

If chut Dovn At End Of Report Period, Estimated Date of Startup:

NA 26.

Units In Test Status (Prior to Coenercial Operation):

Forecast Achieved INITIAL CRITICALITY l

INITIAL ELECTRICITY COMMERCIAL OPERATION

f AVERACE DAILY UNIT POWER LEVEL 5

DOCKET NO.

50-338 UNIT NA-1 l

1 DATE 11-01-88 l

COMPLETED BY Brenda Carner TEl.EPHONE 703-894-5151X2527 i

l MONTH,,

OCTOBER 1988 I

DAY AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (FWe-Net)

(MWe-Net)

P 1

908 17 910 i

2 908 18 911 l

3 908 19 912 l

4 908 20 911

(

5 908 21 902 6

909 22 686 1

7 894..

23 665 8

909 24 759 _

l 9

910 25

_911 10 909 26 912 i

11 910 27 910 12 910 28 912 13 910 29 912 14 910 30 912

[

15 909 31 912 l

16 910 i

i I

INSTRL'CTIONS On this format. liat the average daily unit power level in MWe-Fet for each day in the reporting nonth. Compute to the nearest whole megawatt.

i I

h s

Page 1

of 1

i

~

UNIT SNUTDOWN AND POWER REDUCTIONS s

EXPIANATION SNEET DOCKET No.

50-338 REPORT MONTW OCTOBEP.

UNIT NAME NA-1 YEAR 1988 DATE 11-01-84

[

COMPLETED BY Bret.da Carner f

L t

No Entry This Month I

t t

1, i

1 n

i 1

1

)

t i

1 i

b t

?

l i

[

t I

i f

l t

4

I! NIT SNUTBOWNS AIS POWER RENOCTIONS DOCKET NO.

50-338 UNIT NAINE North Amma a DATE 11-01-88 REPORT NONTE OCTURER 1988 00prLETED BY Brenda Career TELEFNONE (703) 894-5151 X2527 s;

No.

Date Type Duration Reason Method of

'icensee System f"-

-- =t Cause med Corrective (Nours)

Shetting ht 3

4 5

Dome Beactor Report #

Prevent Recurrence No Entry This Month l

1 i

l l

l 1

2 3

4 I

F: Forced Reason:

Method:

Exhibit F - Instruct 1rns S: Scheduled A-Equipment Failure (ExpImin) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Eheets for Licensee C-Refueling 3-Automatic stran Event Report (LER) File D-Regulatory Rr4trietton 4-Continuations

(!.TLEC-0161)

E-Operator Training / License Examination 5-Load Reduction F-Administrative 9-Other C-Opera.ional Error (Explain) 5 H-Other (Explain)

Exhibit H - Same Source 1

NORTH ANNA POWER STATION l

UNIT NO.

1

[

MONTH OCTOBER SUte(ARY OF OPERATING EXPERIENCE 1

Listed below in chronological sequence is a summary of operating experiences for this month which required loati reductions or resulted in significant non-load related incidents.

DATE TIME DATA October 1, 1988 0000 Began the month with Unit at 958 MW - 100%

power.

t October 7, 1988 0943 Commenced rampdevn of 100 MW to perfore Turbine Valve Freedom Test 1

1044 Unit holding at 860 MV - 891 power, to perform Turbine Valve Freedon Test.

1231 Co=menced ramp up to 981 povar. Turbine Valve Freedon Test completed.

1420 Unit holding at 947 MW - 98% power, to l

perforn 1-PT-24 calorimetric.

1 1455 Coenenced ramp up to 100% power, 1-PT-24 l

calorinetric completed.

l l

1550 Unit stabilized at 957 MW - 100 power.

l l

October 21, 1988 2125 Commenced rampdevn of 100 MV to do maintenance on feedvater heaters.

l I

l October 22, 1988 0202 Commencing raardcun of adaitional 150 MW to renove"1B" and "4B" feedvater heater from I

service to repair tube leakage.

0249 Unit holding at 713 MV - 78% power, to do maintenance on feedvater heaters.

~

r October 24, 1988 1311 Commenced raep up to 95% power, maintenance completed on the feedvater heaters, i

1520 Unit holding at 935 MV "51 pcVer, for calerinetric.

i i

NORTH ANNA POWER STATION UNIT NO.

I MOWTH OCTOBER SUle(ARY OF OPERATING EXPERIENCE October 24. ;988 (Cont.)

1538 commenced ramp up to 100% power.

calorimetric ecepleted.

1610 Unit stabilized at 960 IN - 100% power.

October 31. 1988 2400 Ended the month with Unit at 963 W - 100%

power.

1

i OPERATING DATA REPORT I

DOCKET NO.

50-339 DATE l'-01-88 COMPLETED BY Brenda Garner TELEPHONE (703) 894-5151 X2527 OPERATING STATUS i

1.

Unit Name:

North Anna 2 2.

Reportirg Period Octobar 1988 3.

Licensed Thereal Power (MWt):

2893 4.

Nameplate Rating (Cross MVe):

947 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross MWe):

_ 915 963 l

7.

Maximun Dependable Capacity (Net MWe):

8.

If Chang,es Occur in Capsairy Ratings (Items No. 3 thru 7) Since Last Report, l

Give Reasons:

N/A 9.

Power Level To Vhich Restricted, If Any (Net MVe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 745 7,320 69,096 12.

Number of Hours Reactor Vas Critical 7 4 5"~

7,270.'9" 55,739.2

~~'

13.

Reactor Reserve Shutdevn Hours 0

49.1 5,702.1

[

~~

14.

Hours Generator On-Line 745 7,244.2

$4,900.2 l

15.

Unit Reserve Shutdown Hours 0

0 0_

16.

Cross 1hermal Energy Generated (ML'H) 2,154.260 20,690,352 145.209.133

~

17.

Cross Electrical Energy Generated (MWF) 714,826 6,927,672 47,417,967 10.

Net Electrical Energy Generated (MWH) 678,449 6,578,937 45,637,284_

l 19.

Unit Service Factor 100 99 79.5 20.

L' nit Availability Tac ;or 100 99 79.5 i

~

71.8

[

l

21. Unit Capacity Tactor (Using MDC Net) 99.5 98.2 72.8 j

22.

L' nit Capacity Factor (l' sing DER Net) 100.4 99.1 23.

Unit Forced Outsge Rate 0

0 8T f

24.

Shutdevns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

I Refueling Outare 02-03-89 l

l 25.

If Shut Down At End Of Report Period Estimated Date of Startup:

N/A

{

26.

Unito In Test Status (Prior to Consercial Operation):

Forecast Achieved I

INITIAL CRITICALITY INITIAL ELECTRICITY

,((

COMMERCIAL OFERATION 1

I 1

I 1

AVERAGE DAILY UNIT I W IJVEL l

l 00CKET NO. _30-339 UNIT NA-2 DATE 11-01-89 3

I s

COMPLETED BY Brenda Carner I

TELETHONE 703-894-5151X2527 l

t MONTH OCTOBER 1988 I

l DAY AVERACE DAILY POWER LEVEL DAY AVERACE D/tLY POWER LEVEL l

(MWe-Net)

,MWe-Net)

[

l 909 17 912 2

909 18 911 L

i 3

909 19 912 t

I 4

909 20 911 5

910 21 895 6

911 22 912 7

911 23 912 l

8 912 24 912 i

9 912 25 411 I

10 912 26 914 11 912 27

$12 12 412 28 911 13 913 29 911 I

L 14 912 30 911

(

t 15 912 31 911 i

16 912 INSTRl'CTIONS j

On this format. list the average daily unit power level in MVe-Net for i

each day in the reporting month. Cenpute to the nearest whole negavatt.

l

Page 1

of _ L UNIT SHUTDOWN AND POWER REDUCTIONS EXPIANATION SHEET DOCKET No.

50-339 REPORT MONTH OCTOBER UNIT NAME NA-2 i

YEAR, 1988 DATE 11-01-88 COMPLETED BY Brenda Garner No Entry r.1. ::sr.tli

{

r I

1

l l

- ~[s

. ~.

UNIT SHUTDOWNS AND /0WER REDUC 1 IONS DOCKET No.

50-339 UNIT NAME North Anna 2 DATE 11-01-88 stEPORT MONTH OCTOBER 1988 COMPLETED BY Brenda Carner TELEPHONE (703) 894-5151 X2527 1

2 Ao.

Date Type Duration Reason Method of Licensee System Component C use and Corrective (Hours)

Shutting henc Me Me 3

4 5

Down Reactor Report i Prevent Recurrence NO ENTRY THIS MONTH l

l 3

l I

l l

1 2

3 4

F. forced Reason:

ttethod:

Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scran.

Entry Sheets for Licensee C-Refueling 3-Autonatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (N'JREG-Ol 60 E-Operator Training / License Examination 5-Load Reduction F-Administrative 9-Other l

G-Operational Error (Explain) 5 H-Other (Explain)

Exhibit H - Same Source

.s, NORTH ANNA POWER STATION UNIT NO.

2 MONTu OCTOBER

SUMMARY

OF OPERATING EXPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

DATE g

DATA October 1, 1988 0000 Began the month with Unit at 956 MW -

100% power.

October 21, 1988 1000 Commenced rampdown of 100 MW to perform Turbine Valve Freedom Test.

1050 Unit holding at 865 MW - 89% power, to perform Turbine Valve Freedom Test.

1146 Unit holding at 865 MW - 89% power, to secure 2-SD-P-1C for oil change. Turbine Valve Freedom Test completed.

1200 Commenced ramp up to 95% power until 2-SD-P-lC returned to service.

1300 Unit holding at 925 MW - 95% power, to perform maintenance on 2-SD-P-1C.

1500 Commenced ramp up to 98% power 2-SD-P-1C returned to service.

1538 Unit holding at 936 MW - 98% power, to perform 2-PT-24.1 calorimetric.

1615 Commenced ramp up to 500% power, 2-PT-24.1 calorimetric completed.

1645 Unit stabilized at 955 MW - 100% power.

October 31, 1988 2400 Ended the month with Unit at 962 MW - 100%

power.

VIRGINEA Er scraIC AND Powan COMPANY RICHMOND, VIRO!MIA 2 0 2 61 November 14, 1988 U.S. Nuclear Regulatory Corsission Serial No.88-739 Attention: Document Control Desk N0/JMJ Washington, D.C.

20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of October 1988.

Very truly y urs W. R. Cartwright Vice President - Nuclear i