NRC MONTHLY OPERATING REPORT DOCKET NO.

50-529 UNIT NAME PyNGS-2 DATE 04LOQfg5 COMPLETED BY J M Barbdgil t t TELEPHONE 602-932-5300 Exit 6523 ODEBBIING SIBIUS 1.

Unit Name: Palo Mende Nuglear Generating Stetiget Unit 2 2.

Reporting Period:Margh 1936 3.

Licensed Thermal Power (MWt): 3@00 4.

Nameplate Rating (Gross MWe): 1403 5.

Design Electrical Rating (Net MWe): 1270 6.

Maximum Dependable Capacity (Gross MWe):Tg bg dgigrgiogd 7.

Maximum Dependable Capacity (Net MWe):

Tg be dgtgrmlagd 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: _ _ _ _ _ _

9.

Power Level To Which Restricted, If Any (Net MWe):190 MWt JO MWg)

10. Reasons For Restrictions, If Any:

j

______L9w P wsC 099Ce11D9 Lisenss______________-__---_-_---

I 9

_ = = - - _ _ - _ _ _ _ _ _ _ _ _ - - -

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period

___744____

___2160___

__3648____

12. Number Of Hours Reactor Was Critical

_____0____

_____0____

____0_____

13. Reactor Reserve Shutdown Hours

_____0____

_____0____

____0_____

14. Hours Generator On-Line

_____0____

_____0____

____0_____

15. Unit Reserve Shutdown Hours

_____0____

_____0____

____0_____

16. Gross Thermal Energy Generated

_____0____

_0____

____0_____

(MWH)

17. Gross Electrical Energy Generated

_____0____

_____0____

____0____

(MWH)

18. Net Electrical Energy Generated

_____0____

_____0____

____0____

(MWH)

19. Unit Service Factor

___N/A____

___N/A____

__N/A____

20. Unit Availability Factor

___N/A____

___N/A____

__N/A____

21. Unit Capacity Factor (Using MDC

___N/A____

___N/A____

__N/A____

Net)

22. Unit Capacity Factor (Using DER

___N/A____

___N/A____

__N/A____

Net)

23. Unit Forced Gutage Rate

___N/A____

___N/A____

__N/A____

24. Shutdowns Scheduled Over Next 6 Montns (Type, Date, and Duration of Each): __No signifigant outage glgnged until after_____

_____________________WeCCenty run__________________________________

25.

If Shutdown At End Of Reoort period, Estimated Date of Startuo:

____Nf@_________

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY

___3/86_____

INITIAL ELECTRICITY

___6/86_____

COMMERCIAL OPERATION

__11/86_____

8606230059 B60331 g7 PDR ADOCK 05 59 gh R

o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

_5 0_..5_ _2 9 _ _ _ _ _ _ _

UNIT

_ P _V _N _G _S - 2 _ _ _ - _ _

DATE 0_ 4. _/ _0 8 _/ 8 _6 _ _ _ _ _.- -

COMPLETED BY_J__. _M_.

_B.a._r _k _d o_l._l 4

TELEPHONE _@0g-93g-5300

.E _x _t _. 6.5_ _9.3. _- _-_

M_ON_T_H_:

March 1986 DAY AVERASE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i

(MWe-Net)

(MWe-Net) 1

_0_

17

__-_-____0___-_---__-__

2

________0_______-.

18

--0----_

- - - - - - - _ - _ = -

3 0

19 0

20 ___________0_______.-

4

____________0 5

_____0_

_ _ = _ - - _ - _ _

21

__0____

6

___________0

__=

22 ____ ______0_____________

7

__0 23 _________- 0 __ __________

1 8 24 _.

0__=

l 9

___--______0______________

25 ______ ____0 1

10 --

_--_0________

2 6 _. -- - - -

0 h

11

_-______0 27

____0__________--

1 l

12 ____

__ 0 ____

28 ---__ _____.0 13 ____ ______0 2 9

-- - _ _ _- _ _0_

l

)

14 -____ _ ___0______._

30 ______. __ _0________

+

l 15 _____ __ __0_______-____.__

31 _ _ _______0_________

16 _____ ___

_0- - - -

-- =___ ___

.._I

s t

REFUELING INFORMATION DOCKET NO._QO-522__________

UNIT __

_ PMNGS-g_____

DATE_______0440@L8@_____

COMPLETED BY_J.M_t garkdoll-TELEPHONE __603-233-@300____

__Ent s @523_______

1.

Scheduled date for next refueling shutdown.

01/02/88 2.

Scheduled date for restart following refueling.

02/20/88 3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not Yet Determined What will these be?

Not Yet Determined i

4.

Scheduled date for submitting proposed licensing action and supporting information.

1 Not Yet Determined 5.

Important Licensing consicerations associated with refueling, D*

e. g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not Yet Determined i

6.

The number of fuel assemblies.

a) In the core._g41___________

b) In the scent fuel storage pool.__

_0_______

7.

Licensed spent fuel storage capacity.____13@2_

_=

Intended change in spent fuel storage capacity __Noge______

8.

projected date of last refueling that can be discharged to soent fuel storage pool assuming present capacity.

2003 (w/ annual reloads and full core discharge capability).

i

guMMegy gE gpEBOIIhg E3EEBIENCE EOS 185 MgNIH DOCKET NO.___s0 _529___________

UNIT _________PVdgS g__________

DATE_________04LOH/B6_________

COMPLETED BY_J M gathdoll____

s u TELEPHONE __60@r932:5300_______

__E t3t 6523__________

03/01 0700 Plant in Mode 5.

C3/10 1100 Entered Mode 4.

C3/25 2249 Entered Mode 3.

1 l

' E' 'lJNIT SHUTDOWNS AND POWER RCDUCTIONS.. *. DOCMCT NO.

90 979

{

UNIT HAMC PVMf S ?

s '

DATC

=

I CCHPLCTED BY

"~ "Wl0 0

'S t

TELEPHONC ' 4 U-WO p.r e (A n 3 Hethod or Shutting Down System Component Cause & Corrective 1

1 Duration 2

3 l.CR 4

5 Action to No.

Date Type

( alou rs )

Reason Roactor No.

Codo Code Prevent ficcurrence t

,t Not applicable - Reactor has not roached criticality i

6 s

a s

k 1

2 3

k F-rorced Rensnn:

Hethod:

Exhibit r - Instructions

$=5choduled A-Equipment failuro (Explain) 1-f ta nua l for Prnparation or Datn D-ffaintenance or Test 2-Hanual Scram.

Ent ry Sheets f or I.icensoo C-fte rtse l ing 3-Automa tic scram.

Event Report (LCR) file D-negislatory !! cst riction as-Cnnt inisa t ion f rom-(NURCC 0161)

E-Opera tor Tra ining & Licensa Examina tion Prnvious Month T-Administrativo 5-nerf uc t inn e r Pnf 8L 1

. "r s.

Arizona Nuclear Power Project P.o. BOX 52034 e PHOENIX. ARIZONA 85072-2034 April 15, 1986 ANPP-36149-EEVB/PGN/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 (License NPF-46)

March Monthly Operating Report File: 86-024-404

Dear Mr. Scroggins:

Attached please find the March, 1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station. Unit 2 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me.

Very truly yours P

.h V Ch q CA.L E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/PGN/rw Attachments cc:

J. B. Martin (all w/a)

R. P. Zimmerman E. A. Licitra A. C. Gehr INP0 Records Center