Monthly Operating Rept for Mar 1986
ML20206E038
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/31/1986
From: Barkdoll J, Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-36149-EEVB, NUDOCS 8606230059
Download: ML20206E038 (6)


Text

=  ;

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 UNIT NAME PyNGS-2 DATE 04LOQfg5 COMPLETED BY J t Mt Barbdgil TELEPHONE 602-932-5300 Exit 6523 ODEBBIING SIBIUS

1. Unit Name: Palo Mende Nuglear Generating Stetiget Unit 2
2. Reporting Period:Margh 1936
3. Licensed Thermal Power (MWt): 3@00
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270
6. Maximum Dependable Capacity (Gross MWe):Tg bg dgigrgiogd
7. Maximum Dependable Capacity (Net MWe): Tg be dgtgrmlagd
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: _ _ _ _ _ _ _ _____
9. Power Level To Which Restricted, If Any (Net MWe):190 MWt JO MWg)
10. Reasons For Restrictions, If Any: __________________ j

______L9w P9wsC 099Ce11D9 Lisenss______________-__---_-_--- I

__--_-__--_--- _ = = - - _ _ - _ _ _ _ _ _ _ _ _ - - - _______-- - __

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period ___744____ ___2160___ __3648____
12. Number Of Hours Reactor Was Critical _____0____ _____0____ ____0_____
13. Reactor Reserve Shutdown Hours _____0____ _____0____ ____0_____
14. Hours Generator On-Line _____0____ _____0____ ____0_____
15. Unit Reserve Shutdown Hours _____0____ _____0____ ____0_____
16. Gross Thermal Energy Generated _____0____ _ _0____ ____0_____

(MWH)

17. Gross Electrical Energy Generated _____0____ _____0____ ____0____

(MWH)

18. Net Electrical Energy Generated _____0____ _____0____ ____0____

(MWH)

19. Unit Service Factor ___N/A____ ___N/A____ __N/A____
20. Unit Availability Factor ___N/A____ ___N/A____ __N/A____
21. Unit Capacity Factor (Using MDC ___N/A____ ___N/A____ __N/A____

Net)

22. Unit Capacity Factor (Using DER ___N/A____ ___N/A____ __N/A____

Net)

23. Unit Forced Gutage Rate ___N/A____ ___N/A____ __N/A____
24. Shutdowns Scheduled Over Next 6 Montns (Type, Date, and Duration of Each): __No signifigant outage glgnged until after_____

_____________________WeCCenty run__________________________________

25. If Shutdown At End Of Reoort period, Estimated Date of Startuo: ______

____Nf@_________

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY ___3/86_____ _____________

INITIAL ELECTRICITY ___6/86_____ _____________

COMMERCIAL OPERATION __11/86_____ _____________

8606230059 B6033159 ADOCK 05 g7 PDR R gh

o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _5 0_ ..5_ _2 _ 9_______

UNIT _P

_ _V _N _G _- _S - 2 _ _ _ - _ _

DATE 0_ 4. _/ _0

_ - 8 _/ 8 _6 _ _ _ _ _ .- -

COMPLETED BY_J__. _M_. _B.a._r _k _d o_l._l 4

TELEPHONE _@0g-93g-5300

.E _x _t _. 6.5_ _9.3. _- _-_

M_ON_T_H_:

March 1986 DAY AVERASE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i (MWe-Net) (MWe-Net) 1 -- __ _0_ -___ _ _ _ _

17 __-_-____0___-_---__-__

2 ________0_______-. ___

18 -- - --0----_ - - - - - - - _ - _ = -

3 0 19 0 -_

4 ____________0 . _ _-_ __

20 ___________0_______.- ___

5 _____0_ _ _ _ = _ - - _ - _ _

21 _ _ _ _ - - - - - __0____ _______ _

6 ___________0 - __= _ _ _ _ . 22 ____ ______0_____________

7 -

__0 __________ __ 23 _________- 0 __ __________ 1 8 ________ 24 _. __ 0__= ___--

l 9 ___--______0______________ 25 ______ ____0 __ --__

1 10 -- _ _ _ - _--_0________ 2 6 _. -- - - - _

0 ____ -__ __

h 11 _-______0 ____-- _ __

27 _-__ ____0__________-- _ 1 l

12 ____ __ 0 ____ _____- 28 ---__ _____.0 _____--______

13 ____ ______0 _ _ _____ ___

29 -- - _ _ _- _ _0_ __-___ _

l

)

-; 14 -____ _ ___0______._ _____ 30 ______. __ _0________ _____

+

l 15 _____ __ __0_______-____.__ 31 _ _ _______0_________ ____

16 _____ ___ _0- - - - -- =___ ___

1 l

_ .. . _ . - ._. __,- . ,. _ _ . _ , _ , , _ .._I

s t

REFUELING INFORMATION DOCKET NO._QO-522__________

UNIT __ _ PMNGS-g_____

DATE_______0440@L8@_____

COMPLETED BY_J.M_t garkdoll-TELEPHONE __603-233-@300____

__Ent s @523_______

1. Scheduled date for next refueling shutdown.

01/02/88

2. Scheduled date for restart following refueling.

02/20/88

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not Yet Determined What will these be?

Not Yet Determined i 4. Scheduled date for submitting proposed licensing action and 1

supporting information.

Not Yet Determined

5. Important Licensing consicerations associated with refueling, D*
e. g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Not Yet Determined i
6. The number of fuel assemblies.

a) In the core._g41___________

b) In the scent fuel storage pool.__ _0_______

7. Licensed spent fuel storage capacity.____13@2_ _=

Intended change in spent fuel storage capacity __Noge______

8. projected date of last refueling that can be discharged to soent fuel storage pool assuming present capacity.

2003 (w/ annual reloads and full core discharge capability).

i

guMMegy gE gpEBOIIhg E3EEBIENCE EOS 185 MgNIH DOCKET NO.___s0 _529___________

UNIT _________PVdgS g__________

DATE_________04LOH/B6_________

COMPLETED BY_JsMu gathdoll____

TELEPHONE __60@r932:5300_______

__E t3t 6523__________

03/01 0700 Plant in Mode 5.

C3/10 1100 Entered Mode 4.

C3/25 2249 Entered Mode 3.

1 l

l l

90 979

' E' 'lJNIT SHUTDOWNS AND POWER RCDUCTIONS .. *. DOCMCT NO.

s ' UNIT HAMC PVMf S ? .

{,

DATC - - -

- = ,

. I CCHPLCTED BY "~ "Wl0 0 'S t

TELEPHONC ' 4 U-WO p.r e

, (A n 3 Hethod or

  • Shutting ,

Down System Component Cause & Corrective Duration 2 l.CR 4 5 Action to 1 1 3 No. Date Type ( alou rs ) Reason Roactor No. Codo Code Prevent ficcurrence .

t

,t

Not applicable - Reactor has not roached criticality ,. . ,

i . -

6 s

a s .

k 1 2 3 k F-rorced Rensnn: Hethod: Exhibit r - Instructions

$=5choduled A-Equipment failuro (Explain) 1-f ta nua l for Prnparation or Datn D-ffaintenance or Test -

2-Hanual Scram. Ent ry Sheets f or I.icensoo -

C-fte rtse l ing 3-Automa tic scram. Event Report (LCR) file .

D-negislatory !! cst riction as-Cnnt inisa t ion f rom- (NURCC 0161)

E-Opera tor Tra ining & Licensa Examina tion Prnvious Month T-Administrativo 5-nerf uc t inn e r Pnf 8L 1

. "r s.

Arizona Nuclear Power Project P.o. BOX 52034 e PHOENIX. ARIZONA 85072-2034 April 15, 1986 ANPP-36149-EEVB/PGN/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 (License NPF-46)

March Monthly Operating Report File: 86-024-404

Dear Mr. Scroggins:

Attached please find the March, 1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station. Unit 2 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me.

Very truly yours P

.h V Ch q CA.L E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/PGN/rw Attachments cc: J. B. Martin (all w/a)

R. P. Zimmerman E. A. Licitra A. C. Gehr INP0 Records Center

~N 0

5 >p

__ _- _.. __ _ -- _,