NRC MONTHLY OPERATING REPORT DOCKET NO.
50-529 UNIT NAME PyNGS-2 DATE 04LOQfg5 COMPLETED BY J M Barbdgil t t TELEPHONE 602-932-5300 Exit 6523 ODEBBIING SIBIUS 1.
Unit Name: Palo Mende Nuglear Generating Stetiget Unit 2 2.
Reporting Period:Margh 1936 3.
Licensed Thermal Power (MWt): 3@00 4.
Nameplate Rating (Gross MWe): 1403 5.
Design Electrical Rating (Net MWe): 1270 6.
Maximum Dependable Capacity (Gross MWe):Tg bg dgigrgiogd 7.
Maximum Dependable Capacity (Net MWe):
Tg be dgtgrmlagd 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: _ _ _ _ _ _
9.
Power Level To Which Restricted, If Any (Net MWe):190 MWt JO MWg)
- 10. Reasons For Restrictions, If Any:
j
______L9w P wsC 099Ce11D9 Lisenss______________-__---_-_---
I 9
_ = = - - _ _ - _ _ _ _ _ _ _ _ _ - - -
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
___744____
___2160___
__3648____
- 12. Number Of Hours Reactor Was Critical
_____0____
_____0____
____0_____
- 13. Reactor Reserve Shutdown Hours
_____0____
_____0____
____0_____
- 14. Hours Generator On-Line
_____0____
_____0____
____0_____
- 15. Unit Reserve Shutdown Hours
_____0____
_____0____
____0_____
- 16. Gross Thermal Energy Generated
_____0____
_0____
____0_____
(MWH)
- 17. Gross Electrical Energy Generated
_____0____
_____0____
____0____
(MWH)
- 18. Net Electrical Energy Generated
_____0____
_____0____
____0____
(MWH)
- 19. Unit Service Factor
___N/A____
___N/A____
__N/A____
- 20. Unit Availability Factor
___N/A____
___N/A____
__N/A____
- 21. Unit Capacity Factor (Using MDC
___N/A____
___N/A____
__N/A____
Net)
- 22. Unit Capacity Factor (Using DER
___N/A____
___N/A____
__N/A____
Net)
- 23. Unit Forced Gutage Rate
___N/A____
___N/A____
__N/A____
- 24. Shutdowns Scheduled Over Next 6 Montns (Type, Date, and Duration of Each): __No signifigant outage glgnged until after_____
_____________________WeCCenty run__________________________________
25.
If Shutdown At End Of Reoort period, Estimated Date of Startuo:
____Nf@_________
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY
___3/86_____
INITIAL ELECTRICITY
___6/86_____
COMMERCIAL OPERATION
__11/86_____
8606230059 B60331 g7 PDR ADOCK 05 59 gh R
o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
_5 0_..5_ _2 9 _ _ _ _ _ _ _
UNIT
_ P _V _N _G _S - 2 _ _ _ - _ _
DATE 0_ 4. _/ _0 8 _/ 8 _6 _ _ _ _ _.- -
COMPLETED BY_J__. _M_.
_B.a._r _k _d o_l._l 4
TELEPHONE _@0g-93g-5300
.E _x _t _. 6.5_ _9.3. _- _-_
M_ON_T_H_:
March 1986 DAY AVERASE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
(MWe-Net)
(MWe-Net) 1
_0_
17
__-_-____0___-_---__-__
2
________0_______-.
18
--0----_
- - - - - - - _ - _ = -
3 0
19 0
20 ___________0_______.-
4
____________0 5
_____0_
_ _ = _ - - _ - _ _
21
__0____
6
___________0
__=
22 ____ ______0_____________
7
__0 23 _________- 0 __ __________
1 8 24 _.
0__=
l 9
___--______0______________
25 ______ ____0 1
10 --
_--_0________
2 6 _. -- - - -
0 h
11
_-______0 27
____0__________--
1 l
12 ____
__ 0 ____
28 ---__ _____.0 13 ____ ______0 2 9
-- - _ _ _- _ _0_
l
)
14 -____ _ ___0______._
30 ______. __ _0________
+
l 15 _____ __ __0_______-____.__
31 _ _ _______0_________
16 _____ ___
_0- - - -
-- =___ ___
.._I
s t
REFUELING INFORMATION DOCKET NO._QO-522__________
UNIT __
_ PMNGS-g_____
DATE_______0440@L8@_____
COMPLETED BY_J.M_t garkdoll-TELEPHONE __603-233-@300____
__Ent s @523_______
1.
Scheduled date for next refueling shutdown.
01/02/88 2.
Scheduled date for restart following refueling.
02/20/88 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not Yet Determined What will these be?
Not Yet Determined i
4.
Scheduled date for submitting proposed licensing action and supporting information.
1 Not Yet Determined 5.
Important Licensing consicerations associated with refueling, D*
- e. g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Not Yet Determined i
6.
The number of fuel assemblies.
a) In the core._g41___________
b) In the scent fuel storage pool.__
_0_______
7.
Licensed spent fuel storage capacity.____13@2_
_=
Intended change in spent fuel storage capacity __Noge______
8.
projected date of last refueling that can be discharged to soent fuel storage pool assuming present capacity.
2003 (w/ annual reloads and full core discharge capability).
i
guMMegy gE gpEBOIIhg E3EEBIENCE EOS 185 MgNIH DOCKET NO.___s0 _529___________
UNIT _________PVdgS g__________
DATE_________04LOH/B6_________
COMPLETED BY_J M gathdoll____
s u TELEPHONE __60@r932:5300_______
__E t3t 6523__________
03/01 0700 Plant in Mode 5.
C3/10 1100 Entered Mode 4.
C3/25 2249 Entered Mode 3.
1 l
' E' 'lJNIT SHUTDOWNS AND POWER RCDUCTIONS.. *. DOCMCT NO.
90 979
{
UNIT HAMC PVMf S ?
s '
DATC
=
I CCHPLCTED BY
"~ "Wl0 0
'S t
TELEPHONC ' 4 U-WO p.r e (A n 3 Hethod or Shutting Down System Component Cause & Corrective 1
1 Duration 2
3 l.CR 4
5 Action to No.
Date Type
( alou rs )
Reason Roactor No.
Codo Code Prevent ficcurrence t
,t Not applicable - Reactor has not roached criticality i
6 s
a s
k 1
2 3
k F-rorced Rensnn:
Hethod:
Exhibit r - Instructions
$=5choduled A-Equipment failuro (Explain) 1-f ta nua l for Prnparation or Datn D-ffaintenance or Test 2-Hanual Scram.
Ent ry Sheets f or I.icensoo C-fte rtse l ing 3-Automa tic scram.
Event Report (LCR) file D-negislatory !! cst riction as-Cnnt inisa t ion f rom-(NURCC 0161)
E-Opera tor Tra ining & Licensa Examina tion Prnvious Month T-Administrativo 5-nerf uc t inn e r Pnf 8L 1
. "r s.
Arizona Nuclear Power Project P.o. BOX 52034 e PHOENIX. ARIZONA 85072-2034 April 15, 1986 ANPP-36149-EEVB/PGN/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 (License NPF-46)
March Monthly Operating Report File: 86-024-404
Dear Mr. Scroggins:
Attached please find the March, 1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station. Unit 2 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.
If you have any questions, please contact me.
Very truly yours P
.h V Ch q CA.L E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/PGN/rw Attachments cc:
J. B. Martin (all w/a)
R. P. Zimmerman E. A. Licitra A. C. Gehr INP0 Records Center