ML20206D875

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/87-13 & 50-457/87-11 on 870223-0402.No Violations or Deviations Noted
ML20206D875
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/07/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20206D878 List:
References
NUDOCS 8704130449
Download: ML20206D875 (2)


See also: IR 05000456/1987013

Text

. _ .

. .,

APR 0 71957

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. A. Dunlop, Jr.,

C. VanDenburgh, and R. Mendez of this office, on February 23 through April 2,

1987, of activities at the Braidwood Station, Units 1 and 2, authorized by

NRC Operating License No. NPF-59 and Construction Permit No. CPPR-133 and to

the discussion of our findings with Mr. P. L. Barnes at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of_ procedures and representative records, observations, and

interviews with personnel.

No violations or deviations with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

criginal 815"80 D

Charles W. Hehl, Chief

Operations Branch

Enclosure: Inspection Reports

No. 50-456/87013(DRS);

No. 50-457/87011(DRS)

See Attached Distribution

4

'

8704130449 870407

4 PDR ADOCK 05000456 i

i

PDR g

G

k

_ . - - - -

__ _ . _ . _ _ _ _ _ _ _ _ _ . _ -

JEO f -_ ___

_-

, .

Coninonwealth ' Edison Company 2 APR 0 71987

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

,;M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

J. Moore, 0GC

G. Berry, OGC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

RIII RIII RIII RII RI

.

RIII}

D lop ik b h t L e He

  1. r