ML20206D873

From kanterella
Jump to navigation Jump to search
Advises That LER Re Inoperability of Both Unit Annulus Ventilation Sys Trains Will Be Submitted by 881130.Delay Due to Unresolved Concerns
ML20206D873
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 11/11/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8811170308
Download: ML20206D873 (1)


Text

_ _

ll l

Dche Mwr Company lia B T w h e ihuhnt

' to B,a 331)$

Charlotte. N C 28242 k k efr a twa (70ht.*3 6Il DUKEPOWER November 11, 1988 i

U.S. Phaclear Ngulatory Cbunissicn i

Dtament Cbntrol Desk W ahington, DC 20555

Subject:

Mont'.re McLaar station, thit 1 Dochet m. 50a-369 i

License Event Rotert Delay Notifica* den j

Gentlanen:

Pursuant to IvCFR 50.73 Sections (a) (1) and (d), a Licensee Event Report concerniry the incperability of both thit 1 Annulus Wntilation system trains l

was to be subnitted on November 11, 1988.

Please be advised that due to r

unresolved concerns, this report will be delayed and subnitted no later than Novatber 30, 1988.

Ehould there be any questions contact S.E. IeRoy at (704) 373-6233.

l Wry truly yours, hbSf l

lial B. ' nicker l

l SEL/358/nuf Attachment f

t xc Mr. M.L. Ernst hnerican Pk1 clear Insurers l

Dep1ty Administrator, Region II c/o Dottie Sheman, ANI Libra:y U.S. Nuclear Regulatory (bemissica

'Ibe Exchange, Duite 245 l

l 101 Mariotta St., NW, Suite 2900 270 Tamington Aver.ue l

Atlanta, G 30323 Famington, Cr 06032 i

INPO h W s Center Mr. Darl lbod l

Suite 1500 U.S. Nuclear regulatory Cbmn.

I' 1100 circle 75 Parkway Nuclear kactor Regulation Atlanta, m 30339 Washington, EC 20555 Met Nuclear Consultants Mr. P.K. Wn Doorn j

1221 Aveme of the haericas

?mC Resident Inspector New York, NY 10020

}t<luire Mclear Station I

8811170308 801111 f

ADOCK0500gg9 p

l DR l

-