AVERAGE DAILY UNIT. POWER LEVEL 4

DOCKET NO. 50-245~

UNIT Millstone 1 DATE'860407-COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Ext. 4400 MONTH March 1986

-DAY AVERAGE DAILY POWER: LEVEL

. DAY AVERAGE DAILY POWER LEVEL.

(MWe-Net) '

-(MWe-Net) 1 659 17 659 2-659 18 659 3

659 19 657 4

659 20 658 5

658 21 659 6

659 22 624 7

658 23 659-8 659 24 658-9 659 25 659 10 659 26 653 11 659 27

'659 12 550 28 660 13

'659 29 660 14 659 30 660 15 660 31 660 16 660 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for _each' day in the reporting month.

Compute to.the nearest whole megawatt.

8606200382 860331 Gik DR ADOCK 0000 5

-46 tk\\-

OPERATING DATA REPORT r

DOCKET NO. 50-245 DATE'860407 i

COMPLETED BY G. Newburgh 2

i

-TELEPHONE'(203) 447-1791

-Ext. 4400 OPERATING STATUS 1.

Unit Name:

Millstone Unit 1 Notes 2.

Reporting Period:

March 1986 3.

Licensed Thermal Power (MWt):

2011 I

4.

Nameplate Rating (Gross MWe):

662 5.

-Design Electrical Rating (Net MWe):

660 6.

Maximum Dependable Capacity (Gross MWe):

684-7.

Maximum' Dependable Capacity (Net MWe):

-654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

=N/A' 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A i

10.

Reasons For Restrictions, If Any:

N/A I

1 i.

This Month.

Yr.-to-Date Cumulative i

11.

Hours In Reporting Period 744

'2160 134448-12.

Number Of Hours Reactor Was Critical-744 2125.3-103204.1 13.

Reactor Reserve Shutdown Hours 0

0 2834.5 i

14.

Hours Generator On-Line' 744 2118.7 100307.9 15.

Unit Reserve Shutdown Hours 0

0 93.7

16. Gross Thermal Energy Generated (MWH) 1482541 4213538 184827736
17. Gross Elec. Energy Generated (MWH).

508600 1445200-62146496 18.

Net Electrical Energy Generated (MWH) 486762 1382648 59272420

.19.

. Unit Service Factor 100-98.1-74.6 20.

Unit Availability Factor 100 98.1 74.7 21.

Unit Capacity Factor (Using MDC Net) 100 97.9

,67.4

22. _ Unit Capacity Factor (Using DER Net)

-99.1-97.0 66.8 i

23.

Unit Forced Outage Rate 0

1.9 12.2 24.

Shutdowns Scheduled.0ver Next 6 Months (Type, Date,,and Duration offEach):

N/A g

25.

If Shut Down At.End Of Report Period, Estimated Date of-Startup:

N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL' CRITICALITY

~

INITIAL ELECTRICITY N/A l

COMMERCIAL OPERATION i

~

DOCKET NO. 50-245 UNIT SHUTOOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 860407 COMPLETED BY G. Newburgh REPORT MONTH March 1986 TELEPHONE (203) 447-1791 Ext. 4400 l

2 No.

Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective.

(Hours)

Shutting Event Code Code

' Action to 3

Down Reactor Report #

Prevent Recurrence 2.

860412 S

0 B

5 N/A N/A N/A Reduced power to repair Feed Reg.

Valve Positioners.

1 2

3 4

F:. Forced Reason:

Method:

Exhibit G

. Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensed C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)

E-Operator-Training & License Examination previous month F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Duration = 0)

Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain) e

REFUELING INFORMATION REQUEST 1.

Name of facility:

Millstone 1 2.

Scheduled date for next refueling shutdown:

May 1987 3.

Schedule date for restart following refueling: August 1987 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes,' Technical Specification Changes Regarding:

(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.

Scheduled date(s) for submitting licensing action and supporting information:

Spring 1986 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

200 GE8B Fuel Assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: (a) 580 (b) 1546 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity _that has been requested i

or is planned, in number of fuel assemblies:

2184 Assemblies 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1987, Spent Fuel Pool Full Core Off Load Capability is Reached.

1991, Core Full, Spent Fuel Pool Contains 2146 Bundles.

s

o NORTIMAST UTILITIES

"'c" * $*

  • a S""' E"a C a n"*'

J 7,,71"d,Q[,C ","

P.O. BOX 270

.am.ma wa co HARTFORD, CONNECTICUT 06141-0270 a

cow-(203) 666-6911 g

g April 8, 1986 MP-8910 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Provisional License DPR-21 Docket No. 50-245

Dear Sir:

In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.

One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY h 0

,b W. D. Romb,

Station Superintendent Millstone Nuclear Power Station WDR/GSN:jlc

Enclosures:

(

)

cc:

Director, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. (10)

U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555 d

'ye7, i

i