Text
_ ____
._ __
_.
'.i
. .
pv
- r
l
EVE 7 Du
-
-
i
^
Docket Nos. 50-277
!
50-278
i
!
Philadelphia Electric Company
!
ATTN: Mr. C. A. McNeill
l
Executive Vice President-Nuclear
l
Correspondence Control Desk
i
P. O. Box 7520
l
Philadelphia, Pennsylvania 19101
i
Gentlemen:
.
f
Subject: Combined Inspection Nos. 50-277/88-35 and 50-278/88-35
This refers to the routine safety inspection conducted by T. Rebelowski of this
l
l
office on September 26-30, 1988, at Peach Bottom Atomic Power Station, Delta,
j
'
Pennsylvania of activities authorized by NRC License Nos. DPR-44 and DRP-56,
and to the discussions of our findings held by Mr. T. Rebelowski with Mr. D. M.
'
i
Smith and other members of your staff at the conclusion of the inspection.
.
Areas examined during this inspection are described in the NRC Region !
Inspection Report which is enclosed with this letter. Within these areas, the
1
inspection consisted of selective examinations of procedures and representative
i
records, interviews with personnel, and observations by the inspector.
Our inspector also verified the steps ycu have taken to correct the deviation
brought to your attention in a letter dated March 11, 1987. We have no further
j
questions regarding the steps you took to correct this deviation (assigned NRC
'
Item 50-277/86-25-04).
Within the scope of this inspection, no violations were observed; however, we
are concerned that deficiencies in system level procedures forced operators to
suspend the conduct of two of three surveillance tests for which we were
i
evaluating performance. Although, in each case, the operators correctly
delayed performance until the identified procedure deficiencies were resolved,
,
we believe this concern warrants additional management attention to ensure the
scope of procedure deficiencies is understood and comprehensive corrective
action is implemented.
I
!
l
<h
\\Da
OFFICIAL RECORD COPY
CIR PB 83-35 - 0002.0.0
11/04/88
8811170209 881107
ADOCK 05 W 277
0
ppe
-
_ _ _ _ - _ _ _ _ _ _
_
_ _ _ - - - _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. _ _ .
. , ,
-.
Philadelphia Electric Company
2
No reply to this letter is required. Yt,ur cooperation with us in this matter
is appreciated.
Sincerely.
Orllnsf Signed Br.
i
Ih0 mas T. MBrtin
Thomos T. Martin, Dire: tor
Division of Reactor Safety
Enclosure:
Combined NRC Region ! Inspection Report Number 50-277/88-35, 50-278/88-35
cc w/ enc 1:
John S. Keeper, Sr., Senior Vice President-Nuclear
J. W. Gallagher, Vice President, Nuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station
Ja:k Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
John F. Frant, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr., Esquire
W. H. Hirst Director, Joint Generation Projects Department.
Atlantic Electric
Bryan W. Gorman, Manager, External Affairs
. Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Huvis, Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations
W. M. Alden, Director, Licensing Section
Doris Poulsen, Secretary of Harford County Counct)
Pubite Document Room (PDR)
Local Public Document Room (LPOR)
'
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
OFFICIAL RECORD COPY
CIR PB 88-35 - 0002.1.0
11/04/88
L.
_ _ _ - - - - - - -
< *
.
.
.
Pht.1adelphia Electric Company
2
cc w/ enc 1:
John S. Kemper, Sr., Senior Vice President-Nuclear
J. W. Gallagher, Vice President, Nuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
Ofckinson M. Smith, Vice President, Peach Bottom Atomic Power Station
Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
John F. Franz, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr., Esquire
W. H. Hirst, Of rector, Joint Generation Projects Department,
Atlantic Electric
Bryan W. Gorman, Manager, External Affairs
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant $1 ting, Nuclear Evaluations
W. M. Alden Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Pubite Document Room (POR)
local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o erc1)
Sectiori Chief, DRP
PA0 (2) SALP and All Inspection Reports
Robert J. Bores. ORSS
R. Martin, NRR
B. Clayton, E00
RI:0RS .
p RI O S
RI:0RS
.
Rebelowski/
s
Blumberg
Gallo/
h. .
)['/83
I
10
/83
10/ /88
)
l\\ i
0FFICIAL RECORD COPY
CIR PB 88-35 - 0003.0.0
10/21/88
.-
.
.
)