Forwards Safety Insp Repts 50-277/88-35 & 50-278/88-35 on 880926-30.No Violations Noted.Concern Re Deficiencies in Sys Level Procedures That Forced Operators to Suspend Conduct of Surveillance Tests Noted
ML20206D671
Person / Time
Site: Peach Bottom  
Issue date: 11/07/1988
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20206D676 List:
References
NUDOCS 8811170209
Download: ML20206D671 (3)


See also: IR 05000277/1988035

Text

_ ____

._ __

_.

'.i

. .

pv

- r

l

EVE 7 Du

-

-

i

^

Docket Nos. 50-277

!

50-278

i

!

Philadelphia Electric Company

!

ATTN: Mr. C. A. McNeill

l

Executive Vice President-Nuclear

l

Correspondence Control Desk

i

P. O. Box 7520

l

Philadelphia, Pennsylvania 19101

i

Gentlemen:

.

f

Subject: Combined Inspection Nos. 50-277/88-35 and 50-278/88-35

This refers to the routine safety inspection conducted by T. Rebelowski of this

l

l

office on September 26-30, 1988, at Peach Bottom Atomic Power Station, Delta,

j

'

Pennsylvania of activities authorized by NRC License Nos. DPR-44 and DRP-56,

and to the discussions of our findings held by Mr. T. Rebelowski with Mr. D. M.

'

i

Smith and other members of your staff at the conclusion of the inspection.

.

Areas examined during this inspection are described in the NRC Region !

Inspection Report which is enclosed with this letter. Within these areas, the

1

inspection consisted of selective examinations of procedures and representative

i

records, interviews with personnel, and observations by the inspector.

Our inspector also verified the steps ycu have taken to correct the deviation

brought to your attention in a letter dated March 11, 1987. We have no further

j

questions regarding the steps you took to correct this deviation (assigned NRC

'

Item 50-277/86-25-04).

Within the scope of this inspection, no violations were observed; however, we

are concerned that deficiencies in system level procedures forced operators to

suspend the conduct of two of three surveillance tests for which we were

i

evaluating performance. Although, in each case, the operators correctly

delayed performance until the identified procedure deficiencies were resolved,

,

we believe this concern warrants additional management attention to ensure the

scope of procedure deficiencies is understood and comprehensive corrective

action is implemented.

I

!

l

<h

\\Da

OFFICIAL RECORD COPY

CIR PB 83-35 - 0002.0.0

11/04/88

8811170209 881107

PDR

ADOCK 05 W 277

0

ppe

-

_ _ _ _ - _ _ _ _ _ _

_

_ _ _ - - - _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. _ _ .

. , ,

-.

Philadelphia Electric Company

2

No reply to this letter is required. Yt,ur cooperation with us in this matter

is appreciated.

Sincerely.

Orllnsf Signed Br.

i

Ih0 mas T. MBrtin

Thomos T. Martin, Dire: tor

Division of Reactor Safety

Enclosure:

Combined NRC Region ! Inspection Report Number 50-277/88-35, 50-278/88-35

cc w/ enc 1:

John S. Keeper, Sr., Senior Vice President-Nuclear

J. W. Gallagher, Vice President, Nuclear Services

E. C. Kistner, Chairman, Nuclear Review Board

Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station

Ja:k Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Frant, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr., Esquire

W. H. Hirst Director, Joint Generation Projects Department.

Atlantic Electric

Bryan W. Gorman, Manager, External Affairs

. Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Huvis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Director, Licensing Section

Doris Poulsen, Secretary of Harford County Counct)

Pubite Document Room (PDR)

Local Public Document Room (LPOR)

'

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

OFFICIAL RECORD COPY

CIR PB 88-35 - 0002.1.0

11/04/88

L.

_ _ _ - - - - - - -

< *

.

.

.

Pht.1adelphia Electric Company

2

cc w/ enc 1:

John S. Kemper, Sr., Senior Vice President-Nuclear

J. W. Gallagher, Vice President, Nuclear Services

E. C. Kistner, Chairman, Nuclear Review Board

Ofckinson M. Smith, Vice President, Peach Bottom Atomic Power Station

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr., Esquire

W. H. Hirst, Of rector, Joint Generation Projects Department,

Atlantic Electric

Bryan W. Gorman, Manager, External Affairs

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant $1 ting, Nuclear Evaluations

W. M. Alden Director, Licensing Section

Doris Poulsen, Secretary of Harford County Council

Pubite Document Room (POR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o erc1)

Sectiori Chief, DRP

PA0 (2) SALP and All Inspection Reports

Robert J. Bores. ORSS

R. Martin, NRR

B. Clayton, E00

RI:0RS .

p RI O S

RI:0RS

.

Rebelowski/

s

Blumberg

Gallo/

h. .

)['/83

I

10

/83

10/ /88

)

l\\ i

0FFICIAL RECORD COPY

CIR PB 88-35 - 0003.0.0

10/21/88

.-

.

.

)