Requests That Encl Table Detailing Status of NRC Review of Responses to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events, Be Completed W/Dates for Implementation of Required Actions
ML20206C978
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/09/1986
From: Adensam E
Office of Nuclear Reactor Regulation
To: Corbin McNeil
Public Service Enterprise Group
References
GL-83-28, NUDOCS 8606190614
Download: ML20206C978 (3)


Text

w

,8 (g

UNITED STATES p,

NUCLEAR REGULATORY COMMISSION g

(/3j W ASHINGTON, D. C. 20555 5\\;..o//

JUN 9 1986 Docket No. 50-354 Mr. Corbin A. McNeill, Jr., Vice President - Nuclear Public Service Electric & Gas Company Nuclear Administration Buildina P.O. Box 236 Pancocks Bridge, New' Jersey 08038

Dear Mr. McNeill:

Subject:

Generic letter 83-28 On July 8, 1083, PSE&G was provided a copy of Generic letter 83-28, " Required Actions Based on Generic Implications of Salem ATWS Events." The enclosure to this letter details the current status of our review to your responses to Generic letter 83-28. We reouest that you complete the table to indicate by what date, PSE&G will implement the required actions at Hope Creek.

Please respond to this request by June 18, 1986. Do not hesitate to call us if you have any questions.

Sincerely, k

Elinor G. Adensam, Director RWR Project Directorate No. 3 Division of BWR Licensinp

Enclosure:

As stated cc: See next page

.8d T$b

[

nruna nnng P

Mr. C. A. McNeill Public Service Electric & Gas Co.

Hope Creek Generating Station CC:

Gregory Minor Susan C. Remis Richard Hubbard Division of Public Interest Advocacy Dale Rridenbauch New Jersey State Department of MHB Technical Associates the Public Advocate 17?3 Hamilton Avenue, Suite K Richard J. Hughes Justice Comples San Jose, California 95125 CN-850 Trenton, New Jersey 08625 Troy B. Conner, Jr., Esquire Conner & Wetterhahn Office of Legal Counsel 1747 Pennsylvania Avenue N.W.

Department of Natural Resources Washington, D.C.

20006 and Environnental Control 89 Kings Highway Richard Fryling, Jr., Esauf re P.O. Rox 1401 Associate General Solicitor Dover, Delaware 19903 Public Service Electric & Gas Company P.O. Box 570 T5E Mr. K. W. Burrowes, Pro.iect Engineer Newark, New Jersey 07101 Bechtel Power Corporation 50 Beale Street Pesident inspector P.O. Rox 3965 U.S. Nuclear Pegualtory Commission San Francisco, California 94119 P.O. Rox 241 Hancocks Bridoe, New Jersey 08038 Manager - Licensing and Reoulation c/o Public Service Electric & Gas Richard F. Engel Rethesda Office Center, Suite 550 Deputy Attorney General 4520 East-West Highway Division of Law Bethesda, Maryland 20814 Environmental Protection Section Richard J. Hughes Justice Complex Ms. Rebecca Green CN-112P New Jersey Bureau of Radiation Trenton, New Jersey 08625 Protection 380 Scotch Road Mr. Robert J. Touhey, Acting Director Trenton, New Jersey 08628 DNREC - Division of Environmental Control 89 Kings Highway Mr. Anthony J. Pietrofitta P.O. Rox 1401 General Manager Dover, Delaware 19903 Power Production Engineering Atlantic Electric i

Mr. R. S. Salvesen 1199 Black Horse Pike General Manager-Hope Creek Operation Pleasantville, New Jersey 08?37 Public Service Electric & Gas Co.

P.O. Box A Pegional Administrator, Reoion I l

Hancocks Bridge, New Jersey 08038

11. S. Nuclear Regulatory Commission 631 Park Avenue Mr. R. A. Preston King of Prussia, Pennsylvania 19406 i

Public Service Electric & Gas Co.

Hope Creek Site MC12Y Licensing Trailer 12LI Foot of Ruttonwood Road Hancocks Pridae, New Jersey 08038

?

HOPE CREEK GENERIC LETTER P3-28 REVIEW PSE&G IMPLIMENTATION ITEM STATUS DATE 1.1 SED sent to PSE8G by letter dated 01/22/86.

1.2 SEP sent to PSE&G by letter dated 02/03/86.

2.1 Review is nqgoing.

(Will be completed by 09/30/86)

?.2 Review is ongoing.

(Will be comoleted by 00/3n/86) 3.1.1 Review is ongoing.

(Will be completed by 06/30/86) 3.1.2 Review is ongoing.

(Will be completed by 06/30/86) 3.1.3 SER sent to PSE&G by letter dated 01/22/86.

3.2.1 Review is ongoing.

(Will be completed by 06/30/86) 3.2.2 Review is ongoing.

(Will be completed by 06/30/86) 3.2.3 SER sent to PSE&G by letter dated 01/22/86.

4.5.1 Review is ongoing.

(Will be completed by 06/30/86) 4.5.2 Review is onooing.

(Will be completed by 09/30/86) 4.5.3 Review is ongoing.

(Will be completed by 09/30/86) l l