ML20206C823
| ML20206C823 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 11/03/1988 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Radford Converse POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML20206C827 | List: |
| References | |
| NUDOCS 8811160427 | |
| Download: ML20206C823 (2) | |
See also: IR 05000333/1988017
Text
-
_
_
_ _ _
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
.
O "
\\*
03 NOV 1988
Docket No. 50-333
New York Power Authority
James A. FitzPatrick Nuclear Power Plant
ATTN: Mr. Radford J. Converse
Resident Manager
P.O. Box 41
Lycoming, New York 13093
Subject:
Inspection Report No. 50-333/68-17
This letter transmits the results of the routine inspection conducted by Messrs.
A. Luptak and R. Plasse of this office on August 8, 1938 - October 5, 1988, e
the J. A. FitzPatrick Nuclear Power Plant, Scriba, New York.
Mr. Luptak
discussed the inspection findings with you and other members of your staff at
the conclusion of the inspection.
Based on this inspection, an apparent violation of NRC requiruents has been
identified and is described in the enclosed Notice of Violation.
The violation
involved several examples of failure to follow procedures. These involved the
use of a drawing which was not in the drawing control system and charging of a
hydraulic control unit accumulator which resulted in inadvertent control rod
insertion during refueling operations. You are required to respond to this
letter; in doing so pl(ase follow the instructions in Appendix A of this letter.
The response directed by this letter and the accompanying Notica of Violation is
not subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork R' action Act of 1980, PL 96-511.
Your cooperation wid. us is .oreciated.
Sincerely,
fM
flGIMId. IICNEI) BYc!
/
kdwardC.Venzinger, Chief
h Projects Branch No. 2
Division of Reactor Projects
Enclosures:
1. Appendix A, Notice of Violation
2. NRC Region ! Inspection Report Number 50-333/S8-17
[IN
[
G
OFFICIAL RECORD C0pY
IR FITZ SS-17 - 0001.0.0
11/03/S8
/ / kl
/}
V-
I
7
_
. .
-
..
'-
Power Authority of the State
.
of New York
2
03 NOV 1988
4
cc w/encis:
J. P. Bayne, President
E .
J. C. Brons, Executive Vice President-Nuclear Generatic
.
R. E. Beedle, Vice President Nuclear Support
S. S. Zulla, Vice President Nuclear Engineertug
R.-Burns, Vice President Nuclear Operations
- A. Klausmann, Senior Vice President-Appraisal and Comp 11anc
. vices
1
R. L. Patch, Quality Assurance Superintendent
,
G. H. Wilverding, Manager, Nuclear Safety Evaluation
G. C. Goldstein, Assistd.st General Counsel
Department of Public Service, State of New York
State of New York, Department of Law
'
Public Document Room (POR)
local Public Document Room (LPDR)
.!
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
,
bec w/encis:
Region I Docket Room (with concurrencec)
'
Management Assistart, DRMA (w/o encis)
Se: tion Chief, DRP
Robert J. Bores, DRSS
State Liaison Officer (SLO)
H. Abelson, LPM, NRR
M. Johnson, EDO, Region I Coordinator
W. Cook, SRI, NMP1/2
P. Koltay, SRI, IP3
L
!
,
RI:
Rh
Jh(Wenzinger
Johnson /rbl
j
11/$ '88
11/)/88
[
OFFICIAL RECORD COPY
IR FITZ 88-17 - 0002.0.0
!
11/03/88
i
P
,
j
..-,,, - -- - _ _ - - - -_ .-
-. , . . -
-
. -. - _-.,_ _ _- _ - , _ .