ML20206C806

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-424/86-35 on 860505-09.No Violations or Deviations Noted
ML20206C806
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/10/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20206C810 List:
References
NUDOCS 8606190568
Download: ML20206C806 (3)


See also: IR 05000424/1986035

Text

7

_

f_.

.*

..

JON 10146

Docket No. 50-424

License No. CPPR-108

Georgicy' Power Company

ATTN: v Mr. J. H. Miller, Jr.

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

INSPECTION REPORT N0. 50-424/86-35

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

S. A. Vias on May 5 - 9, 1986.

The inspection included a review of activities

authorized for your Vogtle facility.

At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. . ithin these

W

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

i

- Sincerely,

Y. .Ak h

'

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ encl:

(See page 2)

gh$

f

G

i

_

,

T

%

'

,

-

JUN 10 IM6

Georgia Power Company

2

'

.

_

c w/ encl:

V R. E. Conway, Senior Vice President &

f.ProjectDirector

D

O. Foster, Vice President, Project

/ Support

VP. D. Rice, Vice President, Project

Engineering

. H. Pinson, Vice President, Project

/J. T. Beckham, Vice President &

Construction

j General Manager - Operations

v'R. A. Thomas, Vice President,

j Licensing

V D. S. Read, Gereral Manager,

/QualityAssurance

C. W. Hayes, Vogtle Quality

/ Assurance Manager

V W. C. Ramsey, Manager -

/G.B.Bockhold,GeneralManager.

Readiness Review

/ Nuclear Operations

JL. Gucwa, Manager, Nuclear Safety

/ and Licensing

VM. H. Googe, Project

Construction Manager

/E. D. Groover, Quality

Assurance Site Manager -

/. Construction

J

A. Bailey, Project Licensing

Manager

/G. F. Trowbridge, Esq., Shaw,

/B.W. Churchill,Esq.,Shaw,Pittman, Potts and Trowbridge

/ Pittman, Potts and Trowbridge

J E. L. Blake, Jr. , Esq. , Shaw,

f Pittman, Potts and Trowbridge

JJ. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

]J. G. Ledbetter, Comissioner,

Department of Human Resources

C. H. Badger, Office of Planning

f.andBudget

D Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

/D.C.Teper,GeorgiansAgainst

-

Nuclear Energy

(ccw/enclcont'd-Seepage 3)

'

i

JUli 10 1996

-

,

Georgia Power Company

3

[M.B.Margulies,Esq., Chairman,

cc w/ enc 1 cont'd)

Atomic Safety and Licensing Board

/Dr. O. H. Paris, Administrative Judge

Panel

Atomic Safety and Licensing Board

Panel

/G.- A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

B. P. Garde, Citizens Clinic, Director

Government Accountability Project

bec w/ enc 1:

. Reis, ELD

. M. Hill, IE

V M. Miller, NRR

v W. Brach, EDO

A . Sinkule, RII

/E. Chri::tnct, RII

v'NRC Resident Inspector

V' Document Control Desk

/ State of Georgia

I

I

RI

y

,

ias

lake

SHerdt

/p/86

5//fj/86

g/@/86

.

u.