ML20206C806
| ML20206C806 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/10/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20206C810 | List: |
| References | |
| NUDOCS 8606190568 | |
| Download: ML20206C806 (3) | |
See also: IR 05000424/1986035
Text
7
_
f_.
.*
..
JON 10146
Docket No. 50-424
License No. CPPR-108
Georgicy' Power Company
ATTN: v Mr. J. H. Miller, Jr.
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
INSPECTION REPORT N0. 50-424/86-35
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
S. A. Vias on May 5 - 9, 1986.
The inspection included a review of activities
authorized for your Vogtle facility.
At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. . ithin these
W
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
i
- Sincerely,
Y. .Ak h
'
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
gh$
f
G
i
_
,
T
%
'
,
-
JUN 10 IM6
Georgia Power Company
2
'
.
_
c w/ encl:
V R. E. Conway, Senior Vice President &
f.ProjectDirector
D
O. Foster, Vice President, Project
/ Support
VP. D. Rice, Vice President, Project
Engineering
. H. Pinson, Vice President, Project
/J. T. Beckham, Vice President &
Construction
j General Manager - Operations
v'R. A. Thomas, Vice President,
j Licensing
V D. S. Read, Gereral Manager,
/QualityAssurance
C. W. Hayes, Vogtle Quality
/ Assurance Manager
V W. C. Ramsey, Manager -
/G.B.Bockhold,GeneralManager.
Readiness Review
/ Nuclear Operations
JL. Gucwa, Manager, Nuclear Safety
/ and Licensing
VM. H. Googe, Project
Construction Manager
/E. D. Groover, Quality
Assurance Site Manager -
/. Construction
J
A. Bailey, Project Licensing
Manager
/G. F. Trowbridge, Esq., Shaw,
/B.W. Churchill,Esq.,Shaw,Pittman, Potts and Trowbridge
/ Pittman, Potts and Trowbridge
J E. L. Blake, Jr. , Esq. , Shaw,
f Pittman, Potts and Trowbridge
JJ. E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
]J. G. Ledbetter, Comissioner,
Department of Human Resources
C. H. Badger, Office of Planning
f.andBudget
D Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
/D.C.Teper,GeorgiansAgainst
-
Nuclear Energy
(ccw/enclcont'd-Seepage 3)
'
i
JUli 10 1996
-
,
Georgia Power Company
3
[M.B.Margulies,Esq., Chairman,
cc w/ enc 1 cont'd)
Atomic Safety and Licensing Board
/Dr. O. H. Paris, Administrative Judge
Panel
Atomic Safety and Licensing Board
Panel
/G.- A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
B. P. Garde, Citizens Clinic, Director
Government Accountability Project
bec w/ enc 1:
. Reis, ELD
. M. Hill, IE
V M. Miller, NRR
v W. Brach, EDO
A . Sinkule, RII
/E. Chri::tnct, RII
v'NRC Resident Inspector
V' Document Control Desk
/ State of Georgia
I
I
RI
y
,
ias
lake
SHerdt
/p/86
5//fj/86
g/@/86
.
u.