ML20206C740

From kanterella
Jump to navigation Jump to search
Forwards Rev 5 to ATWS Mitigation Sys Specific Design for Byron/Braidwood Stations
ML20206C740
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 11/09/1988
From: Chrzanowski R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20206C743 List:
References
NUDOCS 8811160389
Download: ML20206C740 (1)


Text

-

c

/ '~> Commonwealth Edison 4

/

) On) Fust Nat:onal Ptiza, Chicago, Ilhnois 7 Address R: ply to: Post Othca Box 767

/ Gnicago, Ilknois 60090 x m-November 9, 1988 U. S. Nuclear Regulatory Commission Attn Document Cont: ol Desk Washington, DC 20555

Subject:

Byron Station Units 1 and 2 Braldwood Station Units 1 and 2 A'IWS Protection - 10CTR 50.62 tlRC_DocAtLRoadQ-15EiS5 and 50-4161451 References (a) January 30, 1987 letter from P.C. LeBlond to li.R. Denten (b) May 11, 1987 letter from P.C. LeBlond to U.S. HRC (c) March 8, 1988 letter from K.A. Alnger 1,9 U.S. HRC Gentlemen A teleconference was held between Comet.onwealth Edison personnel and the NRC Staff to discuss Commonwealth Edison's proposed design for the A'1HS Hjcigation System (AMS) for Byron and Braldwood Stations. This design had been previously submitted in referenesa (a), (b), and (c).

Enclosed with this letter is Revision 5 to "A'1HS Hitigation System Specific Design for Byron /Braidwood Stations".

Revision 5 contains design changes that resulted from the teleconference mentioned above. The specific design changes includes a) New information on the output isolation relays.

b)

Additional information on the isolator qualifications.

Please direct any further questions regarding this matter to this office.

Very truly yours, GHGU 0811160309 B01109 R.

A. Chrsanowski ADOCK050g5,4 Nudear Mc nsing Administrator PDR P

/sc1 Encl.

5315K cet Byron Resident Inspoctor g

Braidwood Resident Inspector p

S.P. Sands g ig Region III Office