OPERATING DATA REPORT Docket No.
50-271 Date 860610 Completed by G.A. Wallin Telephone (802) 257-7711 OPERATING STATUS Notes:
1.
Unit Names Vermont Yankee 2.
Reporting Period:
May 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe): N/A
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Da te Cumulative
- 11. Hours in Reporting Period 744.00 3623.00
- 12. Number of Hours Reactor was Critical O.00 0.00 93111.06
- 13. Reactor Reserve 3hutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 0.00 0.00 90718.35
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 0.00 0.00 132109630.50
- 17. Gross Electrical Energy Generated (MWH) 0.00 0.00, 43955902.00
- 18. Net Electrical Energy Generated (MWH) 0.00 0.00 41700250.00
- 19. Unit Service Factor 0.00 0.00 75.58
- 20. Unit Availability Factor 0.00 0.00 75.58
- 21. Unit Capacity Factor (using MDC Net) 0.00 0.00 68.94
- 22. Unit Capacity Factor (using DER Net) 0.00 0.00 67.59
- 23. Unit Forced Outage Rate 0.00 0.00 6.92
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
Refueling outage began September 21,1985 for 40 weeks.
- 25. If shut down at end of report period, estimated date of startup June 26, 1986
- 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved Initial Criticality VYDPF 0411.01 Initial Electricity Original Comercial Operation 8606190497 860531 PDR ADOCK 05000271 R
PDR Y o
=.
AVERAGE DAILY UNIT POWER LEVEL Occket No.
50-271 Unit Vermont Yankee Date 860610 Completed by G.A. Wallin Telephone (802) 257-7711 MONTH May DAY AVERAGE DAILY POWER LEVEL
[AY AVERAGE DRILY POWER LEVEL j
(MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
i 3
0 19 0
4 0
M 0
5 0
21 0
6 0
22 0
7 0
23
- 0 8
0 24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
f 14 0
30 0
15 0
31 0
l 16 0
1 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
VYDPF 0411.02 Original i
i v
w.
,e
-..-,e r,
e n,- r
Docket No.
50-271 Unit Vermont Yankee UNIT SiUTDOWNS AND POWER REDUCTIONS Date 860610 Completed by G. A. Wallin REPORT K) NTH May Telephone (802) 257-7711 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report #
85-14 860501 S
744 C
1 N/A N/A N/A 1985/1986 RefuelingA4aintenance/
{
(cont:
Recirc Pipe Replacement Outage in progress.
l 1
2 3
4 F-Forced A-Equipment Failure (Explain)
Method:
Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
{
E-Operator Training and License Examination 4-Other (Explain) q F-Administrative 5
i VYDPF 0411.03 G-Operational Error (Explain)
Exhibit I - Same Source Original H-Other (Explain)-
Docket No. 50-271 Unit Vermont Yanke's Date 860610 Completed by G.A. Wallin SAFETY-RELATED MAINTENANCE Telephone (802) 257-7711 EQUIPMENT NATURE OF LER OR OUTAGE ELFUNCTION CORRECTIVE ACTION 4
MAINTENANCE NtMBER CAUT RESLA_T Reactor Water. Clean-up Corrective N/A Worn Parts Draws excessive Replaced Pump Pump P49-1A MR 86-0784 current
- A* Emergency Diesel Corrective LER 84-22 Existing Relay /
N/A Replaced with Generator Differential MR 86-0468 Unqualified Qualified Relay Relay Condensate Storage Tank Corrective N/A Corrosion Tank Leakage Weld Repaired Tank MR 86-0532 WDPF 0411.04 Original
Docket No. 50-271 Unit Vermont Yankee Date 860610 Completed by G.A. Wallin Telephone (802) 257-7711 REPORT K) NTH May SLNMARY OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 0% of rated thermal power for the month.
Gross electrical generation was O
MWH or 0% of design e
electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 0% of rated thermal power.
Throughout the reporting period, the plant was shutdown for the 1985/1986 Rt. fueling #aintenanceMecirc Pipe Replacement Outage.
At the end of the reporting period the plant was operating at 0%
of rated thermal power.
VYDPF 0411.05 Original
Figure I.
VERhiONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 VYV 86-162 June 10,1986 U. S. Nuclear Regulatory Coninission Director, Office of Management Information and Program Control Washington, D. C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of May,1986.
Very truly yours, VERK)NT YANKEE NUCLEAR POWER CORP.
deu--
Warren P. Murphy (
Vice President and Manager of Operations WPM / TAW / mmh:MSR1.1A45R VYDPF 0411 Original M
u
Figure'II.
i i
e i
i.
l.
)
i i
1 l-VEMNT YANKEE NUCLEAR POWER STATION MONTH _Y STATISTICAL REPORT 86 FOR THE MONTH OF MAY,1986 4
I 4
1 i
i 4
- -D '
j -
r i
t
- ?
?
l t
4t i -
i 1
t
+
i r
+
t i
VYDPF 0411 l