Text
7- -. - - - - - - - - - - - - - - - - - - - - - - _
onu'
.
E
NMENT CONTAINS
In Reply Refer To:
Docket:
50-285/88-38
SAFEGUARDS INFORMATION
Omaha Public Power District
ATTN:
Mr. Krinneth J. Morris
i
Division Manager - Nuclear Operations
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
i
This refers to the inspection conducted by Mr. P. H. Harrell of this of fice
during the period October 4-14, 1988, of activities authorized by NRC Operating
-
'
License DPR-40 for the Fort Calhoun Station, and to the discussion of our
findings with Mr. J. J. Fisicaro and other members of your staff at the
conclusion of the inspection.
The area examined during the inspection included security observations. Within
this area, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspector.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Normally, you are required to respond to the
violation, in writing, in accordance with the provisions of Section 2.201 of
the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
,
However, your immediate corrective actions taken during this inspection period,
including your admission of the alleged violation and explanation of the causes,
t
and your planned actions to prevent recurrence have been reviewed and found to
!
be responsive to the specifics contained in the Notice of Violation enclosed
i
with this letter.
Therefore, no written response to this violation is required.
,
,
The material enclosed herewith contains Safeguards Information as defined by
!
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
l
summary, will not be placed in the Public Document Room.
-
I
t
I
A8
asm
db
I
RIV: R
B
C:DR
0:
!$8
PHHarrell/nc
RPMullikin
ell
TFWesterman
LJtMlan
lg@
p/J4/88
g/g/88
d /+ /88
h /> /88
ft/)t88
':
IIh kM
ENCLOSURE CONTAINS
'
5$
SAFEGUARDS INFORMATION
mac
tiOCUMENT CONTAINS
UPON SEPARATION THit
t (
SAFEGUARDS INFORMATION
PAGE IS DECONTROLLED
'$ .$. D f
-
--.-------------
~*s
Omaha Public Power District
-2-
Should you have any quer,tions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Orhin31 %""I "Y
A,n.Urach
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Aopendix A - Notice of Violation
/
2.
Appendix B - NRC Inspection Report
50-285/88-38
cc w/ summary page only:
W. G. Gates, Manager
Fort Calhoun Station
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
Nebraska Radiation Control Program Director
bec copy of entire report:
RIV Security File
P. A. Starcher, RSGB/NRR
R. D. Martin, RA
R. L. Bangart, DRSS
Chief, RPB
Section Chief, SEPS:RPB
Security Inspector
Resident Inspector
SEPS: RPB File
G. F. Sanborn, E0
D. M. Crutchfield, NRR
bcc copy of letter and inspection summary only w/766
Lisa Shea, RM/ALF
Section Chief, DRP/B
RIV File
MIS
RSTS Operator
R. E. Hall, DRSS
Project Engineer, ORP/B
bcc copy of letter and inspection summt.ry only w/out 766:
DMB IE-04
P. Milano, NRR Project Manager
ENCLOSURE CONTAIN3
SAFIGUARDS INU"'
"I
UPON SEPARAT.
PAGE IS DEC07 :