ML20206B471

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1988 for Millstone Unit 1
ML20206B471
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/31/1988
From: Newburgh G, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
MP-12441, NUDOCS 8811150453
Download: ML20206B471 (5)


Text

.

AVEMGE DAILY UNIT POWER LEVIL DOCKET No.

50-245 Uh!T Millstone 1 DATE 881101 l

CCtOLETE BY G. Newburgh TELEPHONE (203)447-1791 Er.tensien 4400 HONTH CCTCBER 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVIM3E DAILY POWER LEVEL (Kde-Net) 0.Me-Net) 1 (52 17 (53 2

(51 18 (52 3

(50 -

19 (52 4

(52 20 600 5

(52 21 (52 6

(26 22 506 7

(45 23 (55 6

(54 24 (54 9

(54 25 (54 10 (21 26 (54 11 654 21 (51 12 (52 26 (57 13 64b 29 (56 14 (55 30 653*

15 (54 31 (56 16 (53

  • Change to Eastern Standard Time INSTRUOTIONS On this format, list the average daily unit power level in Kde-Net for each day in the reporting menth. Ccmputer to the nearest whole megawatt.

M, 8811150453 881031 ADOCK0500g5 DR

r

\\

OPERATING DATA REPORT DOCKET No.

50-245 DATE 881101 COMPLETED BY G. Newburgh TELEPHONE (203)447-1791 Extension 4400 OPEP,ATING STATUS 1.

Unit Name: M111stene 1 Notes:

  • Change to Eastern 3.

Reporting Period: 0:teter 1966 Standard Time 3.

Licensed Thermal Power (Mxt): 2011 4.

Nameplate Rating (Gr:ss MWe): 662 5.

Design Ele:tri:a1 Rating (Ne; FMe): 660 6.

Maxim =n rependable Capa:ity (Gress FMe): 664 7

Maximum Cependable Capacity (Net MWe): (54 6.

If Changes 0 :ur in capacity Ratings (Items Number 3 Through 7)

Sin:e Last Repert, Give Reas ns:

N/A 9.

Fever Level to Wnich Restricted, If Any (Net MWe):

N/A

10. Reas:ns ter Restrictions, If Any:

N/A 745 7,320 157,129

11. H urs In Reporting Period
13. Number of H:urs Rea: tor Was Critical
  • 745 7,290.s 123,61i.s
13. Rea: tor Reserve Shutdown Hours 0

0 3,2s3.3

14. Hours General On-Line 745 7,281.6 120,474.1
15. Unit Reserve Shutd wn Hours 0

0 93.7

16. Grcss Therral Energy Gene ated (MKH) 1,417,522 14,410,675 224,616,770 17 Gr ss Ele. Energy Generated (MWM) 502,100 4,910,400 75,(sf,996
18. Het Ele:trical Energy Generated (MWH) 460,611 4,696,267 72,212,9s?
19. Unit Service Ta:ter 100 99.5 76.7
20. Unit Availability Tacter 100 99.5 1 (.1_ _.
31. Unit Capacity Ta: tor (Using HDC Net) 95.5 96.1 70.3 _
33. Unit Capacity Tactor (Using DER Net) 97.6 97.2 (9.6
23. Unit Forced Outage Rate 0

0.5 10.7 34.

Shutdowns Scheduled Over Next 6 M:nths (Type, Date, and Duratien cf Ea:h):

Refueling Outage, April 1, 1999, 35 day duratien 35.

If Shutdown at End of Eeport Period, Estimated Date of Startup:

N/A

36. Units in Test Status (Prior to Cc=mercial Operation):

Forcast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELICTRICITY N/A N/A COM{ERCIAL CPERATICN N/A N/A

  • o DOCFIT NO. 50-245 UNIT SIIUTDOWNS AND POWER REDUCTIO!!S UNIT NAME Millstone 1 DATE 881101 CCHPI.ETED BT G. Newburgh REPORT PONTII OCTOBER 1988 TELEPItONE (203)447-1791 Extension 4400 No.

Date Type Duration Eeason2 Method of Licensee Sy? tem Component Cause & Corrective l

(Hour?)

Shutting Event Code

  • Codes Ac WJn to Down Reactor 3 Report f Prevent Recurrero

~

68-05 881072 r

0 B

5 N/A N/A N/A Power reduction during cleaning opeations of the intake structure traveling screens.

3 Method:

4 Exhibit G - Instructions IF: Forced 2 Reason:

S: Scheduled A-Equircent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)

E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5 Exhibit 1 - Same Source G-Operational Error (Explain)

(Duration = 0)

Il-Other (Explain) 6-Other (Explain)

,,. c '

a t

i RETUELING INTOPRATION REQUEST l

1.

Nar.e of facility: Millstene 1 l

l 2.

Scheduled date for next refueling shutdown:

APRIL 1989 i

1 l

3.

Schedule date for restart following refueling: MAY 1989 l

4.

Will refueling er resumptien of eperation thereafter require a technical Jpecification change or cther license amendment?

Yes, Technicial Specificatien Changes Regarding:

(1) Maximum Average Planar Linear Heat Generating Eate

12) Maximum Critical Power Eatio i

5.

Scheduled date(s) for suhmitting licensing actien and suppcrting infermatien:

l Winter 1986-89

(,

Important licensing considerations associated with refueling, e.g., neu cr different fuel design er supplier, unreviewed design er performance analysis methods, significant changes in fuel design, new cperating i

procedures:

j 196 GEBB Tuel Asse*blies i

i t

7.

The nu-ler of fuel asserblies (a) in the core and (b) in the spent fuel l

stcrage pool:

j (a)

In Cere:

(a) 580 (b) 1732 8.

The present licensed spent fuel pool storage capacity and the size of f

any increase in licensed storage capacity that has been requested er is planned, in nurter of fuel assertl1es Present caracity, 2184 asserblies

(

Requested in:rease, 1045 assemblies 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

j 1957, Spent Tuel Peel, Full Cere off Lead Capability is Reached l

j Temporary ra:k aperoved f or installati:n if recuired: plans fer l

adattienal caracity in erecress, t

c l

I I

I f

  • NORTHEAST UTILITIES o.n.r.i On.c... s.!e., z.r..i. 8.nm. Conn.ciat s.,,-

.s 1

P O box 270

......um.c..c~..---

e........s-,**

H ARTFORD, CONNECTICUT 061410270

.c..... i %.4 i : ~.

L L

J (203) 665 5000

..4.......,~.-...

Novernbor 9, 1988 HP-12441 Ee:

10;rE50. 71 (a)

U.S. Nuclear Regulatcry C::=issi:n D::urant C:ntr:1 Lesk Washingten, D.C.

20!!!

Referen:e:

Tacility Operating License OPE-21 D::ket NO. 50-245 Eear Sir:

In a:::: dance with Millst:ne Unit 1 Te:hr.ical Specificati:n f.9.1.6, the fell: wing conthly cperating data report for Millstene Unit 1 is en:lesed.

One additienal ::py Of the rep::t is en:1: sed.

Very truly y urs NORTHEA!! NU iEAR ENER3Y CCMFANY s

y,(us e a&

Step.en. 5:a:e Stati:n Superintendent Millst:ne Na: lear F:wer Statien SES/GSN:ljs En:lesures:

(4)

Regi:nal Administrater, Eegion !

William Rayn:nd, Seni:: Resident it.spe:: r

' l