ML20206B471
| ML20206B471 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/31/1988 |
| From: | Newburgh G, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| MP-12441, NUDOCS 8811150453 | |
| Download: ML20206B471 (5) | |
Text
.
AVEMGE DAILY UNIT POWER LEVIL DOCKET No.
50-245 Uh!T Millstone 1 DATE 881101 l
CCtOLETE BY G. Newburgh TELEPHONE (203)447-1791 Er.tensien 4400 HONTH CCTCBER 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVIM3E DAILY POWER LEVEL (Kde-Net) 0.Me-Net) 1 (52 17 (53 2
(51 18 (52 3
(50 -
19 (52 4
(52 20 600 5
(52 21 (52 6
(26 22 506 7
(45 23 (55 6
(54 24 (54 9
(54 25 (54 10 (21 26 (54 11 654 21 (51 12 (52 26 (57 13 64b 29 (56 14 (55 30 653*
15 (54 31 (56 16 (53
- Change to Eastern Standard Time INSTRUOTIONS On this format, list the average daily unit power level in Kde-Net for each day in the reporting menth. Ccmputer to the nearest whole megawatt.
M, 8811150453 881031 ADOCK0500g5 DR
r
\\
OPERATING DATA REPORT DOCKET No.
50-245 DATE 881101 COMPLETED BY G. Newburgh TELEPHONE (203)447-1791 Extension 4400 OPEP,ATING STATUS 1.
Unit Name: M111stene 1 Notes:
- Change to Eastern 3.
Reporting Period: 0:teter 1966 Standard Time 3.
Licensed Thermal Power (Mxt): 2011 4.
Nameplate Rating (Gr:ss MWe): 662 5.
Design Ele:tri:a1 Rating (Ne; FMe): 660 6.
Maxim =n rependable Capa:ity (Gress FMe): 664 7
Maximum Cependable Capacity (Net MWe): (54 6.
If Changes 0 :ur in capacity Ratings (Items Number 3 Through 7)
Sin:e Last Repert, Give Reas ns:
N/A 9.
Fever Level to Wnich Restricted, If Any (Net MWe):
N/A
- 10. Reas:ns ter Restrictions, If Any:
N/A 745 7,320 157,129
- 11. H urs In Reporting Period
- 13. Number of H:urs Rea: tor Was Critical
- 745 7,290.s 123,61i.s
- 13. Rea: tor Reserve Shutdown Hours 0
0 3,2s3.3
- 14. Hours General On-Line 745 7,281.6 120,474.1
- 15. Unit Reserve Shutd wn Hours 0
0 93.7
- 16. Grcss Therral Energy Gene ated (MKH) 1,417,522 14,410,675 224,616,770 17 Gr ss Ele. Energy Generated (MWM) 502,100 4,910,400 75,(sf,996
- 18. Het Ele:trical Energy Generated (MWH) 460,611 4,696,267 72,212,9s?
- 19. Unit Service Ta:ter 100 99.5 76.7
- 20. Unit Availability Tacter 100 99.5 1 (.1_ _.
- 31. Unit Capacity Ta: tor (Using HDC Net) 95.5 96.1 70.3 _
- 33. Unit Capacity Tactor (Using DER Net) 97.6 97.2 (9.6
- 23. Unit Forced Outage Rate 0
0.5 10.7 34.
Shutdowns Scheduled Over Next 6 M:nths (Type, Date, and Duratien cf Ea:h):
Refueling Outage, April 1, 1999, 35 day duratien 35.
If Shutdown at End of Eeport Period, Estimated Date of Startup:
N/A
- 36. Units in Test Status (Prior to Cc=mercial Operation):
Forcast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELICTRICITY N/A N/A COM{ERCIAL CPERATICN N/A N/A
- o DOCFIT NO. 50-245 UNIT SIIUTDOWNS AND POWER REDUCTIO!!S UNIT NAME Millstone 1 DATE 881101 CCHPI.ETED BT G. Newburgh REPORT PONTII OCTOBER 1988 TELEPItONE (203)447-1791 Extension 4400 No.
Date Type Duration Eeason2 Method of Licensee Sy? tem Component Cause & Corrective l
(Hour?)
Shutting Event Code
- Codes Ac WJn to Down Reactor 3 Report f Prevent Recurrero
~
68-05 881072 r
0 B
5 N/A N/A N/A Power reduction during cleaning opeations of the intake structure traveling screens.
3 Method:
4 Exhibit G - Instructions IF: Forced 2 Reason:
S: Scheduled A-Equircent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5 Exhibit 1 - Same Source G-Operational Error (Explain)
(Duration = 0)
Il-Other (Explain) 6-Other (Explain)
,,. c '
a t
i RETUELING INTOPRATION REQUEST l
1.
Nar.e of facility: Millstene 1 l
l 2.
Scheduled date for next refueling shutdown:
APRIL 1989 i
1 l
3.
Schedule date for restart following refueling: MAY 1989 l
4.
Will refueling er resumptien of eperation thereafter require a technical Jpecification change or cther license amendment?
Yes, Technicial Specificatien Changes Regarding:
(1) Maximum Average Planar Linear Heat Generating Eate
- 12) Maximum Critical Power Eatio i
5.
Scheduled date(s) for suhmitting licensing actien and suppcrting infermatien:
l Winter 1986-89
(,
Important licensing considerations associated with refueling, e.g., neu cr different fuel design er supplier, unreviewed design er performance analysis methods, significant changes in fuel design, new cperating i
procedures:
j 196 GEBB Tuel Asse*blies i
i t
7.
The nu-ler of fuel asserblies (a) in the core and (b) in the spent fuel l
stcrage pool:
j (a)
In Cere:
(a) 580 (b) 1732 8.
The present licensed spent fuel pool storage capacity and the size of f
any increase in licensed storage capacity that has been requested er is planned, in nurter of fuel assertl1es Present caracity, 2184 asserblies
(
Requested in:rease, 1045 assemblies 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
j 1957, Spent Tuel Peel, Full Cere off Lead Capability is Reached l
j Temporary ra:k aperoved f or installati:n if recuired: plans fer l
adattienal caracity in erecress, t
c l
I I
I f
- NORTHEAST UTILITIES o.n.r.i On.c... s.!e., z.r..i. 8.nm. Conn.ciat s.,,-
.s 1
P O box 270
......um.c..c~..---
e........s-,**
H ARTFORD, CONNECTICUT 061410270
.c..... i %.4 i : ~.
L L
J (203) 665 5000
..4.......,~.-...
Novernbor 9, 1988 HP-12441 Ee:
10;rE50. 71 (a)
U.S. Nuclear Regulatcry C::=issi:n D::urant C:ntr:1 Lesk Washingten, D.C.
20!!!
Referen:e:
Tacility Operating License OPE-21 D::ket NO. 50-245 Eear Sir:
In a:::: dance with Millst:ne Unit 1 Te:hr.ical Specificati:n f.9.1.6, the fell: wing conthly cperating data report for Millstene Unit 1 is en:lesed.
One additienal ::py Of the rep::t is en:1: sed.
Very truly y urs NORTHEA!! NU iEAR ENER3Y CCMFANY s
y,(us e a&
Step.en. 5:a:e Stati:n Superintendent Millst:ne Na: lear F:wer Statien SES/GSN:ljs En:lesures:
(4)
- Regi:nal Administrater, Eegion !
William Rayn:nd, Seni:: Resident it.spe:: r
' l