Duke lwr Company Hu 8 hw e

PO Box H198 IkePresident Charlotte, N C 2242 Nuclear Production (704p?] 4M1 DUKEPOWER November 3, 1988 U.S. Nuclear Regulatory Comission Attention: Document Control Desk Washington, D. C.

20555 Subj ect: Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Priority Listing of Operating License Amendments Attached is an update of our September 20, 1988 listing of proposed Operating License and Technical Specification amendments which should be given a priority status over all other proposed amendments. This priority listing contains a brief description of the requested amendment, the submittal date, the date of any followup correspondance, a required issuance date, and the reason for the required issuance date. The amendments are not listed in any particular order and should be pursued based upon the required issuance date.

This listing is intended as guidance to be used in allocating resources for the review and issuance of proposed amendments. This list is not intended to preclude the pursuit of other Operating License or Technical Specification amendments which may need to be given a higher priority. This list will be updated periodically, as needed.

Major changes from the last update are as follows:

. The amendment to correct Table 3.3-10 concerning Accident Monitoring Instrumentation was issuel October 6, 1988 and has been removed from the list.

. The amendment to clarify the shared aspects of the Nuclear Service Water l

(RN) System was issued September 29, 1988 and has been removed from the list.

. The amendment to allow two more fuel cycles for resolution of the cold leg accumulator instrumentation issue was issued October 13, 1988 and has been removed from the list.

. The amendment request submitted on September 9, 1987 for Containment Penetration Conductor Overcurrent Protective Devices has been added to the list.

0811150366 801103 DR ADOCK 05000413 g\\

l %

U.S. Nuclear Regulatory Commission November 3, 1988 Page Two

. The amendment request submitted on August 29, 1988 to clarify requirements for the Monitor Tank Building Control Room Annunciators has been added to the list.

. An amendment request to be submitted in December, 1988 to allow a larger operating band for boron concentration in the Refueling Water Storage Tank (FWST) has been added to the list.

. There is a possibility, depending on the operation of Unit 2, the Unit 2 outage will start in mid-February rather than March 3, 1989. The required lasuance date for itens needed before the Unit 2 outage has been updated to reflect this.

If you have any questions or comments concerning this list or any amendments addressed herein, please advise.

3 Very Truly Yours, f

x Ital B. Tucker PGL/RWO/AMENiiS.PGL 4

Attachment d

i 5

a f

i 1

i

r~

U.S. Nuclear Regulatory Commission November 3, 1988 Page Three xc Mr. M. L. Ernst, Acting Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, GA 30323 Mr. Heyward Shealy, Chief Bureau of Radiological Health South Carolina Department of Health &

Environmental Control 2600 Bull Street Columbia, South Carolina 29201 American Nuclear Insurers c/o Dottle Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue Farmington, CT 06032 M&M Nuclear Consultants 1221 Avenue of the Americas New York, N.Y.

10020 INPO Records Center l

Suite 1500 1100 circle 75 Parkway i

Atlanta, GA 30339 l

Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station i

l l

l

Page No.

1 11/03/08 Duka Powsr Company Catawba Nuclear Station l'riority Operating License Amendments i

Description Submittal Required Need For Date(s)

Issuance Issuance Date Corrections to the ESFAS Table 05/27/88 11/15/88 These changes are cnd epecification concerning 07/28/88 needed to more ths Containment Pressure accurately reflect Centrol System.

the as-built plant.

Fiva changes to the Snubber 12/15/87 11/23/88 The changes T:ch Spec (two of which have 04/15/88 are needed to be:n granted) clarify required snubber inspections.

Approval of use of Direct 02/24/88 11/23/88 Needed to support Gensration Response Spectra 07/05/88 removal of snubbers for Snubber reduction.

09/16/88 during refueling 10/27/88 outage that starts 11/01/88 11/23/88.

Corrections to specification 07/26/88 01/01/89 These changes are 3.7.6 concerning two unit needed to more operation of the Control Room accurately reflect Vcntilation System. Referenco the as-built plant.

LER 413/87-44.

Changes to surveillance 02/15/88 01/01/89 Changes are needed requirements for Auxiliary

'12/15/88 to avoid disabling Fcedwater system for position CA system too of valves, frequently.

Changes to Table 3.3-3 to 08/09/88 01/02/89 This change is modify the Nuclear Service 10/06/88 needed to modify the Water System swapover logic.

RN System to add a third instrument

channel, Grant exemption for complete 10/05/88 02/01/89 Eliminates D/G overhaul to resero number unnecessary testing of failures resulting from of D/G 1A.

Thia faulty pressure sensors, would reduce wear and tear on D/G.

Extension of time to implement 09/14/88 02/15/89 The next Unit 2 upgrade to Unit 2 SPDS.

refueling outage (reference License Condition could start as 8(b))

earlyar Feb. 15, 1989.

Page No.

2 11/03/88 Duko Pow *r Company Catawba Nuclear Station Priority Operating License Amendments Dercription Submittal Required Need For Date(s)

Issuance Issuance Dato

.............................==......................................

Delstion of inspection of 05/24/88 02/15/89 The next inspection Unit 2 Diesel Generator N7 would have to be be ring (reference licenso done at Unit 2 condition (11), Attachment 1, outage which could item 6) start Feb 15, 1989.

Unit 2 D-5 Steam Generator 09/19/88 02/15/89 The modification to Isvol tap relocation.

the S/G taps is scheduled for the Unit 2 outage which could start 2-15-89.

Deletion of Table 3.8-1 09/09/87 03/15/89 This change will Contcinment Penetration help reduce admin Conductor Overcurrent burden and allow Protective Devices appropriate inspection of fuses.

Monitor Tank Building Control 08/29/88 04/01/89 Change is needed to Room Annunciators correctly identify equipment in the Monitor Tank Building.

Deletion of several CA and

~12/15/88 04/01/89 Needed to reflect CF valves from Table 3.6-2.

valves which need not be included in Table 3.6-2 Rnfusling Water Storage Tank

'12/15/08 06/15/89 This change will

()MST) Boron Concentration allow operational Increase operating band, flexibility and may reduce forced shutdowns, i

1 i