Monthly Operating Repts for Oct 1988 for Byron Nuclear Power Station Units 1 & 2
ML20206B148
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/31/1988
From: Pleniewicz R, Spitzer D
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
BYRON-88-1161, NUDOCS 8811150351
Download: ML20206B148 (14)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

DYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO. NPF-37 LICENSE NO. NPF-66 G811150351 831031 PDR ADOCK 00000454

/

R PDC r.\\

(0625H/0062H-2) k

I.

Monthlyleport for Byron _ Unit.1 for the month _of October 1988 A.

Sw!xnary of Operating _ Experience _Isr_ Unit _l The unit was ahutdown for the entire reporting period, for the second refueling outage.

(0625H/0062H-3)

L _QPIRATING_ PA*ULREEDIT DOCKET NO.

050-454 UNIT Byron One DATE:

11/10/88 COMPILED BY:

D. J. Spitzer TELEPHONE:

(815)234-5441 x2023 OPERATING STATUS 1..

Reporting Periods October 1988.

Gross Hours:

745 2.

Currently Authorised Power Levels 3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net) l Max Dependable Capacity: 1105 (MWe-net) 3.

Power Level to Which Restricted (If Any): 1097 (MWe-net)

[

4.

Reasons for Restriction (If Any):

Steam Generator Split flow (23MW) l U

i l

THIS MOUTH YR TO DATE CUMULATIVE

  • 5.

Report Period Hrs.

745 7320 27409 i

6.

Rx Critical Hours 0

5176.4 20488.4

[

7.

Rx Reserve Shutdown Hours 0

0 37.8 y

8.

Hours Generator on Line 0

5144.4 20105.4 9.

Unit Reserve Shutdown Hours 0

0 0

l

10. Gross Thermal Energy (MWH) 0 16148483 59744333
11. Gross Elec. Energy (MWH) 0 5410014 20035791 4
12. Het Elec. Energy (MWII)

-10637 5087939 18827416

13. Reactor Service Factor 0

70.7 74.8

\\,

14. Roactor Availability Factor 0

70.7 74.9

15. Unit Service Factor 0

70.3 73.4

16. Unit Availability Factor 0

70.3 73.4 3

17. Unit Capacity Factor (MDC net) 0 62.9 62.2

[

18. Unit Capacity Factor (DER not) 0 62.1 6).)

f l

19. Unit Forced Outage Hrs.

0 122,5 1034.6 1

20. Unit Forced Outage Rate 0

2.3 4.9 i

t j

21. Shutdowns Scheduled Over Next 6 Months:
22. If Shutdown at End of Report Period, Estimated Date of Startup:

11/06/88 j

23. Units in Test Status (Prior to Commercial Operation): None f

i

  • Note - The cumulative numbers do not reflect power generated prior to commercial i

f service.

3 l

b TGM l

\\

I) i (0625M/0062M-4) t

,w-,-,

m.

C....AYERAGE DAILY UNIT POWER._LEYIL DOCKET NO.:

050-454 UNIT:

Byron One DATE:

11/10/88 COMPILED BY D. J. Spitzer

' TELEPHONE:

(815)234-5441 x2023 MONTH: October, 1988 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.

-14 MW l '..

- 9 MW 2.

-15 MW 17.

-10 MW 3.

-14 MW 18.

-10. W 4.

-14 MW 19.

-11 MW 5.

-14 MW 20.

-14 MW 6.

-14 MW 21.

-13 MW 7.

-14 MW 22.

-12 MW 8.

-14 MW 23.

-14 14W 9.

-14 MW 24.

-15 MW 10.

-15 MW 25.

-17 MW 11.

-13 MW 26.

-21 MW 12.

-10._MW 27.

-22 MW j

13.

-10 MW 28.

-22_MW l

14.

-10 MW 29.

-13 MW 15.

- 9 MW 30.

-12 MW 31.

-19 MW

- INSTRUCTIONS On this form list the average daily unit power level in HWe-Net for each day in the reporting month..

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month.

Note that when maximum dependable capacity is used for the not electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)

In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(0625M/0062M-5)

ocococccocer.ooccceecc<cco R; port Period October, 1988 UNIT SHUTECWNS/REDUCTICNS BTRCN (UNIT 1)

Igre_ Hours ReasS$ Method LER Number System Corponent Cause & Cr,irectiva Action to Prevent Recurrence No.

Date 11.

S 745 C

4 Scheduled Reftsling Outage BIR02 conoceeee***ee.

o Summary cooceeeeeeen...

TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-O the r 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& License Examination 9-Othe r (LER) File (NUREG-Ol61)

(0625M/0062M-6)

  • d :

E. IUNIOQE E PORTING REQUJREMENTS (UNIT 1) for the r3onth of October 1988 9

1.

Safety / Relief valve operations for Unit One.

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUAIED AC21[AT10ti C0ttDITION QE _KYZliT None 2.

Licensee generated changes to ODCM.

(Y/N)

No 3.

I dications of failed fuel.

(Y/N)

N/A Refueling Outage

( 0625M/0062M-7 )

=

T..

LICENSEEJ YENT_REPDR7S (UNIT _11 The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, October 1 through October 31, 1988.

This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence LiutaseA_EYant Report.Neber Data Title of OcrutlanCA 88-007-00 (voluatary) 09/19/88 Loss of Shutdown Cooling During Reactor Cavity Level Lowering Evolution Due to Unexpected Flow Phenomenon 88-008-00 09/21/88 Containment Ventilation Isolation Caused by Radiation Level increase During Reactor Vessel Upper Internals Removal i

Y 4

i L

J

'Y i

(0625H/0062H-8)

I J

II. Monthly _Repoti_Lu_EyIsm_Unil 1_ for thet_ month _of_Qttober 1988 A... Summary _ of ODRIAting_Ixperience for Unit 2 The unit began this reporting period in Mode 1 (Power Operation) at approximately 41% power.

On 10/16/88 at 1702 a power reduction to 35% power was initiated for a steam generator hideout study.

The unit operated at approximately 35% power until 10/21/88 at 0914 when power was ramped up to 45%.

The unit operated at power levels of up to approximately 64% for the rest of the reporting period.

4 l

l I

i L

i 1

?

r (0625H/0062H-9)

o.

B.

OEIRAIIt1Ii_. DATA _EEEDRI DOCKET NO.

050-455 UNIT:

Byron Two DATE:

11/10/88 COMPILED BY D. J. Spitzer TELEPHONE:

(315)?34-5441 x2023 OPERATING STATUS 1.

Reporting Periods October 1988. Gross Hourst 745 2.

Currently Authorized Power Level 3411 (MWt)

Design Electrical Pating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net)

Max Dependable Capacity: 1105 (MWe-net) 3.

Power Level to Which Restri:ted (If Any):

105$ (HWe-net) 4.

Reasons for Restriction (If Any):

Steam Generator Split flow. (65 MW)

TetIS MOtrIH YR TO DATE CUMULATIVE

  • 5.

Report Period Hrs.

745 7320 10513 6.

Rx Critical Hours 745 7226.9 9556.1 7.

Rx Reserve Shutdown Hours 0

0 0

8.

Hours Generator on Line 745 6976.2 9256.6 9.

Unit Reserve Shutdown Hours 0

0 0

10. Gross Thermal Energy (MWH) 1215220 18089673 24561837
11. Gross Elec. Energy (MWH) 394617 6061283 8165594
12. Not Elec. Energy (HWH) 361196 5692954 766.'855
13. Reactor Service Factor 100 98.7 90.9
14. Reactor Availability Tactor 100 98.7 90.9
15. Unit Service Factor 100 95.3 88.0
16. Unit Availability Fact.or 100 95.3 88.0
17. Unit Capacity Factor (MDC net) 43.9 70.4 66.0
18. Unit Capacity Tactor (DER net) 43.3 69 4 65.1
19. Unit rcreed Outage Ers.

0 156.2 443.2

20. Unit Forced Outage Rate 0

2.2 4.6

21. Shutdowns Scheduled Over Hext 6 Months:

1/7/89

22. If Shutdown at End of Report Period, Estimated Date of Startup:
23. Units in Test Status (Prior to C(,'ercial Operation): hone
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

(0625M/0062M-10)

C.

AVERAGE DALLY UNIT POWE]LLEVEL DOCKET 130.t 050-455 l

UNIT:

Byron Two DATE J1/10/88 CCHPILED BY D. J. Spitzer TELEPNCtlE t (415)234-5441 i-x2023

?

MONTH: October, 1988 DAY AVERA DAILY POWER LEVEL N-Net) l

\\

. 405 MW 16.

168 w 1.

i 2.

408 MW 17.

331_MW

_ r, f'

3.'

410_MW 18.

?16 MW 4.

409_MW 19.

_315 MW 5.

407 W 20.

314 W 6.

408 MW

21. __,_

370 MW 7.

454 MW 22.

450 MW 8.

497 MW 23.

465 MW

[

9.

. All_ItW 24.

516_)pf 10.

ill MW 25, 664 MW I

11.

(!!2_)#f 26, 673 MW j

12.

444 MW 27.

656_MW i

13.

4 R MW 28.

651 MW 14.

(11_)fW 29.

662 MW 15.

474 MW 10.

6.1., NW

[

31.

648 MW i

INSTRUCTIONS i

.v On this form list the average daily unit power level in NWe-Net for each day

[

in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used t.o plot a graph for each reporting month. Note that when r+azimum f

dependable capacity is used for the net electricel rating of the unit there l

l may be oc.asions when the daily average power level exceeds the 100% line (or the restricted power level lins.)

In such cases the average daily unit power output sheet should be footnoted to explain the apparert anomaly.

l (0625M/0062M-11) w-

oce.cccc.. reococococoe**

~

R port Period Octooer, 1983 CNIT SHUTDOWNS /REDUCTICNS BTRCN (UNIT 2)

No.

JMa hhh Hours b ason Mej.bqd LER Nu hl System Cornonent Cause & Corrective Action to Prevent Recy.ence NCNE coccc**********

Ne shutdowns during the month of October.

Summary occoo ********

TYPE Reason Method Systep & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibii F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report

& Licenso Examination 9-Other (LER) File (NUREG-0161)

(0625M/0062M-12) i

3 Ul(IQUE REPORTINGWIRDIENIS_.1UNII_2) for the r00 nth of Octohnr 1988 1.

Safety /Nelief valve operations fot Unit Two.

VALVES N0 f. *n ?E PLANT DESCRIPTION DATE A02f1AHD ACTUA110ti CQttDincti QF EVENT None 2.

Licensee generated changes to ODCH.

(Y/N)

No 3.

Indications of failed fuel.

(Y/N)

Yes.

I i31 a 2.0 X 10-3 pcuries/ml.

(06:5M/0062M-13)

L__L LC ENS EE_IVENT_REPDRTLLUN LI_21 tyn The following is a tabular summary of all -Licensee Event Reports for Byron Nuclear Power Station, Unit Two, submitted during the reporting period, October 1 through October 31, 1988.

This information is providad pursuant to the reportable occurrenco reporting requirements as set forth in 10CFR 50.*/3.

Occurrence Licename_XvenLRepotLHumber Data Iltle of_occurrente 88-011-00 09/23/88 Inadequate Manual Containment Phase A Isolation Surve11ance Procedure Resulting in Technical Specification 3.0.3 Implementation i

1 i

i (0625M/0062H-14)

-4 Commonwealth Edison Byron Nucistr Stttion

_,' - 4450 North German Church Rosd Byron, tilinois 61010 v

November 10, 1988 Director, Office of Management Information and Program Control United States Nuclear Regulatory Comission Washington, D.C.

20555 I

ATTN Document Control Desk i

Gentlemen:

Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period October 1 through October 31, 1988.

i Sincerely, e

R. Pleniewicz Station Manager Byron Nuclear Power Station RP/DJS/1h i

I cc:

A.B. Davis, NRC, Region III NRC Resident Inspector Byron i

Gary Wright, Ill. Dept. of Nuclear Safety j

i T.J. Maiman/K.L. Graesser j

H. E. Bliss Nuclear Fuel Services, PWR Plant Support L. Anastasia, Station Nuclear Engineering INPO Records Center

.l L. 01shan - USNEC LTR BYRON 88-1161 FILE:

2.7.200 f

3

,h t

(0625M/0062M-1) i t

\\

L i

--v-

,ey,-%,-

,,-m--

~w.-9_y,em-,ye ew---

w,,-p-,-us.wp.~9%, _ _. _

.wm pyyw_

_yyw y

,.gp m 9q 9

y97y p y

,9-_,,--

p