ML20206A721
| ML20206A721 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 11/04/1988 |
| From: | Winslow T GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML19295G663 | List: |
| References | |
| NUDOCS 8811150227 | |
| Download: ML20206A721 (1) | |
Text
,.
7
?.
GE Nuclear Energy
(
{
cm ne"w vm tx'.:um j
conc cwe November 4, 1988 i
US Nuclear Regulatory Commission Document Control Desk i
Washington, DC 20555
Subject:
REPLY TO NOTICE OF VIOLATION
+
Reference:
(1) NRC License SNM-1097, Docket 70-1113 l
(2) NRC Inspection Report 70-3113/88-12 dated 8/28/88 i
(3) TP Winslow to EJ McAlpine telephone communication f
10/28/88 requesting response date extension l
Thank you for' your letter reporting the results of the 1:a pection conducted at our licensed fuel fabrication plant by L:
0 4
W.
Bates and Mrs. D. A.
Seymour of your office on Augu n 22-26, l
1988.
j i
Based on the reference 3 telephone conversation, an NRC extension i
was granted until November 4, 1988 to respond to this inspection
]
report.
Pertaining to the item of apparent noncompliance with NRC i
requirements in your letter, the reply is given in the Attachmont l
2 1 to this letter.
l I
Pursuant to 10 CFR 2.790(d), GE requests that the attachments to r
i this letter be withheld from public disclosure since these attachments identify details of GE's control and accounting procedures for safeguarding licensed special nuclear material.
We j
also welcome further discussion with your staff, if necessary.
I j
Sincerely, j
l GE NUCLEAR ENERGY l
h
-l- &
i j
T.
Preston Winslow, Manager
]
Licensing & Nuclear Materials Management l
/sbm J
cc:
William E. Cline j
NSD-I
/J f
f 1
i s
2 b(4 474 EM' rs t
l' G811150227 001'.04 ge /W l
/N#
I (DR ADOCN 0700 3
yppg y
[
d
.p**C f
<