ML20206A589

From kanterella
Jump to navigation Jump to search
Forwards Certificate of Svc Certifying That Amend 5 to FSAR Served on Chairman,Benton County Commissioners & Epa,Region X
ML20206A589
Person / Time
Site: Washington Public Power Supply System
Issue date: 06/12/1986
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Stolz J
Office of Nuclear Reactor Regulation
References
GO1-86-0087, GO1-86-87, NUDOCS 8606180264
Download: ML20206A589 (3)


Text

fl..

Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 June 12, 1986 G01-86-0087 Docket No. 50-460 Director of Nuclear Reactor Regulation Attention:

J. F. Stolz, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Ccmmission Washington, D. C.

20555

Subject:

NUCLEAR PROJECT NO. 1 CERTIFICATION OF SERVICE FOR NUCLEAR PROJECT NO. 1 FSAR AMENDMENT NO. 5

Reference:

Letter, Darrell G. Eisenhut, NRC to R.L. Ferguson, Supply System,

" Acceptance Review of Application for Operating License for Washington Nuclear Project, Unit No.1," dated July 16, 1983 In accordance with the instructions included with the reference, enclosed is a copy of the Certificate of Service on the, 1) Chairman, Benton County Commissioners, and 2) EPA, Region X, EIS Review Coordinator, for the subject FSAR Amendment.

l cL G.

Sorensen, Manager Regulatory Programs (280)

GCS: 0AF:llw Enclosure cc:

G. Dick, NRC (MD-116)

N.S. Reynolds; Bishop, Liberman, Cook, Purcell & Reynolds NRC Document Control, DC FDCC (899) 8606180264 860612

(/

PDR ADOCK 05000460 i

K PDR 8

I i

l J

STATE OF WASHINGTON

)

Subject:

R \\ OM\\i'a Cik Snmr I

TShEOd th b County of Benton

)

I, G. C. SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

DATE 8 MWS

,1986 C

G. C. Screpsen, Manager Regulatorf Programs On this day personally appeared before me G. C. Sorensen to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this 4

day of hm)

,1986.

.k M ei n Notary Public in_end for the State of Washington Residing a of n rnd ). (Ott)-,

g, I

BEFORE THE UNITED STATES NUCLEAR REGULATORY C0milSSION Application of WASHINGTON PUBLIC POWER SUPPLY SYSTiM for an Operating License par a Utilization Facility to be known as Washington Public Power Supply System Nuclear Project No. I at its Site in Benton County, Washington STATE OF WASHINGTON

)

)

COUNTY OF BENTON

)

Oliver A. Farabee certifies that copies of Amendment No. 5 to the Final Safety Analysis Report, as part of the application of the Washington Public Power Supply System to operate a nuclear power plant at its Nuclear Project No.1 site on the United States Department of Energy Reservation, Benton County, Washi ngton, were served upon the 1) Chairman, Benton County Commissioners, and 2) EPA, Region X, EIS Review Coordination, EPA by deposit in ' the U.S.

Mail, postage prepaid, on

//.

, 1986

/

Oliver A. Farabee On this day personally appeared before me Oliver A. Farabee to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this ti day of Lv

, 1986.

i Notary Public in and for the State of Washington, Residing at:

,\\

h c %. 4. h u-h a rJ 3

~

7 b

d ae. khmdt, _ \\.O cd.

caps, u

l I

c

>