{} mD
L
.
O
e
APR
'11987
Docket No. 50-440
The Cleveland Electric Illuminating
Company
ATTN: Mr. Murray R. Edelman
Vice President
Nuclear Group
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
K. A. Connaughton, G. F. O'Dwyer and P. R. Wohld, of this office on
January 17 through March 3,1987, of activities at Perry Nuclear Power
Plant, Unit 1, authorized by NRC Facility Operating License No. NPF-58
and to the discussion of our findings with Messrs. M. D. Lyster,
C. M. Shuster, and E. Riley at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
violation of NRC requirements, as described in the enclosed Notice.
With respect to item 1, the inspection showed that action had been
taken to correct the identified violation and to prevent recurrence.
Our understanding of your corrective action is described in Paragraph
4c of the enclosed inspection report. Consequently, no reply to the
violation is required and we have no further questions regarding this
matter at this time.
Regarding the remaining item 2, a written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will
be placed in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
DON 0$8jj44g
\\
\\
.-
.
_ - .
-
-
_ . .
._
.,
i.
.
The Cleveland Electric Illuminating
2 APR
'11987
,
Company
'
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
fl
eff'
R. F. Warnick, Chief
Reactor Projects Branch 1
Enclosures:
1.
2.
Inspection Report
50-440/87003(DRP)
cc w/ enclosures:
J
F. R. Stead, Manager, Perry
l
Plant Technical Department
j
M. D. Lyster, Manager, Perry Plant
Operations Department
Ms. E. M. Buzzelli, General Supervising
Engineer, Nuclear Licensing and
Compliance Section
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Terry J. Lodge, Esq.
James W. Harris, State of Ohio
Robert M. Quillin, Ohio
Department of Health
State of Ohio, Public
Utilities Commission
RIII
17
RIII
Knop /jp
P
ps
Warnick
,