Advises That 870130 Rev 3 to Interim Security Plan for Fuel Storage Consistent w/10CFR70.32(e) & Acceptable,W/Exception of Item Listed in Encl.Previously Approved Plan Should Be Followed Until Clarification Re Item Reviewed & Accepted
ML20205T687
Person / Time
Site: South Texas, 07003016  STP Nuclear Operating Company icon.png
Issue date: 04/01/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Wisenburg R
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8704070364
Download: ML20205T687 (2)


Text

. ,

APR I 1987 In Reply Refer To:

Dockets: 50-498 50-499 Re: NRC Materials License SNM-1972 Docket: 70-3016 Houston Lighting & Power Company ATTN: M. R. Wisenburg, Deputy Project Manager i South Texas Project P. O. Box 1700 Houston, Texas 77001 Gentlemen:

This acknowledges the receipt of your letter of January 30, 1987, by which you transmitted Revision 3 to the South Texas Project Interim Security Plan for Fuel Storage. We have reviewed the information contained in the plan revision and, with an exception, find the changes in the plan to be consistent with the provisions of 10 CFR 70.32 (e). Accordingly, they are acceptable for inclusion into the plan.

I Concerning the exception noted above, we have determined that a portion of that plan appears not to be consistent with the provisions of 10 CFR 70.32 (e)

, in that it appears to lessen the effectiveness of the security program.

Accordingly, in this particular matter listed in the enclosure, you are to follow the previously approved plan until clarification is reviewed and accepted. Therefore, additional clarification about this item is requested.

@ The enclosures to your letter contain Proprietary Information of a type specified in 10 CFR 2.790 (d)(1) and are being withheld from public disclosure.

Sincerely ORIGINAL SIGNED DW J. E. Gagliardo, Chief Reactor Projects Branch

Enclosure:

As stated cc: (see next page)

R :EP&SPS JAF 11y/jt C:EP&S S LAYand C:R&SPB WLFisher C:RPB/k JGLConsl. le C:RPB JEGag f[

rdo g\ 7 3 /p'/87 }/L7/87 3 $ /3s Casework number 70-3016/01-XJ-

[}a /36/

8704070364 870401 PDP ADOCK 05000498 A PDR I k

- + + - , - - -

,y- r -

- g - p wi- w--w- y

( .-

I' 1'

f Houston Lighting and Power Company cc w/ proprietary information:

Houston Lighting & Power Company ATTN: M. Wisenberg, Manager,.

Nuclear Licensing P. O. Box 1700 Houston, Texas 77001 cc w/o proprietary information:

Texas Radiation Control. Program Director bec w/ copy of licensee's response w/ proprietary information:

RIV Security File W. B. Brown, SGMI-J. Gibson, SSPD/NRR IE File Resident Inspector (2)

R. D. Martin, RA R. L. Bangart, DRS&S Security Inspector C:EP&SPS bec w/ copy of licensee's response w/o proprietary informatior.:

v0'M B IE RPB D. Weiss, RM/ALF MIS RIV File Section Chief, RPB/C RSTS Operator R&SPB W. L. Fisher, R&SPB E. H. Johnson, DRS&P R. E. Hall, DRS&P Project Inspector, RPB G. L. Sjoblom, SMPB l

l l

I

i

. The Light NE f Houston Lighting & Power PO. Box 1700 Houston. Texas 77001 (713)228-9211 January 30, 1987 ST-HL-AE-1894 File No.: G18 10CFR70.32(e)

U.S. Nuclear Regulatory Commission 's jF ~

~ '

Attention: Document Control Desk I i' -

Washington, DC 20555 i FEB -31987 h

South Texas Project .

Units I and 2 Docket Nos. STN 50-498, STN 50-499 Interim Fs urity Plan for Fuel Stornee . Revision 3 In accordance with 10CFR70.32(e), Houston Lighting & Power Company is notifying you of minor changes to the Interim Security Plan fcr Fuel Storage at the South Texas Project Electric Generating Station (STPEGS). These changes do not decrease the effectiveness of the STPEGS security program.

(The Interim Security Plan for Fuel Storage supports NRC Materials License No.

SNM-1972 (docket #70-3016) which authorizes -receipt, possession, use, delivery, and transfer of unirradiated fuel assemblies for use at STPEGS.)

The changes to the Interim Security Plan for Fuel Storage are as follows:

1) Upgrade of Nuclear Security Division to Nuclear Security Department.
2) Personnel title changes.
3) Clarified the period of time during which the Plan will be effective.
4) Minor editorial changes Change bars are provided for other than minor editorial changes.

This Plan is designated as Proorietary; the 3 is requested to ensure it is protected against unauthorized disclosure in accordance with 10CFR2.790(d)(1) .

Q

Ilouston Lighting & Power Company ST-HL-AE-1894 File No. GIS Page 2 If you should have any questions on this matter, please contact Mr.

M. A. McBurnett at (512) 972-8530. l A

0

~*K h 4 M. R. Wi, ienburg I Deputy Pi oject Managqr -

PLW/1ja

Attachment:

Interin Security Plan for Fuel Storage, Revision 3 i

ST-HL-AE-1895 File No.: G18 Houston Lighting & Power Company Page 3 cc:

Regional Administrator, Region IV M.B. Lee /J. E. Malaski

  • Nuclear Regulatory Commission City of Austin 611 Ryan Plaza Drive, Suite 1000 P.O. Box 1088 Arlington, TI 76011 Austin, TX 78767 i

N. Prasad Kadambi, Project Manager

  • A. vonRosenberg
  • U.S. Nuclear Regulatory Commission City Public Service Board 7920 Norfolk Avenue P.O. Box 1771 Bethesda, MD 20814 San Antonio, TX 78296 Robert L. Perch, Project Manager
  • Brian E. Berwick, Esquire * '

U.S. Nuclear Regulatory Commission Assistant Attorney General for 7920 Norfolk Avenue the State of Texas Bethesda, MD 20814 P.O. Box 12548, Capitol Station Austin, TX 78711 Dan R. Carpenter Senior Resident Inspector / Operations Lanny A. Sinkin

  • c/o U.S. Nuclear Regulatory Christic Institute Commission 1324 North Capitol Street P.O. Box 910 Washington, D.C. 20002

! Bay City, TX 77414 ~

Oreste R. Pirfo Esquire

  • Claude E. Johnson
  • Hearing Attorney Senior Resident Inspector /STP Office of the Executive Legal Director c/o U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, DC 20555 P.O. Box 910 ~

Bay City, TI 77414 Citizens for Equitable Utilities. Inc.

  • c/o Ms. Peggy Buchorn j M.D. Schwarz, Jr. , Esquire
  • Route 1 Box 1684 4 Baker & Botts Brazoria, TX 77422 1

One Shell Plaza Houston, TX 77002 Advisory Committee on Reactor Safeguards * {

U.S. Nuclear Regulatory Commission i J.R. Newman, Esquire

  • 1717 H Street Newman & Holtzinger, P.C. j Washington, DC 20555 1615 L Street, N.W. i Washington, DC 20036 Mr. John G. Davis, Director Office of Nuclear Material Safety l T.V. Shockley/R. L. Range
  • and Safeguards Central Power & Ligh; Company U.S. Nuclear Regulatory Commission P. O. Box 2121 Washington, DC 20555 Corpus Christi, TI 78403 Revised 1/2/87
  • without attachment i

I l

4

- . , . - - - - - , , .-, . , .- , --