In Reply Refer To:
g
gg
-Dockets: 50-445/86-28
50-446/86-23
TU Electric
ATTN: Mr. W. G. Counsil
Executive Vice President
400 North Olive, L.B. 81
Dallas, Texas
75201
Gentlemen:
This refers to the inspection conducted by Mr. H. S. Phillips and other members
of the Region IV Comanche Peak Group during the period October I through
November 30, 1986, of activities authorized by NRC Construction
Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station,
Units 1 and 2, and to the discussions of our. findings with you and members of
your staff at the conclusion of the inspection.
Areas of construction examined during the inspection included Unit 2 plant
status, Unit 2 general plant inspections, review of 10 CFR 50.55(e) reports,
Unit 2 ASME N-5 Data Report program, and installation of Unit 2 safety-related
components.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspectors. These findings are documented in the
enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 4 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed by:
8704070308 870402
[
03 0500
E. H. Johnson, Director
Division of Reactor Safety and
Projects
Enclosure:
(see next page)
t
RIV:SRRI
RI
DD:
.0IE
C:CPTG.Z'8
IDRSP
HSPhillips
PWagner
RLSpessard
IBarnes
Johnson
3 /go/87
3 /2 7/87
j/g/87
3 /3//87
f/[/87
o
/20
_.
.- -
.-
.
..
.
.,-
,
TU Electric
-2 .
Enclosure:
Appendix - NRC Construction Inspection Report
50-445/86-28
50-446/86-23
cc w/ enclosure:
TU Electric
-ATTN:
G. S. Keeley, Manager
Nuclear Licensing
Skyway Tower
400 North Olive Street
Lock Box 81
J
Dallas, Texas
75201
Juanita Ellis
President - CASE
1426 South Polk Street
Dallas, Texas
75224
Renea Hicks
Assistant Attorney General
Environmental Protection Division
P. O. Box.12548
78711-2548
Administrative Judge Peter Bloch
U.S. Nuclear Regulatory Commission
Washington, D.C.
20555
Elizabeth B. Johnson
Administrative Judge
Oak Ridge National Laboratory
P. O. Box X, Building 3500
Oak Ridge, Tennessee
37830
Dr. Kenneth A. McCollom
1107 West Knapp
Stillwater, Oklahoma
74075
Dr. Walter H. Jordan
881 Outer Drive
Oak Ridge, Tennessee
37830
!
Anthony Roisman, Esq.
Executive Director
Trial Lawyers for Public Justice
2000 P.-Street, N.W. Suite 611
Washington, D.C.
20036
Texas Radiation Control Program Director
,
. . .
.
-
.
.. .
-
t -
g
'
'
TU Electric
3-
-
bec to DMB.(IE01)
bec.distrib. by RIV:
- RPB
- MIS System
- RRI-0PS
- RSTS Operator
- RRI-CONST
- R&SPB
- T. F. Westerman, RSB
DRSP
R. Martin, RA
L. Chandler, OGC
- RSB
- RIV File
- J. Taylor, IE
- D. Weiss, RM/ALF
J. Konklin, IE
- I. Barnes, CPTG
- Project Inspector
- R. Hall
- w/766
"
i
+
'm
1
-
m-
wyr
.wvr--
-.,
-g-
-+ -
p.-
,
y
, -+--- -
3,
_, - ,