ML20205T340
| ML20205T340 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Vermont Yankee |
| Issue date: | 05/30/1986 |
| From: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| FVY-86-46, VYSD-86-56, NUDOCS 8606130115 | |
| Download: ML20205T340 (2) | |
Text
OroY
/, fd VEdMONT YANKEE UCLEAR POWER CORPORATION FVY 86-46 VYSD 86-56 RD 5, Box 169, Ferry Road, Brattleboro, VT 05301
,,,Lyy,
y ENGINEERING OFFICE 1671 WORCESTER ROAD FRAMINGHAM, MASSACHUSETTS 01701 TELEPHONE 617-672-6100 May 30, 1986 U.S. Nuclear Regulatory Commission Office Of Inspection and Enforcement Region I 631 Park Avenue King of Frussia, PA 19406 Attention:
Dr. Thomas E. Murley Regional Administrator
References:
(a)
License No. DPR-28 (Docket No. 50-271)
(b)
Letter, USNRC to VYNPC, NVY 83-43, dated 3/9/83
Dear Sir:
Subject:
Revision 13 to the Vermont Yankee Physical Security Plan The purpose of this letter is to provide you with Revision No. 13 to the Vermont Yankee Physical Security Plan. This revision deletes provisions for Security Force training and qualification which are redundant to the NRC-approved Vermont Yankee Trainina and Qualification Plan for Security (Reference (b)]. This revision reflects full implementation of the Training and Qualification Plan.
We have also revised the Security Plan to clarify the type of weapons available to Security Officers.
l The Plan revision is provided as Attachment A to this letter.
We have reviewed this revision and have determined that the changes do not decrease the safeguards effectiveness of the Plan. Therefore, in accordance with 10CFR50.54(p), prior NRC approval of this revision is not required.
Both the Security Plan and Attachment A are considered SAFEGUARDS INFORMATION, and as such, are be withheld from public disclosure in accor-i dance with the provisions of 10; 173.21.
As required by Vermont Yankee's procedures for the control of SAFEGUARDS l
INF,0RMATION and Section 13.8 of the Security Plan, we have enclosed a Document Custody Form and Change Transmittal Form for each copy of the Security Plan change. We require your cooperation in assuring that these forms are properly i
filled out and returned to us promptly.
.\\
0 8606130115 860530 b
ADOCK 05000270 P,DR g
4
VERMONT YANKEE NUCLEAR POWER CORPORATION U.S. Nuclear Regulatory Commission Attention:
Dr. Thomas E. Murley May 30, 1986 Page 2 We trust that the enclosed information is adequate; however, should you have any questions, please contact Mr. James Sinclair, Security Supervisor, at our plant site.
Very truly yours,
$"f W
Warren P Murphy Vice President an Manager of Operations
Enclosure:
Attachment A, Revision No. 13 to the Vermont Yankee Physical Security Plan ec: Director, Office of Nuclear Reactor Regulation Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20S55 (6 copies) l l
1
{
l l
DOCUMENT TRANSMITTED HEREWITH WHEN SEPARATED FROM ATTACHMENT A, (ATTACHMENT A) CONTAINS HANDLE THIS DOCUMENT AS SAFEGUARDS INFORMATION DECONTROLLED 5
-a