ML20205T152
| ML20205T152 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 03/30/1987 |
| From: | Warembourg D PUBLIC SERVICE CO. OF COLORADO |
| To: | Berkow H NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| P-87128, TAC-44304, NUDOCS 8704070224 | |
| Download: ML20205T152 (2) | |
Text
F
)
Q Public Service'
=%
2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 March 30, 1987 Fort St. Vrain Unit No. 1 P-87128 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Attention: Mr. H. N. Berkow, Director Standardization and Special Projects Directorate Docket No.
50-267
SUBJECT:
Fort St. Vrain Procedure Generation Package Summary Report Evaluation
REFERENCE:
- 1) PSC letter, Gahm to Johnson, dated 10/30/85 1
(P-85386)
- 2) NRC letter, Heitner to Williams, dated 11/13/86 (G-86602)
- 3) PSC letter, Warembourg to Berkow, dated 3/C/87 (P-87095)
Dear Mr. Berkow:
PSC's Procedures Generation Package (PGP) was submitted to the NRC with Reference 1.
The NRC responded to PSC's PGP with the Draft Safety Evaluation (SE) transmitted in Reference 2.
The NRC's SE contained a requirement for PSC to submit a revised PGP by March 13, 1987.
8704070224 e70330 PDR ADOCK 05000267 0)
PDR th
e
.P-87128 Page 2 March 30, 1987 As stated in Reference 3, reviews _and finalization of PSC's response to the_NRC's SE have been delayed because of other high priority work.
During 'a telephone. conversation on March 27,.1987, Dr. Ken Heitner of your staff ' confirmed his understanding that PSC will submit the-revised PGP by April 13, 1987. The 30 day delay from the original submittal date was originally requested by PSC in Reference-3.
Should you have any Mr. M. H. Holmes at (questions concerning this matter, please contact -
303) 480-6960 Very truly yours, D. fr. />L._ _. p=-
D.W.'Warembourg,Manh Nuclear Engineering DWW/XP0:jmt cc: Regional Administrator, Region IV-Attention: _ Mr. J. E. Gagliardo, Chief Reactor Projects Branch Mr. R. E. Farrell Senior Resident Inspector Fort St. Vrain i
j e
'i 4
9 I
d i
A
.\\